Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

N25/N30 - New Ross Bypass [open to traffic]

2456757

Comments

  • Banned (with Prison Access) Posts: 25,234 ✭✭✭✭Sponge Bob


    Not the link from the N25 to the N30....surely


  • Registered Users Posts: 1,070 ✭✭✭purplepanda


    Will the New Ross bypass / River Barrow bridge ever be built? I was assuming that it was already shelved or even canceled but according to the local paper http://www.newrossstandard.ie/news/bypass-project-hasnt-stalled-2895189.html it will still eventually happen!! :rolleyes:

    Are the government & NRA just making excuses to local politicians, this happens often enough so I'm assuming that's still the case here :confused: Everyone knows the country is broke so why not tell the truth??? ;)


    Apologies if this subject is already covered in another tread that I can't find :D


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    Its in an un-cancelled PPP bundle, but its so far down the list that its many, many years off. We can't get people to take the higher priority, possibly cheaper, PPP bundles as it stands.


  • Registered Users Posts: 1,070 ✭✭✭purplepanda


    Thanks MYOB, I suspected as much. :rolleyes:


  • Registered Users, Registered Users 2 Posts: 3,107 ✭✭✭hi5


    I presume PPP means it would be tolled,so one look at the waterford bridge and its high avoidance rate would be an instant turnoff:(


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    hi5 wrote: »
    I presume PPP means it would be tolled,so one look at the waterford bridge and its high avoidance rate would be an instant turnoff:(

    Untolled PPPs can and most likely will exist. There isn't enough traffic for a tolled one to be successful.


  • Registered Users, Registered Users 2 Posts: 5,709 ✭✭✭jd


    Looks like this thread could be active again :-) . Brendan Howlin is set to announce this as one of the schemes to go ahead over the next few years.


  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    jd wrote: »
    Looks like this thread could be active again :-) . Brendan Howlin is set to announce this as one of the schemes to go ahead over the next few years.

    Is Howlin a Wexford TD perchance?


  • Registered Users Posts: 980 ✭✭✭barney 20v


    Is Howlin a Wexford TD perchance?
    yes.. just like Dick Roche in Wicklow and Martin Cullen in Waterford...


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    barney 20v wrote: »
    yes.. just like Dick Roche in Wicklow and Martin Cullen in Waterford...

    While its great to see some activity at long last, the old parish pump crap continues unabaited.

    Still i guess its a good day overall


  • Registered Users Posts: 980 ✭✭✭barney 20v


    While its great to see some activity at long last, the old parish pump crap continues unabaited.

    Still i guess its a good day overall
    Whats parish pump got to do with sorting two well known bottle-necks on two national routes?
    Tourism is a major part of wexfords economy and the road network has been neglected for decades while other south-east counties got upgraded.
    Dublin Rosslare is also a major national asset so i have no problems with Brendan Howlin doing what he should!
    How long was John Browne there and he did nothing...?


  • Registered Users Posts: 77 ✭✭tomflynn


    While its great to see some activity at long last, the old parish pump crap continues unabaited.

    Still i guess its a good day overall

    The 'shovel ready' nature of the N11/N25 schemes has more to do with the previous government and NRA than Brendan Howlin. It was announced as one of the PPP priorities in 2009 by the NRA http://www.nra.ie/PublicPrivatePartnership/SecondPPPRoadsProgramme/


  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    barney 20v wrote: »
    Whats parish pump got to do with sorting two well known bottle-necks on two national routes?
    Tourism is a major part of wexfords economy and the road network has been neglected for decades while other south-east counties got upgraded.
    Dublin Rosslare is also a major national asset so i have no problems with Brendan Howlin doing what he should!
    How long was John Browne there and he did nothing...?

    I think that Newlands Cross, Gorey-Arklow, the Galway bypass, Adare bypass and possibly even ClareGalway would have been bigger bottlenecks. So you cant help wondering if he prioritised them being a local rather than for national importance (even if there is some need for them). Dublin-Rosslare? Who is travelling by road from Dublin to Rosslare other than the odd caravan holiday? You use one port or the other.

    I do of course understand that its the shovel ready schemes that are getting the look in.


  • Posts: 0 [Deleted User]


    Instead of building a bridge across Ireland's second longest river, carrying important regional & international traffic (including much heavy freight from & to ports) away from notorious rush hour jams & improving local transport links, the gombeen political classes of Ireland will now choose to spend the money on useless projects elsewhere. :rolleyes:

    Just watch the Parish Pump politicians of the West demanding that their local projects go to the top of the list instead:mad:

    :D Your post is looking fairly pathetic now, The minister from Wexford announcing roads in wexford at the expense of others and your giving out about parish pump, :rolleyes:


  • Registered Users Posts: 77 ✭✭tomflynn


    I think that Newlands Cross, Gorey-Arklow, the Galway bypass, Adare bypass and possibly even ClareGalway would have been bigger bottlenecks. So you cant help wondering if he prioritised them being a local rather than for national importance (even if there is some need for them). Dublin-Rosslare? Who is travelling by road from Dublin to Rosslare other than the odd caravan holiday? You use one port or the other.

    I do of course understand that its the shovel ready schemes that are getting the look in.

    I think the Newlands Cross N7 / Arklow-Rathnew N11 is proceeding anyway. It is already announced as proceeding (although the start date keeps moving and is still not commenced....)

    Galway City Outer Bypass is caught up in the European Court of Justice http://curia.europa.eu/juris/fiche.j...or=&cid=338236

    The M17/18 (assuming it is announced today) will bypass Claregalway.

    However, I have to agree with you on the Adare Bypass. It was/is a mistake to bundle it with the shelved M20. It should proceed as a standalone project. If the M11/N25 (Enniscorthy/New Ross) and M17/18 proceed, Adare is one of the few remaining true town bottlenecks. I would expect (based on my own opinion) that this should become a strategic priority, irrespective of any M20 proposals.


  • Advertisement
  • Closed Accounts Posts: 88,972 ✭✭✭✭mike65


    The two by-passes will transform the two towns and the lives of the people who use those roads. They are also outstanding projects going back at least a decade as far as I can recall.


  • Registered Users, Registered Users 2 Posts: 2,794 ✭✭✭Bards


    no Mention of New Ross

    http://businessetc.thejournal.ie/government-stimulus-13000-jobs-2-25-billion-nprf-state-assets-523777-Jul2012/

    Over half of that investment, €850 million, will be invested in the motorway network including upgrades to the M11 including a bypass at Enniscorthy, as well as 57km of works on the N17 and N18 to bypass Clarinbridge, Claregalway and Tuam to begin within two years.

    A further 12km orbital route around Galway, bypassing the city – similar to the M50 project around Dublin – is also planned, but is currently stalled due to legal proceedings

    http://www.rte.ie/news/2012/0717/cabinet-set-to-approve-2bn-stimulus-package.html

    An allocation of €850m is being made for upgrading the national motorway and primary route network.

    Projects include the N17/N18 Gort to Tuam motorway, bypassing Clarinbridge, Claregalway and Tuam.

    The M11 Gorey to Enniscorthy project will include a bypass of Enniscorthy.


  • Registered Users, Registered Users 2 Posts: 5,709 ✭✭✭jd


    It's in the release from the Dept of Public Expenditure
    http://per.gov.ie/2012/07/17/speech-by-minister-brendan-howlin-td-government-infrastructure-stimulus/
    Transport
    We will invest in national roads in order to remove bottlenecks and complete the motorway network. Phase 1 of our PPP Programme will see delivery of the N17/N18 Gort to Tuam, the M11 Gorey to Enniscorthy and the N25 New Ross Bypass. A further priority transport project for the Government is the Galway city bypass. This is on hold at the moment pending the outcome of legal proceedings. Depending on the outcome of those proceedings it would be hoped to progress it as an additional PPP project.


  • Registered Users, Registered Users 2 Posts: 2,794 ✭✭✭Bards


    so much for Shovel ready projects

    http://per.gov.ie/2012/07/17/speech-by-minister-brendan-howlin-td-government-infrastructure-stimulus/

    In the Roads sector, the N17/N18 Gort to Tuam will commence in 2013 and the M11 Gorey to Enniscorthy and the New Ross bypass are expected to commence by end 2014.

    A week is a long time in politics never mind 2.5 Years?


  • Banned (with Prison Access) Posts: 8,632 ✭✭✭darkman2


    Any images of the proposed bridge on the New Ross bypass?


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    darkman2 wrote: »
    Any images of the proposed bridge on the New Ross bypass?

    Actually itd be fairly cool to see a proposed map of the road network when all these schemes are complete. Would there be a link to such a thing yet


  • Registered Users, Registered Users 2 Posts: 5,709 ✭✭✭jd


    Actually itd be fairly cool to see a proposed map of the road network when all these schemes are complete. Would there be a link to such a thing yet
    This was posted earlier

    newrossbypass.jpg


  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    jd wrote: »
    This was posted earlier

    newrossbypass.jpg

    Thanks, however what im looking for is the overall map of country with all new schemes includes (Newlands, M17, M11 etc) - i accept its borderline non-topic


  • Registered Users, Registered Users 2 Posts: 33,709 ✭✭✭✭Cantona's Collars


    I think that Newlands Cross, Gorey-Arklow, the Galway bypass, Adare bypass and possibly even ClareGalway would have been bigger bottlenecks. So you cant help wondering if he prioritised them being a local rather than for national importance (even if there is some need for them). Dublin-Rosslare? Who is travelling by road from Dublin to Rosslare other than the odd caravan holiday? You use one port or the other.

    I do of course understand that its the shovel ready schemes that are getting the look in.

    I take it you dont use the N11 or N25 much,the traffic jams in Enniscorthy and New Ross can be horrendous,I've spent up to an hour stuck at the Waterford side of New Ross. The N11 is the primary route for Rosslare Europort and not just a road for Dubs to use to get to their holiday homes.The sooner these jobs start the better.


  • Registered Users Posts: 1,070 ✭✭✭purplepanda


    :D Your post is looking fairly pathetic now, The minister from Wexford announcing roads in wexford at the expense of others and your giving out about parish pump, :rolleyes:

    The New Ross Bypass will benefit three counties not one. It improves trading & transport connections between the UK / Europe through to the South East ports & Cork & the SW regions.

    It is a nationally important route which crosses Ireland's second largest river which has been needed for decades.

    Which projects should be top of the list instead, Greater Dublin, Limerick, Cork, Galway city & adjacent regions excepted?


  • Registered Users, Registered Users 2 Posts: 1,216 ✭✭✭cargo


    I think that Newlands Cross, Gorey-Arklow, the Galway bypass, Adare bypass and possibly even ClareGalway would have been bigger bottlenecks. So you cant help wondering if he prioritised them being a local rather than for national importance (even if there is some need for them). Dublin-Rosslare? Who is travelling by road from Dublin to Rosslare other than the odd caravan holiday? You use one port or the other.

    I do of course understand that its the shovel ready schemes that are getting the look in.


    Actually a lot of trucks leave Dublin and head down the coast to Rosslare Port rather than use Dublin Port. You're forgetting you have to drive when you get off the ferry at the other side also and most trucks prefer the route across the UK from Rosslare. If you ever travel the Dub Wex route you can tell when ferries have landed in Rosslare by the pattern of commercial traffic you meet on the route.


  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    cargo wrote: »
    Actually a lot of trucks leave Dublin and head down the coast to Rosslare Port rather than use Dublin Port. You're forgetting you have to drive when you get off the ferry at the other side also and most trucks prefer the route across the UK from Rosslare. If you ever travel the Dub Wex route you can tell when ferries have landed in Rosslare by the pattern of commercial traffic you meet on the route.

    Fair enough but i dont get their logic (mileage i guess).

    Pick any point on google maps (Limerick, Waterford, even Wexford) and select to goto London. They pick best route via Dublin port every time. Only exception is when your starting point is Rosslare! :eek:


  • Registered Users, Registered Users 2 Posts: 1,216 ✭✭✭cargo


    Fair enough but i dont get their logic (mileage i guess).

    Pick any point on google maps (Limerick, Waterford, even Wexford) and select to goto London. They pick best route via Dublin port every time. Only exception is when your starting point is Rosslare! :eek:

    It's more to do with the condition of the roads than the distance. Ironically enough they're better at this side so some truckers rather clock up the mileage on this side of the water rather than the far side.


  • Registered Users, Registered Users 2 Posts: 2,153 ✭✭✭bkehoe


    Fair enough but i dont get their logic (mileage i guess).

    Pick any point on google maps (Limerick, Waterford, even Wexford) and select to goto London. They pick best route via Dublin port every time. Only exception is when your starting point is Rosslare! :eek:

    Waterford to London via Dublin port would add around 160KM onto the journey. Wexford via Dublin would add almost 200KM. I'd never do this in my car - I live in Wexford and the only times I go to the UK via Dublin port is if I can get the HSS/Swift and am going somewhere no further south than Birmingham. A lorry driver is even less likely to want to do this as the extra cost of fuel would be significant!


  • Registered Users, Registered Users 2 Posts: 5,600 ✭✭✭veryangryman


    bkehoe wrote: »
    Fair enough but i dont get their logic (mileage i guess).
    Pick any point on google maps (Limerick, Waterford, even Wexford) and select to goto London. They pick best route via Dublin port every time. Only exception is when your starting point is Rosslare! :eek:
    Waterford to London via Dublin port would add around 160KM onto the journey. Wexford via Dublin would add almost 200KM. I'd never do this in my car - I live in Wexford and the only times I go to the UK via Dublin port is if I can get the HSS/Swift and am going somewhere no further south than Birmingham. A lorry driver is even less likely to want to do this as the extra cost of fuel would be significant!
    I think driving the extra couple of hours is fairly taxing on ones own personal time. Plus you probably have to stop for a break the extra time with the bad roads. Trade off with both I guess


  • Advertisement
  • Registered Users Posts: 225 ✭✭K3v


    Is there anywhere I could see an image of the proposed bridge?


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    I think driving the extra couple of hours is fairly taxing on ones own personal time. Plus you probably have to stop for a break the extra time with the bad roads. Trade off with both I guess

    For a trucker, the hours destroy how much they can drive the other side when they get there (tacograph limits). More direct route even if its a much longer boat or worse roads = what they'll go for.


  • Registered Users, Registered Users 2 Posts: 5,709 ✭✭✭jd


    K3v wrote: »
    Is there anywhere I could see an image of the proposed bridge?

    Took a bit of searching but at www.mottmac.ie/files/page/444105/roads_websecure.pdf

    I found the following (fwiw)

    214425.jpg


  • Registered Users, Registered Users 2 Posts: 2,153 ✭✭✭bkehoe


    I think driving the extra couple of hours is fairly taxing on ones own personal time. Plus you probably have to stop for a break the extra time with the bad roads. Trade off with both I guess

    Where are the bad roads? Fishguard/Pembroke to London has about 30 miles of good quality single carriageway with bypasses of the towns along the way and then it's dual carriageway and motorway all the way to London. No traffic chaos around the M42 at Birmingham to deal with either.


  • Closed Accounts Posts: 88,972 ✭✭✭✭mike65


    5 mile tailbacks on the Waterford side of the bridge this morning, back to the Rue Glen according to AA Roadwatch

    I wonder who thought holding the National Ploughing Championships at such a bottle neck would be a good idea?


  • Registered Users, Registered Users 2 Posts: 386 ✭✭NedNew2


    12km tailbacks according to the Irish Independent, which sounds about right to the Rhu Glenn.

    That's where the Waterford bypass starts (eastern side)


  • Registered Users, Registered Users 2 Posts: 1,194 ✭✭✭man98


    If there was a Rosslare Waterford rail link was open there wouldn't be half as much que's. It would be much easier and if there was a bus service between Campile or Ballycullane and Ballinaboola


  • Registered Users, Registered Users 2 Posts: 8,779 ✭✭✭Carawaystick


    man98 wrote: »
    If there was a Rosslare Waterford rail link was open there wouldn't be half as much que's. It would be much easier and if there was a bus service between Campile or Ballycullane and Ballinaboola

    If the new ross line was open and the bridge across to the mile tunnel was working then that'd be even better and about as realistic...


  • Registered Users, Registered Users 2 Posts: 7,907 ✭✭✭munchkin_utd


    The indo is now reporting that this project is to go live!
    The National Roads Authority (NRA) will today ask private companies to submit bids to construct the New Ross bypass, which will be the biggest road project ever built in Co Wexford.

    The road, which will not be tolled, will include a 900-metre bridge over the River Barrow.

    The scheme is expected to cost €215m, which includes the land necessary to build the road, and it is hoped that work will begin in 2015 and end in 2017.<snip>
    http://www.independent.ie/irish-news/bottleneck-road-to-get-215m-bypass-29144623.html


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 6,106 ✭✭✭antoobrien


    The indo is now reporting that this project is to go live!


    http://www.independent.ie/irish-news/bottleneck-road-to-get-215m-bypass-29144623.html

    I see no mention of it in the article, but wasn't the Enniscorthy Bypass originally supposed to be bundled with this?


  • Registered Users, Registered Users 2 Posts: 5,081 ✭✭✭fricatus


    The road, which will not be tolled, will include a 900-metre bridge over the River Barrow.

    Nice one!


  • Registered Users, Registered Users 2 Posts: 1,336 ✭✭✭tonc76


    antoobrien wrote: »
    I see no mention of it in the article, but wasn't the Enniscorthy Bypass originally supposed to be bundled with this?

    Certainly was

    http://www.wexford.ie/wex/Departments/Roads/NationalRoadsLiaisonOffice/M11GoreytoEnniscorthyScheme/


  • Registered Users, Registered Users 2 Posts: 6,106 ✭✭✭antoobrien


    tonc76 wrote: »

    Hopefully splitting it will get both done quicker than would have happened otherwise.


  • Registered Users, Registered Users 2 Posts: 5,709 ✭✭✭jd


    antoobrien wrote: »
    Hopefully splitting it will get both done quicker than would have happened otherwise.

    More at
    http://www.irishtimes.com/news/environment/go-ahead-for-215m-bypass-of-new-ross-1.1332791
    Looks like it has indeed been split


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    Has it really been split or is it just poor journalism all around?


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 6,106 ✭✭✭antoobrien


    Has it really been split or is it just poor journalism all around?

    There's no mention of the M11 in either article, so we'll just have to wait for the tender to be published.


  • Registered Users, Registered Users 2 Posts: 1,336 ✭✭✭tonc76


    antoobrien wrote: »
    There's no mention of the M11 in either article, so we'll just have to wait for the tender to be published.

    I'm led to believe that the schemes will be split in 2 ;)


  • Registered Users, Registered Users 2 Posts: 10,754 ✭✭✭✭Jamie2k9


    Great to see the go ahead and times to Rosslare should see a great improvement. All we need now is the few km between Waterford city bypass and new ross to be done as dual carriageway and in time be a motorway to improve journey times all round.


  • Registered Users, Registered Users 2 Posts: 5,081 ✭✭✭fricatus


    Jamie2k9 wrote: »
    Great to see the go ahead and times to Rosslare should see a great improvement. All we need now is the few km between Waterford city bypass and new ross to be done as dual carriageway and in time be a motorway to improve journey times all round.

    That scheme was planned back before everything went kapow. It's suspended now, but it would make sense to do it so as to link the two bypasses:

    http://www.nra.ie/RoadSchemeActivity/KilkennyCountyCouncil/N25WaterfordtoGlenmore/SchemeName,16504,en.html


  • Banned (with Prison Access) Posts: 25,234 ✭✭✭✭Sponge Bob


    I thought there was a missing link in Kilkenny but the missing link is not hideously substandard S2 (from memory) and is around 6 or 7 km long at most.

    Can it be retrofitted as 2+2 between the Waterford Bypass and New Ross bypass schemes??