Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

M20 - Cork to Limerick [preferred route chosen; in design - phase 3]

1910121415170

Comments

  • Registered Users, Registered Users 2 Posts: 7,907 ✭✭✭munchkin_utd


    Deadline fast approaching for motorway objectors
    By Sean O’Riordan
    Friday, April 23, 2010

    OBJECTORS have until close of business on Monday to lodge submissions with An Bord Pleanála in relation to the construction of a €600 million motorway linking Cork and Limerick.
    <snip>

    Cork county engineer Noel O’Keeffe said the project involved constructing a motorway from the Blarney Business Park to Croom, which would include a bypass at Adare and the construction of the Mallow northern relief road.

    "The first phase of the project would be from the Blarney Business Park to north of Buttevant," Mr O’Keeffe said.

    If everything went to plan at the oral hearing, and if funding was put in place, construction of phase one could start as early as 2012.


    When the project was initially costed a few years ago, it was estimated funding would set the Government back €800m.

    However, Mr O’Keeffe said falling prices had meant it could be done for around €600m.

    The Environmental Impact Statement (EIS) for the project is available at council area offices in Cork and Limerick.

    Details of the scheme are also available on Cork County Council’s National Roads Office website www.corkrdo.ie

    Mr O’Keeffe said the motorway would be built under a Public Private Partnership as part of the Government’s plans for the Atlantic Corridor, which is part of Transport 21.

    The new motorway will connect to a new highway, which will run northwards to Letterkenny in Co Donegal.

    http://www.examiner.ie/ireland/deadline-fast-approaching-for-motorway-objectors-117949.html


  • Closed Accounts Posts: 17,733 ✭✭✭✭corktina


    the southern section as defined here would actually take out all the bad bits except for Charleville town. The very worse bit is the bit south of Buttevant which would be included. The road north of Buttevant to Charleville and north from Charleville to the Croom bypass is actually quite acceptable in the short term.


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    Wouldnt say acceptable TBH as a lot of people have died along there (totally due to stupid overtaking and some bad junctions). However, for most people there are some reasonably straight bits and some ok overtaking opportunities.

    Its really Buttevant - Croom that needs doing but the scheme has to be split somewhere. Both bits need doing equally badly and having motorway from Croom to the split, and then to plough into the Buttevant curves would be more ridiculous than coming off the motorway at the split and then being forcefully traffic calmed into Charleville.


  • Banned (with Prison Access) Posts: 25,234 ✭✭✭✭Sponge Bob


    No sign of the Cork NRR EIS yet . I understand that publication has been put back to september (earliest) because Fehilly Timoney were very busy with a windfarm in a bog out in Connemara.


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    Also the Cork NRR has been decoupled from M20 South as far as I know.

    As for Adare and M20 north, I still dont know.


  • Closed Accounts Posts: 17,733 ✭✭✭✭corktina


    Wouldnt say acceptable TBH as a lot of people have died along there (totally due to stupid overtaking and some bad junctions). However, for most people there are some reasonably straight bits and some ok overtaking opportunities.

    Its really Buttevant - Croom that needs doing but the scheme has to be split somewhere. Both bits need doing equally badly and having motorway from Croom to the split, and then to plough into the Buttevant curves would be more ridiculous than coming off the motorway at the split and then being forcefully traffic calmed into Charleville.

    Yes but according to this thread the first bit is Blarney to NORTH of Buttevant meaning the very worst bit past Ballybeg will be in the first section so its misleading to say its "Buttevant to Croom that really needs doing" PLUS that awful two+one will be going, plus Mallow will be bypassed AND Rathduff AND TwopothouseAND Buttevant itself. Its also about 2/3rds of the distance so I think its the right decision.


  • Registered Users, Registered Users 2 Posts: 5,541 ✭✭✭Leonard Hofstadter


    From next Friday it will be faster to go to the Red Cow Park and Ride than it will be to go to Limerick for anyone living on the Southside, in fact if there is a match in Thomond Park it will be faster to go to the Red Cow and come back to Cork again, the Motorway for Limerick can't come quickly enough, I don't care what bit they do first as long as they start doing it!


  • Registered Users Posts: 14 paul1991


    Did anybody else notice three cameras that have been erected just after junction 4 on the m20 heading towards the city. What are they for, are they speed cameras?


  • Closed Accounts Posts: 254 ✭✭The Word Is Bor


    3 cameras on one small over head gantry? They could be ANPR camera which the NRA have previously, and currently are used to form a sort of Origin-Destination matrix in/around the M50. The cameras are on the main arteries to/from the M50 are used to develop a matrix of where vehicles are coming from and where they are going.

    Of course the more data conscious of us might suggest that these could be used for a more nefarious purpose. I wonder do these come under the remit of the data protection act?


  • Closed Accounts Posts: 254 ✭✭The Word Is Bor


    Forgot to mention that the Oral Hearing for the M20 and the N21 Adare Bypass is due to get underway on July 7th in the Charleville Park Hotel for anyone that it is interested.


  • Advertisement
  • Banned (with Prison Access) Posts: 25,234 ✭✭✭✭Sponge Bob


    Forgot to mention that the Oral Hearing for the M20 and the N21 Adare Bypass is due to get underway on July 7th in the Charleville Park Hotel for anyone that it is interested.

    And Peter Sweetman will be there if any of you want to meet him :)


  • Registered Users, Registered Users 2 Posts: 1,494 ✭✭✭cjpm


    Battle for survival over link to motorway

    Friday, July 02, 2010
    The future of a Cork town may depend on a link to the M20, writes Sean O’Riordan






    A BATTLE royale is set to commence next week as a community tries to overturn a decision by the NRA which could seriously damage the future growth of a north Cork town.
    The people of Buttevant were delighted to hear their town was to be bypassed by the new M20— the Cork-Limerick motorway.
    But shock and anger soon crept in when the NRA revealed it was not prepared to build a link road from Buttevant to the new highway.
    All other towns along the 80km route will have slip road connections and even far smaller communities in Grenagh and Rathduff will have better access to the motorway.
    The nearest direct links to the motorway are at Charleville and Mallow, both of which are around 10km from Buttevant.
    However, the objective of the County Development Plan is to reverse the decline in the town so that "its population base and employment capacity will be strengthened in the future".
    The development plan also highlights "an objective to recognise its important strategic position on the Atlantic Corridor and the importance of having high quality links to the national primary route network".
    That’s what Cork County Council planners proposed — but the NRA, it has emerged, doesn’t agree.
    Buttevant Community Council has now employed some big guns to take on the NRA at a Bord Pleanála oral hearing into the motorway. The oral hearing is due to get under way next Wednesday at the Charleville Park Hotel.
    Local solicitor Matt Nagle, chairing a group of objectors, said Tom Hally of McCutcheon Mulcahy consultants will tell the hearing the omission of a link would have a very detrimental effect on the town.
    "We are acutely aware of the benefits of having the town bypassed. But not having a link to the motorway will be disastrous. The NRA is basing its decision on current traffic patterns and not what will be required in the future. The future growth of the town will be totally disadvantaged if this decision is not reversed," Mr Nagle said.
    Auctioneer Tom Sheahan, a former mayor of Cork county, said locals would be delighted the vast majority of the 12,000 vehicles passing through the town on a daily basis would soon be using the motorway.
    The population of Buttevant is currently just over 900. The County Development Plan, however, envisages it will reach more than 1,500 by 2020.
    He said attracting people to live in Buttevant would be far more difficult without a motorway connection.
    Also, the town is desperately crying out for new jobs which, Mr Sheahan says, are unlikely to be created if the link isn’t there.
    "In the early 1980s Buttevant Concrete closed with the loss of 120 jobs. Ballybeg Quarries, which once employed up to 90 people, closed last year. The largest employer in the town is now Greenhall Motors, which has 18 staff," Mr Sheahan said.
    The county council has ensured a lot of infrastructure has been put into the town to aid regeneration.
    Millions of euro has been spent in the last five years on upgrading water, sewage and broadband services, while an adequate amount of land has been zoned for housing and industrial development.
    Mr Sheehan said the town had been bypassed by the Celtic Tiger but it had been hoped to reverse this trend. His wife, Lillian, is trying to promote Buttevant as a tourist destination to bolster the town’s economy.
    Recently thousands of people attended a Red Bull-organised motorcross locally, which followed the exact route of the famous St Leger steeplechase, first run between Buttevant and Doneraile in 1752.
    Ms Sheehan is now organising a medieval festival for the town, which was founded by a Norman family, the Barrys, in 1206.
    "We have such a lot to offer and we’re hoping to capitalise on it. But if there is no connection to the motorway it will make it very difficult to attract in tour buses," Ms Sheehan said.
    The NRA is probably delighted it won’t have to face the wrath of hell-raiser Oliver Reed. The actor, who died 11 years ago, was a regular in the town’s Welcome Inn pub. He lived in the nearby village of Churchtown which will also be put at a disadvantage with no connectivity to the motorway.
    Lisa Fitzgerald, who runs the Welcome Inn with her mother Mary Jo, said they get a lot of passing traffic, especially on big GAA match days in Limerick and Cork.
    "I can’t see these people coming into town any more. They would if we had a slip road. Mallow has two slip roads, and there’s even access to the villages of Mourneabbey and Grenagh. We will be the only town on the 80km route not to have a connection and I’m afraid it will put us back into the dark ages," Ms Fitzgerald said.
    Nigel Doherty, who runs the town’s Centra supermarket, said there would be nothing to attract young couples to the town if the NRA succeeds.
    "It won’t just be bad for Buttevant but for adjoining places like Doneraile, Liscarroll, Lisgriffen and Churchtown," he said.
    Hardware store owner William Hutch recalled in the mid 1990s a plan had been drawn up to create a dual carriageway between Cork and Limerick which had a slip road directly connecting Buttevant. "It’s ridiculous what the NRA is doing," he said.
    Gerry Kelly, principal of the 218-pupil Coláiste Mhuire secondary school, said the NRA was giving the town something with one hand and then taking it away with the other.
    "Ballincollig, for example, has eastern and western slip roads whereas Buttevant is being totally bypassed traffic-wise as well as from a social and economic perspective," he said.
    The principal said the campaign for a new secondary school was continuing, in line with the council’s plans to increase the population in the area.
    Cork County VEC has acquired a site and is waiting for Department of Education approval to go to tender.
    Cllr John Paul O’Shea (Ind) said the county council plan for the town was to see its population increase by 64% by 2020. "Strengthening the commercial and employment base of the town is essential to achieving this population growth," he said.
    This story appeared in the printed version of the Irish Examiner Friday, July 02, 2010



  • Registered Users Posts: 1,829 ✭✭✭KerranJast


    Buttevant is barely above a village. Talk of them expanding is crazy.


  • Registered Users Posts: 3,809 ✭✭✭CerebralCortex


    KerranJast wrote: »
    Buttevant is barely above a village. Talk of them expanding is crazy.

    Yes if people want a large town or city they should move to one.


  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    WHat are they giving out about. Id say all in all about 10 cars a day from Buttevant would use the slip road. All they have to do is travel 10km in either direction for Cork or Limerick.
    Jesus some people in this country and their sense of entitlement :rolleyes:

    and LOL @ Lisa Fitzgerald who thinks that because there is no slip road people wont stop for food in The Welcome Inn. Surely if the journey time is cut to 1hr-45mins people wont be stopping for food anywhere.


  • Registered Users Posts: 1,829 ✭✭✭KerranJast


    Yes if people want a large town or city they should move to one.
    There are already 3 large towns within spitting distance of Buttevant which would take any increase in population in that side of the county.


  • Closed Accounts Posts: 2,017 ✭✭✭invinciblePRSTV


    Gerry Kelly, the school principal quoted, is an idiot. Making a comparison between Buttevant (pop. 1000 and 45 km from Cork) and Ballincollig (pop. 15000 and a suburb of Cork) to justify the town getting a link road to the M20 is ridiculous, he should be laughed out of the room.

    The good burghers of Buttevant need to accept that the M20 isn't there to replace industry that closed in the town in the 1980s, as mentioned in the article, it's to link Cork & Limerick/Galway.


  • Closed Accounts Posts: 17,733 ✭✭✭✭corktina


    not so many years ago the residents of Buttevant got up a petition AGAINST a bypass....

    they will have link roads to the M20...its called the N20 at the moment.


  • Registered Users Posts: 1,668 ✭✭✭brainyneuron


    corktina wrote: »
    not so many years ago the residents of Buttevant got up a petition AGAINST a bypass....

    Thats why macroom never got a bypass in the 80's/90's, the residents thought that their businesses would suffer, bet they regret that now! :rolleyes:


  • Advertisement
  • Banned (with Prison Access) Posts: 25,234 ✭✭✭✭Sponge Bob


    Buttevant is not Ballincollig , mind you Moate , pop 1500 got two exits off the N6 but then again one was to Cowens home town via a since dedeisgnated stretch of the N80 now an R Road.


  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    Sponge Bob wrote: »
    since dedeisgnated

    redesignated?


  • Registered Users, Registered Users 2 Posts: 8,779 ✭✭✭Carawaystick


    Hogzy wrote: »
    redesignated?

    nope. the N80 from Tullamore to Clara is downgraded from national secondary to RsomeThingOrOther


  • Closed Accounts Posts: 17,733 ✭✭✭✭corktina


    nope. the N80 from Tullamore to Clara is downgraded from national secondary to RsomeThingOrOther

    oh so dedeisgnated it is then...


  • Closed Accounts Posts: 3,010 ✭✭✭Tech3


    The M20 was absolutely gridlocked from J4 southbound today. A load of traffic heading to Adare today to the Pro am event. Got a good look at the wire rope to check for any damage and I saw plenty of it. The NRA need to get some better safety barrier for the median than this pile of muck:

    DSC03441.jpg

    Heres a pic of the traffic jammed up badly towards the N20 junction.

    DSC03439.jpg


  • Closed Accounts Posts: 3,010 ✭✭✭Tech3


    A great picture from CCSL on the Limerick forum of the traffic chaos on the southbound carriageway around the same time I was trying to head home at 11:30am.

    IMGP6978.JPG


  • Advertisement
  • Closed Accounts Posts: 17,733 ✭✭✭✭corktina


    what are all those cars doing in the inside lane? :eek:

    Oh I forgot, it isnt the Naas Road is it!


  • Registered Users, Registered Users 2 Posts: 14,015 ✭✭✭✭Mc Love


    Access to the M20 road could be restored...but in all honesty I cant see it happening:

    http://www.limerickleader.ie/news/Access-to-N20-road-could.6400548.jp


  • Registered Users Posts: 1,639 ✭✭✭Zoney


    Mc Love wrote: »
    Access to the M20 road could be restored...but in all honesty I cant see it happening:

    http://www.limerickleader.ie/news/Access-to-N20-road-could.6400548.jp

    If it does happen with a reconfiguration of the Rosbrien interchange itself, it would probably mean that Galway->Cork (i.e. N18 South to M20 South) would not be freeflow - the most likely alteration of the junction configuration would be to have this cross an M20 North to R509 flow via an at-grade roundabout (due to the space, the link from R509 to M20 South and the loop for M7 East would also probably have to go through this at-grade roundabout). In other words, it would only be M20 North to N18 North, M20 North to M7 East and M7 West to M20 South that would remain freeflow.


  • Closed Accounts Posts: 31 Edthehead


    In response to some of your replies regarding Buttevant.
    If one looks at a map of all the junctions on the Cork to Limerick stretch of the proposed M20 (average 7 to 10km) there is one large 18km gap between Mallow and Charleville, now even if there was no town half way between these two junctions that’s a long stretch between junctions (in the UK the longest distance they have between two junctions is 18 miles, they have placed a services half way between these junctions and put up signs warning motorists of the large distance before the next junction) if someone takes the wrong slip road in Mallow and heads north instead of south they will have to travel 38km before they get back to Mallow.

    Common sense tells you a junction should have been planned for Buttevant bearing in mind this junction would also serve Donerail, Churchtown and Liscarroll, the population of these areas including their parishes would be somewhere in the region of 6 to 8 thousand people. The NRA in their wisdom done a traffic count when the streets of Buttevant were dug up for the new sewerage system they apparently came back when the roads were filled back in and done another, how accurate could that have been?

    Buttevant have been promised by the NRA a high quality connection to the M20, the road north of Buttevant has a higher than the national average rate of accidents and fatalities, the road south of Buttevant has twice the national average of accidents, the NRA has stated that the stretch of road north and south of Buttevant is not fit for what it is used for, too dangerous for most road users but grand for the people of Buttevant, is this the high quality connection they are proposing?

    The existing N20 will be downgraded once the M20 opens, that means the council won’t be salting it on frosty mornings, if anyone remembers during the 80’s what Ballybeg was like to drive through on frosty mornings, you can imagine what the accident rate is going to be then. Oh I forgot it won’t matter because it will only be Buttevant people dying.

    This is all about money, the NRA can save themselves 5 million by not putting a junction at Buttevant, the road will pass within one mile of the town, and to me that makes no sense.

    Buttevants population has declined between the late 90’s and 2009 when other towns were expanding it was nearly impossible to get planning for any housing on commercial project due to the inadequate water and sewerage systems in the town. In recent years a lot of land has been rezoned commercial, industrial and housing on the strength of the new systems being installed. These systems are now complete, Buttevant missed out on growth during the Celtic tiger years due to the Council dragging their heels and not upgrading the water and sewerage systems. Now that all that money has been invested the NRA want waste all that investment by not providing the town with a connection. What are the chances of getting any company to set up in newly zoned areas if the have to drive 10km of (in the NRA’s words) dangerous roads.

    The Cork County Council recognised Buttevants potential for growth (64% over the next 10 years) and put the services in place for it, and the NRA ignored all of that and decided to save 5 million. To me this is typical Ireland, its the Gas company digging up the road putting down pipes and re-tarring the road, and two months later the ESB come along and dig it up again to put down cables. You could argue they are two different companies, but the NRA and the County Councils work for the state, no wonder the country is the way it is.


  • Closed Accounts Posts: 31 Edthehead


    KerranJast wrote: »
    Buttevant is barely above a village. Talk of them expanding is crazy.
    Why??
    Hogzy wrote: »
    WHat are they giving out about. Id say all in all about 10 cars a day from Buttevant would use the slip road.

    The statment some people make with no facts... sad!

    All they have to do is travel 10km in either direction for Cork or Limerick.
    Jesus some people in this country and their sense of entitlement :rolleyes:

    :confused:


    and LOL @ Lisa Fitzgerald who thinks that because there is no slip road people wont stop for food in The Welcome Inn. Surely if the journey time is cut to 1hr-45mins people wont be stopping for food anywhere.

    Agree with you there, but her business will suffer if the population declines even more.
    Yes if people want a large town or city they should move to one.

    Another ridiculous statement.
    corktina wrote: »
    not so many years ago the residents of Buttevant got up a petition AGAINST a bypass....

    they will have link roads to the M20...its called the N20 at the moment.

    Again wrong! it was a few traders that objected the residents were all for it.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    Edthehead wrote: »
    the NRA has stated that the stretch of road north and south of Buttevant is not fit for what it is used for, too dangerous for most road users but grand for the people of Buttevant, is this the high quality connection they are proposing?
    Yes the rate of accidents will dramatically decrease once the traffic is taken off the road via the M20 so it will suffice such a small town/village
    The existing N20 will be downgraded once the M20 opens, that means the council won’t be salting it on frosty mornings, if anyone remembers during the 80’s what Ballybeg was like to drive through on frosty mornings, you can imagine what the accident rate is going to be then. Oh I forgot it won’t matter because it will only be Buttevant people dying.

    This is happening in all towns that are being bypassed. Look at Abbeyleix for instance, Since it has been bypassed it is around 10km from the motorway. Those roads are not salted either. Same goes for Thurles and Cashel.
    Now that all that money has been invested the NRA want waste all that investment by not providing the town with a connection. What are the chances of getting any company to set up in newly zoned areas if the have to drive 10km of (in the NRA’s words) dangerous roads.

    Its 10km in fairness, Which will add 5mins to the drive. I dont think the NRA are completely closed to the idea of a slip for Buttevant. Its possible they will build one in the future when there is evidence that Buttevant requires a slip.Can you link to the study as regards the growth rate of the town. It was probably done 3 or 4 years ago and to be fair things have changed alot since then.

    Does anyone know if cost is the only reason they are not building the slip road?


  • Closed Accounts Posts: 31 Edthehead


    KerranJast wrote: »
    There are already 3 large towns within spitting distance of Buttevant which would take any increase in population in that side of the county.

    So your saying some towns should be allowed to develop at the expense of others, if Buttevant wants to develop and expand it should be allowed to. Its location half way between Cork and Limerick, its close proximity to the M20 makes it an ideal distribution centre for Munster, it has a very good chance of growth if it has a local connection to the motorway, without it I think no chance. Look Buttevant may not be everybody's cup of tea I'm sure you all think where you live is better but I was born here grew up here, was abroad for a number of years but moved back in the 90's, its all about communities and on that note its a fantastic place to live. Long may it continue.


  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    Ed can you try consolidate all your replies into one post. It makes it much cleaner and easier to read.

    You really seem to love your town and fair play to you, i love where i come from aswell but 5 million Euro is alot of money for something which has an extremely low demand. Who is to say that Buttevant will have industry flocking to it once it has a link to the motorway. Its no more competitive than any other town in Ireland with or without the link. Not every town in Ireland can have a link to their nearest motorway. Otherwise there would be junction after junction after junction along the routes.


  • Closed Accounts Posts: 31 Edthehead


    Sorry, I've only just noticed the multi quote thingie:D and it was a pain in the *** replying individually.

    True there is no guarantee, but 5 million in the overall cost of this scheme is nothing. To say Buttevant is no different to any other town is wrong because not every other town in the country was the only town on the Cork to Limerick not to get a link and when you consider the average junction distance between each junction would have placed one at Buttevant you can see why were annoyed. I know for a fact the NRA are sitting very uncomfortably at the moment with this issue, time will tell.


  • Closed Accounts Posts: 17,733 ✭✭✭✭corktina


    Edthehead wrote: »
    Again wrong! it was a few traders that objected the residents were all for it.

    didnt see a petition in favour of it from anyone..... and the traders were no doubt residents too were they not?


  • Closed Accounts Posts: 624 ✭✭✭Aidan1


    So your saying some towns should be allowed to develop at the expense of others.

    Yes, it's called spatial planning.
    if Buttevant wants to develop and expand it should be allowed to

    No, it shouldn't. Local and regional planning and zoning decisions are taken by the local authority and by national Govt. Not by a few shopowners in every town in the country. Unless those shop owners are county councillors and can zone their own land for development, but thats a different story.and on thats about to change.

    Buttevant is a small town, about to be bypassed (eventually). This is something that has happened repeatedly in this country in the last 10 years, and the point has to be made (repeatedly) that not every town requires a direct linkage to the motorway. It's not a direct or personal attack on the town or it's population, just a statement of fact. But there's always at least one local journalist determined to make a story out of the fact that people from Buttevant/Gort/Abbyleix/wherever will have to drive 'a whole 5km!' (or whatever) to get to the motorway. Long story short, time to get over it.


  • Closed Accounts Posts: 6,093 ✭✭✭Amtmann


    How do we know that the price of a junction is 5 million out of curiosity? Durrow and Littleton on the M8 find themselves in a fairly similar situation to Buttevant, by the way.

    I am undecided on this. Lord knows the NRA aren't renowned for always designing good junctions, and I wouldn't necessarily put their decision to omit a junction here down to wisdom or best practice.


  • Registered Users, Registered Users 2 Posts: 7,907 ✭✭✭munchkin_utd


    They should toll the shaggin yoke on the 20km central section,
    then the people of buttevant would be loath to use the motorway anyway, negating the need or clamour for a junction!!!
    If going to cork, they'd be happy to drive to few km North of Mallow and catch the fancy link road to the Motorway.

    I say that slightly sarchasticly, but in all seriousness, if the government is skint but building billion euro roads, then a toll on the central section which isnt detrimental to commuters shouldnt be disregarded.

    And it would be good for Buttevant as truckers would avoid the toll and provide trade for their shops etc. ;)


  • Registered Users Posts: 1,639 ✭✭✭Zoney


    I'll admit that on the public consultation (responding to leaflet/questionnaire in the door) I did suggest a junction at Buttevant - the spacing of the junctions seemed to leave a "gap" at Buttevant and there are existing R roads (not just local) that not only serve Buttevant but the surrounding area.

    Population-wise it probably doesn't need it and I would consider it not to be an absolute necessity, but it does seem a bit of an omission in the context of Irish rural motorways (and the level of intercity traffic is such that another junction in such a location won't impact on congestion).

    It was only one of the minor points I mentioned in my reply to the NRA. The biggest objection I had was to N21/M20 junction which in the leaflet was planned as freeflow with no flow for N21 east to M20 south, which I considered a poor omission (I am not a fan of M7/M9 or M7/M8 either). I will freely admit I consider the current roundabout junction plan for N21 and southern bypass of Adare a far far poorer arrangement even if it does allow all flows. Another poor decisions is simply changing Patrickswell West to be a dumbell link to the old N21 (i.e. what is likely to remain the N21 proper for some time now).


  • Closed Accounts Posts: 31 Edthehead


    corktina wrote: »
    didnt see a petition in favour of it from anyone..... and the traders were no doubt residents too were they not?
    You generalised and stated the residents objected, that is simply not true, there was a lot of anger in the town after it was announced there was to be no bypass. We are talking about a long time ago but I was told recently that the bypass was shelved due to Archeology finds on part of the proposed route, I don't know how true this is but the new motorway has been shifted 1km further east of the earlier proposed route.
    "They should toll the shaggin yoke on the 20km central section"
    "And it would be good for Buttevant as truckers would avoid the toll and provide trade for their shops etc."
    "

    We have been informed that the road will be tolled at the Cork end and Limerick end and that there will be none at Buttevant. The last thing Buttevant wants is traffic continuing to run through the town, we want to be bypassed and feel we are entitled to a link. Regardless what any of you think, no one will argue that a direct link will be bad for the town and if anyone of you were in the same position as us you would do the same as we are doing.

    I'm not a trader and a direct link or not will have very little effect on me but anything that threatens the place I call home makes me want to stand up and be counted.
    "Local and regional planning and zoning decisions are taken by the local authority and by national Govt. Not by a few shopowners in every town in the country."
    The re-zoning of lands in Buttevant was part of the Cork County Development plan and Buttevant was singled out as a town with good development potential hence the investment by the Cork County Council in the services. Regardless of the traffic count results the NRA should not have ignored this fact.
    An Board Pleanala are not just concerned with shifting cars from Cork to Limerick but take other factors on board too this hearing could go against us but all we will loose will be the money we raised to funds the reports we got sanctioned, it could also go our way and the NRA may be forced to go back to the planning stage. We have been objecting to this for the last two years but the NRA just dismissed us as if we didn't exist.
    This should never have been allowed to get to this stage but is typical of a lot of the State bodies.

    On the NRA's traffic count details the figures they released fall way short of the figures we received by the private consultant we employed, when he asked for a report on how they came to the results they got they refused to supply them to him. Strange that!

    Finally, does anyone here think a junction at Buttevant would be a bad thing??


  • Advertisement
  • Closed Accounts Posts: 2,017 ✭✭✭invinciblePRSTV


    Edthehead wrote: »
    In response to some of your replies regarding Buttevant.
    If one looks at a map of all the junctions on the Cork to Limerick stretch of the proposed M20 (average 7 to 10km) there is one large 18km gap between Mallow and Charleville, now even if there was no town half way between these two junctions that’s a long stretch between junctions (in the UK the longest distance they have between two junctions is 18 miles, they have placed a services half way between these junctions and put up signs warning motorists of the large distance before the next junction) if someone takes the wrong slip road in Mallow and heads north instead of south they will have to travel 38km before they get back to Mallow.

    I don't think it's justification to build a junction on the basis of people taking wrong turns or because of long distances between junctions, especially when the distance isn't really all that great.
    Edthehead wrote: »
    Common sense tells you a junction should have been planned for Buttevant bearing in mind this junction would also serve Donerail, Churchtown and Liscarroll, the population of these areas including their parishes would be somewhere in the region of 6 to 8 thousand people. The NRA in their wisdom done a traffic count when the streets of Buttevant were dug up for the new sewerage system they apparently came back when the roads were filled back in and done another, how accurate could that have been?

    I think the NRA will have done many traffic counts, amongst other data collection methods, when doing traffic assessments for the area. Your insinuation that somehow the NRA don't have the correct traffic counts for the town are well wide of the mark i'd wager.
    Edthehead wrote: »
    Buttevant have been promised by the NRA a high quality connection to the M20, the road north of Buttevant has a higher than the national average rate of accidents and fatalities, the road south of Buttevant has twice the national average of accidents, the NRA has stated that the stretch of road north and south of Buttevant is not fit for what it is used for, too dangerous for most road users but grand for the people of Buttevant, is this the high quality connection they are proposing?

    Accidents happen because of the large volumes on the existing N20, as mentioned this traffic will be removed when the M20 is built.
    Edthehead wrote: »
    The existing N20 will be downgraded once the M20 opens, that means the council won’t be salting it on frosty mornings, if anyone remembers during the 80’s what Ballybeg was like to drive through on frosty mornings, you can imagine what the accident rate is going to be then. Oh I forgot it won’t matter because it will only be Buttevant people dying.

    Cork County Council grit R roads around county towns also.
    Edthehead wrote: »
    This is all about money, the NRA can save themselves 5 million by not putting a junction at Buttevant, the road will pass within one mile of the town, and to me that makes no sense.

    It's not all about money, it's about connecting the 3 urban area's of Cork, Galway & Limerick. It makes no sense to be plopping expensive junctions along the M20 for every small town or village.
    Edthehead wrote: »
    Buttevants population has declined between the late 90’s and 2009 when other towns were expanding it was nearly impossible to get planning for any housing on commercial project due to the inadequate water and sewerage systems in the town. In recent years a lot of land has been rezoned commercial, industrial and housing on the strength of the new systems being installed. These systems are now complete, Buttevant missed out on growth during the Celtic tiger years due to the Council dragging their heels and not upgrading the water and sewerage systems. Now that all that money has been invested the NRA want waste all that investment by not providing the town with a connection. What are the chances of getting any company to set up in newly zoned areas if the have to drive 10km of (in the NRA’s words) dangerous roads.

    Buttevant will still be able to access the M20 via other exits, and given the redesignation of the N20 you'll have a pretty decent road network and connections given the population and general remoteness of Buttevant.
    Edthehead wrote: »
    The Cork County Council recognised Buttevants potential for growth (64% over the next 10 years) and put the services in place for it, and the NRA ignored all of that and decided to save 5 million. To me this is typical Ireland, its the Gas company digging up the road putting down pipes and re-tarring the road, and two months later the ESB come along and dig it up again to put down cables. You could argue they are two different companies, but the NRA and the County Councils work for the state, no wonder the country is the way it is.

    That 64% figure is an aspirational one, probably made in celtic tiger times and has little meaning in these times. Besides your Buttevant exclusive focus misses out on one key point: The M20 is not about Buttevant, the town needs to accept that the project isn't there to deliver an economic boost to the town. You have to realise the M20s raison d'être isn't to provide an economic stimulus to Buttevant, but to decrease journey times between Cork & Limerick/Galway.


  • Closed Accounts Posts: 31 Edthehead


    Furet wrote: »
    How do we know that the price of a junction is 5 million out of curiosity? .
    This figure was being batted about with talks with the planning people in Cork. As it is a junction for Buttevant was drawn into the first draft of the motorway plan, but was removed by the boys in Dublin.

    Our independent consultants say a junction where an underpass already exists can be built for 2 million but these are the type of junctions I don't like, where cars decelerate on a lane on the motorway and accelerate on a lane. The 5 million (our consultant says it could be closer to 4 million) is a proper separate slip road where deceleration happens once off the motorway.


  • Closed Accounts Posts: 31 Edthehead


    I don't think it's justification to build a junction on the basis of people taking wrong turns or because of long distances between junctions, especially when the distance isn't really all that great..

    It's not justification on its own but it is a factor when you take all our other arguments.

    I think the NRA will have done many traffic counts, amongst other data collection methods, when doing traffic assessments for the area. Your insinuation that somehow the NRA don't have the correct traffic counts for the town are well wide of the mark i'd wager...

    Our independent assessors beg to differ.


    Accidents happen because of the large volumes on the existing N20, as mentioned this traffic will be removed when the M20 is built...

    A lot of the accidents have happened out of peak times, its still a very dangerous stretch of road regardless of volume.


    Cork County Council grit R roads around county towns also...


    It's not all about money, it's about connecting the 3 urban area's of Cork, Galway & Limerick. It makes no sense to be plopping expensive junctions along the M20 for every small town or village...

    True, but this is a very obvious place to have a junction.



    That 64% figure is an aspirational one, probably made in celtic tiger times and has little meaning in these times. Besides your Buttevant exclusive focus misses out on one key point: The M20 is not about Buttevant, the town needs to accept that the project isn't there to deliver an economic boost to the town. You have to realise the M20s raison d'être isn't to provide an economic stimulus to Buttevant, but to decrease journey times between Cork & Limerick/Galway.

    Yes but when a possible economic boost opportunity comes along we'd be fools not to fight for it. The report suggests the town will decline even more without this connection, if it stayed as it is I'd be happy enough as I like where I live but if it declines even more it may not be as attractive anymore.


  • Closed Accounts Posts: 31 Edthehead


    How does this multi quote thing work??

    right I fixed it but there must be an easier way.


  • Closed Accounts Posts: 6,093 ✭✭✭Amtmann


    Edthehead wrote: »
    How does this multi quote thing work??

    Ed, it is the third button over after the "edit" and "quote" buttons. It looks like a square blue button with a white page and two black quotation marks and a little plus sign on it. You simply click that button on all of the posts you'd like to quote from, and then hit the reply button when you're done.


  • Closed Accounts Posts: 31 Edthehead


    Happy days, thanks.


  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    Furet wrote: »
    Ed, it is the third button over after the "edit" and "quote" buttons. It looks like a square blue button with a white page and two black quotation marks and a little plus sign on it. You simply click that button on all of the posts you'd like to quote from, and then hit the reply button when you're done.

    haha, never knew this before.... I love those moments when you discover something new with something you have been using for ages. Like the other day i discovered tetris on the tv at home in the menu section.

    Anyways back on topic


  • Registered Users, Registered Users 2 Posts: 2,794 ✭✭✭Bards


    A few qutoes from today's Irish Examiner

    http://www.examiner.ie/ireland/nra-hopes-to-build-m20-over-two-phases-124467.html

    "THE National Roads Authority hopes to build the 80km motorway linking Limerick with Cork over two phases at an estimated cost of €800 million."


    "So the best case scenario for the NRA is that the full Cork-Limerick motorway – which will form part of the 200km Atlantic Corridor – will be open by 2018."


  • Registered Users Posts: 3,809 ✭✭✭CerebralCortex


    Bards wrote: »
    A few qutoes from today's Irish Examiner

    http://www.examiner.ie/ireland/nra-hopes-to-build-m20-over-two-phases-124467.html

    "THE National Roads Authority hopes to build the 80km motorway linking Limerick with Cork over two phases at an estimated cost of €800 million."


    "So the best case scenario for the NRA is that the full Cork-Limerick motorway – which will form part of the 200km Atlantic Corridor – will be open by 2018."

    2018! WTF!


  • Advertisement
  • Closed Accounts Posts: 624 ✭✭✭Aidan1


    If they're lucky! Capital funds are going to be really really scarce over the coming years, and the two Dublin public transport projects (which have to be built) will take up a lot of that.

    I gather the forthcoming NSS Update will suggest that the core Atlantic corridor (Galway-Cork) be bolstered though, which should strengthen the strategic rationale for this projects.

    Similarly, it will also support other initiatives in the planning area to restrict rezoning by County Councillors in outlying towns, and focus it in the cities. Which suggests to me that the NRA didn't 'ignore' the zoning in Buttevant, they just were aware that (a) national policy has shifted decisively against this type of development, (b) this type of zoned land is exactly the type likely to be de-zoned in the near future, and (c) that Buttevant is therefore highly unlikely to grow significantly (if at all) over the coming years.