Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

A5 - Derry Dual Carraigeway

1356713

Comments

  • Registered Users Posts: 263 ✭✭citycentre


    Northern Ireland's Department of Regional Development has announced it's spending plans for the coming years:

    http://www.drdni.gov.uk/index/publications/publications-details.htm?docid=6734

    Basically the A5 and A8 (Larne) projects (those involving cross border funding) are being prioritized with ALL other road projects being pushed back to 2015 at earliest. This suggests that the funding from the Irish Government is secure.


  • Registered Users Posts: 43 Setanta_og


    This is very positive news for the island.


  • Registered Users, Registered Users 2 Posts: 2,091 ✭✭✭marmurr1916


    Brian Cowen has reaffirmed the Irish government's commitment to give €480 million towards NI roads, including the A5 project:
    Taoiseach Brian Cowen has reaffirmed the Government's commitment to provide €480 million in funding to upgrade roads in Northern Ireland.

    Mr Cowen made his pledge at today's 11th plenary meeting of the North-South Ministerial Council, which was held at the council's new offices in Armagh City.

    ...

    The issue of roads improvement recently triggered controversy when Dublin Central TD Joe Costello warned that a new Government involving Labour may not be able to afford helping finance road upgrades linking the Border with Donegal and improving access to Larne harbour in Co Antrim.

    "The Irish Government remains fully committed to the A5 and A8 (roads) project," said Mr Cowen. "We see this as a project of mutual benefit, opening up the northwest of the country for us. It involves a €480 million commitment and I am glad and proud to say that this Government, despite its difficulties, has not in any way compromised that commitment.

    "It is a huge project for opening up access to the northwest, both to Derry and Donegal, and areas which have in the past seen less development than otherwise would have been the case because of their geographical location," he added.

    http://www.irishtimes.com/newspaper/breaking/2011/0121/breaking52.html

    Can't see that promise being worth much, unless the money is transferred before the general election...


  • Closed Accounts Posts: 6,093 ✭✭✭Amtmann


    I understand the strategic reasons for upgrading the A5 and I'm all in favour of it. But the UK is much bigger and richer than we are. How much are they contributing?


  • Registered Users, Registered Users 2 Posts: 1,107 ✭✭✭nordydan


    Tremelo wrote: »
    I understand the strategic reasons for upgrading the A5 and I'm all in favour of it. But the UK is much bigger and richer than we are. How much are they contributing?


    From here:

    http://www.wesleyjohnston.com/roads/a5omaghstrabane.html

    The ROI is contributing 47%, and Stormont is paying the rest.


  • Registered Users, Registered Users 2 Posts: 721 ✭✭✭mk6705


    Alternative A5 Alliance, Don't Bypass the Bypass and Save Newgrange? Sounds like three band names.


  • Registered Users, Registered Users 2 Posts: 3,223 ✭✭✭overshoot


    anyone notice that the alternative a5 alliance is based in belfast? i always feel the need to question people's motives when the road will not directly affect them.
    the road is needed, it links the biggest and 4th biggest cities on the island. in monaghan i think though it should be linked to the m1 at ardee,the 20km or less build would cost a lot less than building a 50km stretch from ardee to ashbourne where slane would be the only other town of note served by it. all the environmental hastle is going to come out of that area too.
    i would like to see how the new road runs through lifford/strabane, im sure it running west of strabane/omagh was a ROI term for funding as it benefits donegal. it could be quite tricky though with landowners even though it is the current route of the a5. anyone got a link to it


  • Closed Accounts Posts: 185 ✭✭oharach


    I was fine with this until I realised that it meant literally EVERY other piece of planned infrastructure in NI except the A8 Larne dualling (also ROI co-funded) was going to be cancelled.

    I was particularly looking forward to the Lurgan-Knockmore works to improve the speed of the Enterprise. If you read the DRD report, they suggest that if funds are forthcoming, it might be one of the first projects to be reinstated however.

    It may be a road between the 1st and 4th cities, but what is more important is the AADT, which is pretty low all things considered, because of the long distance to Dublin, the historically long journey times, and the much closer economic and political connection to Belfast. In that regard, it's not really comparable to the M7, say, which links a similar size city to Dublin.


  • Registered Users, Registered Users 2 Posts: 3,284 ✭✭✭dubhthach


    is the A5 been proposed as Motorway spec or as 2+2?


  • Registered Users, Registered Users 2 Posts: 116 ✭✭Son of Stupido


    HQDC - i.e. could be reclassified as motorway if all junctions were grade seperated. Most will be.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 1,107 ✭✭✭nordydan


    HQDC - i.e. could be reclassified as motorway if all junctions were grade seperated. Most will be.

    I am not so sure about that, the road may be grade separated but there are two large roundabouts - at Strabane & Ballygawley - and no hard shoulders (just a 1m hard strip).


  • Closed Accounts Posts: 185 ✭✭oharach


    nordydan wrote: »
    I am not so sure about that, the road may be grade separated but there are two large roundabouts - at Strabane & Ballygawley - and no hard shoulders (just a 1m hard strip).

    It is possible (but rare) to have roundabouts under motorway restrictions, e.g. M12/M1 junction between Lurgan and Portadown. You're right about the hard strips though.

    Some of the junctions look a bit dodgy for UK motorway classification, but would probably suffice on ROI standards, given recent practice.


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    I'm guessing this is closer to 2+2 than it is to motorway.


  • Banned (with Prison Access) Posts: 25,234 ✭✭✭✭Sponge Bob


    I think the UK allows 70mph on certain dual carriageways. I understand the mechanism is to apply the Special Roads Act / Highways Acts which create a "Special Road" short of full motorway designation.

    The only question is whether these acts apply to Northern Ireland.


  • Registered Users, Registered Users 2 Posts: 3,284 ✭✭✭dubhthach


    Wesley Johnston has added a strip map of the A5 scheme on his roads website (great site!). There will be a total of 5 at grade roundabouts along the route.

    http://www.wesleyjohnston.com/roads/a5omaghstrabane.html


  • Closed Accounts Posts: 185 ✭✭oharach


    Sponge Bob wrote: »
    The only question is whether these acts apply to Northern Ireland.

    Nope, see section 345(3) of the same Act.

    But see here
    I can't find the legislative basis for this however.


  • Registered Users, Registered Users 2 Posts: 3,223 ✭✭✭overshoot


    oharach wrote: »

    Some of the junctions look a bit dodgy for UK motorway classification, but would probably suffice on ROI standards, given recent practice.

    ROI is actually suprisingly strict on it being min 2 lanes + hard shoulder and proper off ramps for each junction. the reason some dual carrigeways were upgraded lately is because they were designed to motorway standard just put through planning as a dual carrigeways before being reclassed. for some reason it takes a lot less paperwork/impact studies


  • Registered Users Posts: 2,281 ✭✭✭mackerski


    Sponge Bob wrote: »
    I think the UK allows 70mph on certain dual carriageways.

    It's broader than that - 70mph is the default speed limit on dual carriageways...
    Sponge Bob wrote: »
    I understand the mechanism is to apply the Special Roads Act / Highways Acts which create a "Special Road" short of full motorway designation.

    Nope, no need for that, they just need to not impose a lower limit. The entire new A4 scheme, for instance, from Dungannon to Ballygawley is under a default speed limit of 70mph.
    Sponge Bob wrote: »
    The only question is whether these acts apply to Northern Ireland.

    Yes.


  • Closed Accounts Posts: 185 ✭✭oharach


    mackerski wrote: »
    Yes.

    No.

    The Highways Act 1980 cited by Sponge Bob does not apply to NI. I already said this and cited the appropriate section. Here is the link.

    The general speed limit is 70, but not on the basis of the Highways Act.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 7,907 ✭✭✭munchkin_utd


    A5 Public Inquiry begins in the North today
    May 09 2011

    A public enquiry into the planned A5 Western Corridor is beginning today in the North.

    The A5 is the Northern part of the controversial plans to upgrade the N2 from Clontibret to Aughnacloy in Monaghan.

    The first leg of the enquiry takes place in Omagh today, where Overarching Strategic Issues will be discussed.

    The proposed road will then be broken up into three sections - and examined on three separate occasions in the coming weeks.

    Its thought the results of this enquiry could have an impact on the progress of works on the Southern part of the project.
    http://northernsound.ie/news-details.php?nid=6667

    it'll be interesting to see if the enquiry puts a spanner in the works.


  • Registered Users Posts: 66 ✭✭NITransport


    Good to hear the enquiry is underway - probably the most contentious of recent years! Going by past schemes such as the Dungannon - Ballygawley works, it could be 18months+ until we see construction underway.

    Could someone though clarify what works exactly will take part in the south on the N2?


  • Registered Users, Registered Users 2 Posts: 3,284 ✭✭✭dubhthach


    Good to hear the enquiry is underway - probably the most contentious of recent years! Going by past schemes such as the Dungannon - Ballygawley works, it could be 18months+ until we see construction underway.

    Could someone though clarify what works exactly will take part in the south on the N2?

    Well as you can imagine with the current fiancial situation we are kinda in the dark here. Supposedly there is a review going on regarding transport/infrastructure projects so we probably won't know anything until at least October.

    Of course along with the anti-A5 groups in the North you have the "Don't bypass the Bypass" group here who are in alliance.

    Proposed route alignments can be found on Monaghan County Council site here:
    http://www.monaghan.ie/websitev2/roads/N2Clontibret/DocumentsAndDownloads.html

    These seem to be quite recent (Feb this year)


  • Registered Users, Registered Users 2 Posts: 3,284 ✭✭✭dubhthach




  • Registered Users Posts: 66 ✭✭NITransport


    Cheers for the information Dubhthach!

    I'd guess that the N2 improvements would be put on hold and is less priority than say the M20. I've read the rambles of the DBTB action group before and some of their arguments are ridiculous!

    I've read through that report as well with interesting facts like with a dual carriageway in place there'd be 3 times less accidents than currently experienced on the N2.

    But do you know if they're still trying to work out what the upgrade would be, or just where to place it. Is it going to be just continue on as 2+1, or standard dual/expressway or HQDC?

    Cheers,

    NT


  • Registered Users, Registered Users 2 Posts: 3,284 ✭✭✭dubhthach


    Cheers for the information Dubhthach!

    I'd guess that the N2 improvements would be put on hold and is less priority than say the M20. I've read the rambles of the DBTB action group before and some of their arguments are ridiculous!

    I've read through that report as well with interesting facts like with a dual carriageway in place there'd be 3 times less accidents than currently experienced on the N2.

    But do you know if they're still trying to work out what the upgrade would be, or just where to place it. Is it going to be just continue on as 2+1, or standard dual/expressway or HQDC?

    Cheers,

    NT

    Well I not sure tbh I just did a quick google this morning to see what the latest was (I had a vague memory of proposals 6 months ago). I would assume it's 2+2 mainly as 2+1 has been "obsoleted" as a design spec by the NRA. The castleblaney bypass is one of the few bits of 2+1 so I wouldn't be surprised if they want to upgrade that to 2+2 as well.

    Been from Galway I remember viewing the selected route for the M6 Galway to Ballinasloe back in 2003. Of course instead of starting it and getting it done by 2006 they delayed it and all the other inter-urbans by about 4 years. (Money went to digging the hole we currently in!)

    So even if they do get route selection down on this road (N2) by end of this year I can't honestly see anything been done before 2020.


  • Advertisement
  • Registered Users Posts: 66 ✭✭NITransport


    Ah thanks again. Good to hear that if and most importantly when it goes ahead, it should be 2+2 as opposed to +1. I wouldn't hold my breathe for the improvements to happen any time soon either, but hopefully the A5 will continue to progress and we'll have better connectivity with Dublin than we have now at least!

    Regarding Galway and the M6, the story really is repeated time and time again.

    Hopefully the scheme will continue to be progressed as far as possible without major funding in the mean time.


  • Closed Accounts Posts: 6,093 ✭✭✭Amtmann


    THE GOVERNMENT and the Northern Ireland Executive have been urged to tell road engineers to come up with a more cost-effective design for a route linking Aughnacloy, Co Tyrone, with Derry.

    Taoiseach Enda Kenny was quoted last week as saying those involved in the A5 dual-carriageway project should “look at making savings” as the current plan would involve the Government making a contribution of €460 million. At a public inquiry in Co Tyrone yesterday, PlanBetter – a joint initiative involving An Taisce, Friends of the Earth, Feasta and Friends of the Irish Environment – called on the two governments to issue fresh instructions to the road engineers.

    The inquiry is examining proposals by the Northern Ireland Roads Service for a new 85km dual-carriageway from New Buildings, outside Derry, to Aughnacloy where it would join a new dual-carriageway being planned for the N2. “The current instructions given to roads engineers lock North and South into a high-cost venture,” said James Nix, of PlanBetter.

    “Unusually, no lower cost alternative has been brought forward to compare against a greenfield dual-carriageway.” He said the project brief, agreed between Northern Ireland and the Republic at the height of the boom in 2007, called for the 85km four-lane road running substantially in parallel to the existing A5 from Derry to the border with Co Monaghan.

    PlanBetter maintained that traffic volumes “provide no justification for the quantum of spending this involves” and that the alternative of undertaking “selected upgrades” to enhance the existing A5 was “clearly the most practical option”.

    The estimated cost of the project is £800 million (€920 million), with £400 million (€460 million) to come from the Republic.

    “Subsequent events have highlighted the ill-considered nature of a great deal of decision-making in the Celtic Tiger boom-time period, and the treatment of cross-Border road spending was unfortunately no different,” Mr Nix said.

    Local residents, the A5 Alternative Alliance, Belfast-based roads engineers and environmental bodies from both North and South have made detailed representations to the inquiry in favour of upgrading the existing road.
    http://www.irishtimes.com/newspaper/ireland/2011/0513/1224296840564.html


  • Registered Users, Registered Users 2 Posts: 69,545 ✭✭✭✭L1011


    Planbetter must have realised we all think they're cranks down here...


  • Registered Users, Registered Users 2 Posts: 3,284 ✭✭✭dubhthach


    MYOB wrote: »
    Planbetter must have realised we all think they're cranks down here...

    Well it's a whole new market for them to expand into. I doubt most people in Tyrone have ever heard of "An Taisce" ;)


  • Registered Users Posts: 66 ✭✭NITransport


    Whats the liklihood of Planbetter being listened too, from what I can see they seem to have been ignored plenty times before!


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 3,284 ✭✭✭dubhthach


    Whats the liklihood of Planbetter being listened too, from what I can see they seem to have been ignored plenty times before!

    Indeed, with the recent assembly elections up there whose going to get the transport portfolio? What political implications are there that could come into play depending whose got the brief etc?


  • Registered Users Posts: 66 ✭✭NITransport


    Indeed, with the recent assembly elections up there whose going to get the transport portfolio? What political implications are there that could come into play depending whose got the brief etc?

    Well from reading the Belfast Telegraph it does speculate that under the d'hondt system, DUP gets first pick which will be Finance, Sinn Fein gets second and it's looking at going for Enterprise and Investment. UUP then get the third pick and because of they publicly dislike the scheme they could try and go for Regional development. I doubt they'll go for Health and if they did go for Regional Development, you could probably say goodbye to the scheme completely.

    However with the on going negiotations in Stormont, the Telegraph believes Sinn Fein will retain the DRD with Martina Anderson who's from Derry taking the reigns whilst Conor Murphy moves to the Department of Enterprise. I'm sure Martina or any MLA that took the post would continue supporting the A5 scheme. And if Sinn Fein does take contol of Enterprise, more FDI might go to the North West which would make the arguement for the A5 improvement works stronger than ever! This is merely speculation and we won't get the whole picture until Monday.


  • Registered Users, Registered Users 2 Posts: 2,630 ✭✭✭Plowman


    This post has been deleted.


  • Registered Users Posts: 66 ✭✭NITransport


    Could the UUP's ministry jeopardise the scheme?

    I seen this as it unfolded on Twitter too. And the A5 has been a hot topic on both Twitter and Sabre. A journalist from the Ulster Herald had stated that several Tyrone based UUP MLA's openly supported the scheme, and looking at the UUPs election manifesto, it said only a an urgent review of the A5 would be carried out, which doesn't really sound like strong opposition, especially when it is what they were elected on.

    The person who is most against the scheme is non other than Tom Elliott himself, and to be honest, it is highly likely that his leadership will be contested in coming weeks/months after the poor performance during the election and his outburst. Fingers crossed for the more moderate Basil McCrea to take the mantle.

    Finally, there is no point in tug-a-war politics because if the UUP backtrack on SF's work over the past assembly, during the next term, under the d'Hondt scheme, SF will probably choose the Department of Regional Department first before the UUP can, and reinstate the postponed schemes... and ultimately, nothing will get done! I'm hoping that we will see a more mature level of politics in North finally... and it could be in this next term!


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    Thinking about this, I would take a dual carriageway from Omagh (including a full bypass as in the existing plan) to Derry if it meant it would be more likely to happen and there was less opposition as well as less cost.

    The road network in Aughnacloy and to the south is bad in particular but better some sort of dual carriageway than a delayed project heading into another decade perhaps?


  • Registered Users Posts: 761 ✭✭✭Jayuu


    Well from reading the Belfast Telegraph it does speculate that under the d'hondt system, DUP gets first pick which will be Finance, Sinn Fein gets second and it's looking at going for Enterprise and Investment. UUP then get the third pick and because of they publicly dislike the scheme they could try and go for Regional development. I doubt they'll go for Health and if they did go for Regional Development, you could probably say goodbye to the scheme completely.

    Looks like you had your finger on the pulse here, NITransport!

    From today's Irish Times: "Danny Kennedy, the North’s new Minister for Regional Development, has said he would favour reducing the scope of the A5, probably by improving the existing route rather than proceeding with the new dual-carriageway now being proposed.

    In response to a caller to BBC Radio Ulster’s Talkback programme, the Ulster Unionist MLA said many people were concerned by the state of the roads in the North and big schemes like the A5 were taking money away from small rural roads.
    "

    Full article here


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    I always find it hilarious that the border - Derry is being pushed through as quickly as possible. It connects to the N2. Whats on the N2 still? Slane.

    Unless the M1 is signed as the main route to Derry via Ardee, you CANT have Slane sandwiched between the M2 and upgraded A5.


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    I was talking to someone today who told me they actually come to Dublin from Derry by the A6 to Belfast and then straight down the M1 with its advantages of overtaking and higher speed limits. The Glenshane pass is the only bad part of the route. Apparently half an hour quicker but I'm not sure what speed limits were being respected in doing that!


  • Registered Users, Registered Users 2 Posts: 9,234 ✭✭✭sdanseo


    The county town of Co Donegal is only a few miles north of Sligo, which itself needs upgrading. Makes HUGE amounts more sense to upgrade the N5 to M5. Derry, while in a utopic world would be in the Republic, is NOT, and we shouldn't be building a motorway to it. Build it instead to SLigo and HQDC from the into Donegal town. Let the UK build their own roads.


  • Advertisement
  • Registered Users Posts: 66 ✭✭NITransport


    Sdonn, er, Donegal town isn't the biggest town in Donegal. It's Letterkenny, which is close to Derry and the shortest distance between the biggest pop in Donegal and Dublin goes right through Northern Ireland. The UK is still going to pay a majority of the scheme but the ROI gets benefit from it too! Plus the Southern Government has to think, should the "Utopic" day ever come, do they want to have to invest in NI, or would they rather it comes in a turn key package. I'd rather not have to spend money doing up NI's infrastructure at the last minute.


  • Registered Users, Registered Users 2 Posts: 9,235 ✭✭✭lucernarian


    There's an argument to say that the state should be making itself busy improving the deplorable N14 and bypassing Lifford/building the new bridge to link up with the A5 first if they were interested in the connectivity of Letterkenny and much of Donegal. Letterkenny's own traffic situation is not that great I believe either.


  • Registered Users, Registered Users 2 Posts: 69,545 ✭✭✭✭L1011


    sdonn wrote: »
    The county town of Co Donegal is only a few miles north of Sligo, which itself needs upgrading. Makes HUGE amounts more sense to upgrade the N5 to M5. Derry, while in a utopic world would be in the Republic, is NOT, and we shouldn't be building a motorway to it. Build it instead to SLigo and HQDC from the into Donegal town. Let the UK build their own roads.

    Couple of issues here...

    1: The county town of Donegal is Lifford.
    2: The road to Donegal Town from Dublin via Sligo needs minimal work to make it an acceptable standard the entire way. This scheme: http://www.nra.ie/RoadSchemeActivity/SligoCountyCouncil/N4CollooneyCastlebaldwin/SchemeName,16443,en.html

    would make it tolerable virtually the entire way.


  • Registered Users, Registered Users 2 Posts: 9,234 ✭✭✭sdanseo


    MYOB wrote: »
    Couple of issues here...

    1: The county town of Donegal is Lifford.
    2: The road to Donegal Town from Dublin via Sligo needs minimal work to make it an acceptable standard the entire way. This scheme: http://www.nra.ie/RoadSchemeActivity/SligoCountyCouncil/N4CollooneyCastlebaldwin/SchemeName,16443,en.html

    would make it tolerable virtually the entire way.

    ...makes my case for an M4 from Sligo to Mullingar even more appropriate. It would serve more of, y'know, the country paying for it. ;)

    On second thouhgts...perhaps an extended M3 would be better. Nobody would use the M4 to get to Derry (but it would still serve more places than this proposed M2) - but an M3 to Eniskillen, Omagh and Derry would go through less of NI, cost less because there is already motorway as far as Kells, and doesn't have the basket case that is Slane in the way.

    For example...red is M2 Blue with Green N-road D2 spur is M3:

    b7b44.jpg


  • Registered Users Posts: 761 ✭✭✭Jayuu


    sdonn wrote: »

    On second thouhgts...perhaps an extended M3 would be better. Nobody would use the M4 to get to Derry (but it would still serve more places than this proposed M2) - but an M3 to Eniskillen, Omagh and Derry would go through less of NI, cost less because there is already motorway as far as Kells, and doesn't have the basket case that is Slane in the way.

    I suggested a while back that to make the M3 more useful it could actually move back towards Clones and Monaghan after Cavan and link in with the A5 to Derry. That way you would take traffic away from the N2 route and give a full motorway/dual-carraigeway link between Dublin and Derry.

    I know that wouldn't do much for a lot of Donegal traffic. Personally I do think there is a case for the N4 being upgraded as much as possible and improvements in the Donegal links to Sligo.


  • Registered Users, Registered Users 2 Posts: 69,545 ✭✭✭✭L1011


    sdonn wrote: »
    ...makes my case for an M4 from Sligo to Mullingar even more appropriate.

    How does replacing a higher standard of road that already got huge upgrades in the 1990s/2000s with a motorway become more justified than replacing a poor quality road that runs through towns and villages?

    As I said, there is one poor section of the N4 which the NRA plans to replace.

    And also, Lifford is served by the A5, not the N4.


  • Registered Users, Registered Users 2 Posts: 7,040 ✭✭✭Pete_Cavan


    Jayuu wrote: »
    I suggested a while back that to make the M3 more useful it could actually move back towards Clones and Monaghan after Cavan and link in with the A5 to Derry. That way you would take traffic away from the N2 route and give a full motorway/dual-carraigeway link between Dublin and Derry.

    I know that wouldn't do much for a lot of Donegal traffic. Personally I do think there is a case for the N4 being upgraded as much as possible and improvements in the Donegal links to Sligo.

    Sending the M3 back towards Clones and Monaghan after Cavan is a ridiculous idea - Monaghan traffic already uses the M1 to get to Dublin and would continue to do so because it would be a shorter journey than this new M. The M3 should bypass Virginia and head across to Carrick-on-Shannon and continue on to Sligo (as per the link MYOB provided). The M3 is currently well under capacity so using it to serve Cavan, Leitrim, Sligo, north Longford, north Roscommon and south Donegal makes more sense and makes better use of existing infrastructure than developing two routes (N3 & N4) and sending most of this traffic down the M4 which is quickly reaching capacity on approach to Dublin.

    The N2 is grand if it follows the N33 at Ardee and the existing N2 between Ardee and Dublin is detruncked.


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    I also think that the big problem with this scheme is that its being pushed as the be-all-and-end-all with x kilometres of 2+2 or motorway in the north with little to no realistic prospects of any of the route in the REPUBLIC being done soon. You're going to get a nice bit of DC with cart tracks on either side and a very long time before those cart tracks get fixed. It just seems that the money that will be spent on this scheme could be better distributed elsewhere in the system.


  • Registered Users, Registered Users 2 Posts: 1,294 ✭✭✭D.L.R.


    I also think that the big problem with this scheme is that its being pushed as the be-all-and-end-all with x kilometres of 2+2 or motorway in the north with little to no realistic prospects of any of the route in the REPUBLIC being done soon. You're going to get a nice bit of DC with cart tracks on either side and a very long time before those cart tracks get fixed. It just seems that the money that will be spent on this scheme could be better distributed elsewhere in the system.

    +1. Like you say, without its southern counterpart, all this road does is connect a few rural towns to a smallish city. But of course, politics are involved, and there is something of a "peace dividend" in play. Especially for NI nationalists.

    For me, this is just the northern leg of a ham-fisted interurban motorway program, where the skill of the road engineers was unfortunately not matched by the skills of the route planners, who were busy chanting to the failed mantra of "decentralisation".

    Instead of just focussing on connecting all the cities to eachother with as little motorway as possible, they elected to route past every B&B and half way house in the midlands. The legacy is an empty motorway here, an unresolved bottleneck there.

    This attitude has somehow managed to cross the border, and I fear this is ultimately another road that does't quite live up to its price tag.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 2,439 ✭✭✭Richard


    sdonn wrote: »
    ...makes my case for an M4 from Sligo to Mullingar even more appropriate. It would serve more of, y'know, the country paying for it. ;)

    On second thouhgts...perhaps an extended M3 would be better. Nobody would use the M4 to get to Derry (but it would still serve more places than this proposed M2) - but an M3 to Eniskillen, Omagh and Derry would go through less of NI, cost less because there is already motorway as far as Kells, and doesn't have the basket case that is Slane in the way.

    For example...red is M2 Blue with Green N-road D2 spur is M3:

    b7b44.jpg
    Northern Ireland already has an M2 and and M3 so couldn't use those designations in NI.