    Hi,

    For the past 18 months or so I have watched the laying of the Luas track outside the Harbourmaster pub in the IFSC (turn left off Amiens Street just passed Connolly Station).

    The road has been dug up, track laid down, re-dug up, other 'stuff' put uinder the ground, resurfaced, re-dug again etc etc etc. And there's still a big crater in the ground at that spot.

    Does anyone know what is going on here and why they have dug it up so many times over the last 18 or so months?


«1

Comments

  • Registered Users Posts: 1,472 ✭✭✭Rockshamrover


    Yeah, it's called wasting tax payers money. That stretch of track is going to cost millions (I don't know how many but probably tens of millions).

    I cant see why they don't just put a new bus service in place. It would be a hell of a lot cheaper and a lot less disruptive.


  • Registered Users Posts: 78,314 ✭✭✭✭Victor


    pleba wrote: »
    The road has been dug up, track laid down, re-dug up, other 'stuff' put uinder the ground, resurfaced, re-dug again etc etc etc. And there's still a big crater in the ground at that spot.
    Not quite.

    The first operation was to upgrade the bridge and they did that to a stage where they laid the track at the same time. Everything else has beena sequence of investigate, lay new services, connect services to existing buildings, excavate road, build formation, fit track, finish road surface.

    Now, I don't think they have been as expeditious as they could have been, but a lot of track has gone down in the last two months.


  • Closed Accounts Posts: 119 ✭✭pleba


    Victor wrote: »
    Not quite.

    The first operation was to upgrade the bridge and they did that to a stage where they laid the track at the same time. Everything else has beena sequence of investigate, lay new services, connect services to existing buildings, excavate road, build formation, fit track, finish road surface.

    I'm sure though the surface has been laid, then dug up again, then laid again. Is this not the case?


  • Registered Users Posts: 78,314 ✭✭✭✭Victor


    They may dig a trench, put in ducts, fill it in and then put in a neaby duct, but much of the surface is orignal (except those bits where its completely new).


  • Closed Accounts Posts: 10,012 ✭✭✭✭thebman


    Seems to be going on for literally years at this stage. Train was delayed a while back and I had to walk to Grand Canal and they were still working on it! :eek:

    I was :confused: to say the least. It can't take that long to build anything. Any other country, it would have been done long ago, I'm convinced of that.


  • Advertisement
  • Registered Users Posts: 5,323 ✭✭✭dowlingm


    The financial services industry in the IFSC can lose millions for every minute they lose power or telecoms. We can only hope the piecemeal nature of the work is testament to how much care RPA's contractors are taking to ensure that doesn't happen.


  • Registered Users Posts: 161 ✭✭Singer73


    We still have a Financial Services industry?


  • Registered Users Posts: 5,323 ✭✭✭dowlingm


    the old style IFSC industry - plates on the door, networked computers and no people :eek:


  • Closed Accounts Posts: 18,239 ✭✭✭✭WindSock


    As far as I know, there were a lot of pipes layed down in the area that span back over the last century that weren't properly recorded. I am guessing they are coming onto a bit of trouble when they dig up an area that reads wrongly on thier map.


  • Closed Accounts Posts: 10,012 ✭✭✭✭thebman


    Doesn't really explain the one bit they've been working on constantly since I first walked past them (must be nearly two years ago now).

    Its a few feet long. Makes no sense. They should be asked why its taking so long TBH.


  • Advertisement
  • Registered Users Posts: 13,983 ✭✭✭✭Cuddlesworth


    Victor wrote: »
    They may dig a trench, put in ducts, fill it in and then put in a neaby duct, but much of the surface is original (except those bits where its completely new).

    Well just at the entrance coming over the bridge.

    They dug it up and reinforced it.
    Laid the tracks and necessary cables.
    Resurfaced the road.
    Dug up the bridge again.
    Dug up the laid tracks.
    Further reinforced the bridge.
    Installed ducting and cabling.
    Laid the tracks.
    Surfaced the area badly.
    Dug it up.
    Resurfaced it slightly better.

    Currently they are back working on the area having dug it up again. At least they didn't rip up the tracks this time.

    In case anybody's wondering, for over a year my window was right above the works and I have a history of civil construction projects. Actually I've been watching the same 30 metre stretch for just under two years.

    That's pretty bad by anyone's standards.


  • Closed Accounts Posts: 4,858 ✭✭✭paulm17781


    I saw this carry on in Jervis st. when they were doing that line. Track laid then removed.


  • Registered Users Posts: 876 ✭✭✭woodseb


    it's a colossal waste of money. Its been going on outside my office for nearly two years with almost no progress

    the first stop will be outside CHQ so that'll 3 stops within a few 100m of each other. it'll will be quicker for anybody to get off at busaras and walk to a lot of the ifsc


  • Closed Accounts Posts: 10,012 ✭✭✭✭thebman


    Sounds standard Irish. Why do you need a plan, sure we'll just go ahead and work out the problems as we run into them.


  • Registered Users Posts: 14,831 ✭✭✭✭loyatemu


    woodseb wrote: »
    it's a colossal waste of money. Its been going on outside my office for nearly two years with almost no progress

    the first stop will be outside CHQ so that'll 3 stops within a few 100m of each other. it'll will be quicker for anybody to get off at busaras and walk to a lot of the ifsc

    aye - and the next one is at Mayor Squayor which is only another 2 minutes walk.


  • Closed Accounts Posts: 7,221 ✭✭✭BrianD


    woodseb wrote: »
    it's a colossal waste of money. Its been going on outside my office for nearly two years with almost no progress

    the first stop will be outside CHQ so that'll 3 stops within a few 100m of each other. it'll will be quicker for anybody to get off at busaras and walk to a lot of the ifsc


    That's a strange logic. How would it be quicker? The stops are designed to be convenient to the travelling public and both Georges Dock (CHQ) and Mayor Square are logical destinations. Bear in mind that Georges Dock is the proposed site of the Abbey Theatre so in time it will become a busy destination. If I'm travelling from Tallaght it hardly makes sense to alight at Busaras and walk the 300m to Mayor Square.

    It does seem to be slow progress down at the Amiens St. to Guild St stretch but I'd imagine that this is due to the relocation of the utilities and the narrow streets in that particular area. Most of the track is down between the Point Village and behind PWC.


  • Closed Accounts Posts: 119 ✭✭pleba


    Well just at the entrance coming over the bridge.

    They dug it up and reinforced it.
    Laid the tracks and necessary cables.
    Resurfaced the road.
    Dug up the bridge again.
    Dug up the laid tracks.
    Further reinforced the bridge.
    Installed ducting and cabling.
    Laid the tracks.
    Surfaced the area badly.
    Dug it up.
    Resurfaced it slightly better.

    Yep this is why I started this thread. The fact that tracks were laid then dug up then laid again. And we wonder where the public money goes!
    Maybe there are valid reasons for doing this, but surely "getting it right first time" is a motto that should be used more often.


  • Registered Users Posts: 1,472 ✭✭✭Rockshamrover


    woodseb wrote: »
    it's a colossal waste of money. Its been going on outside my office for nearly two years with almost no progress

    the first stop will be outside CHQ so that'll 3 stops within a few 100m of each other. it'll will be quicker for anybody to get off at busaras and walk to a lot of the ifsc

    You are so right. Especially given the current financial climate. Dublin Bus have a couple of hundred spare buses that they have withdrawn from service to save money. 10 of these could be put on this route. The only cost would be the running costs as we already paid for these buses.

    No doubt this route will not make money anyway given the number of people that can possibly use it and given the number of car park spaces in the IFSC.

    I could, of course, be wrong:D


  • Closed Accounts Posts: 301 ✭✭crocro


    pleba wrote: »
    And we wonder where the public money goes!
    I presume this is a 3rd party fixed price contract so that any inefficiencies are at the contractor's cost rather than our cost.
    No doubt this route will not make money anyway given the number of people that can possibly use it and given the number of car park spaces in the IFSC
    The IFSC is a growing work and residential centre for 10s of thousands. There are far fewer parking spaces provided per head than in out-of-town or public sector offices. Most people use public transport to get to work in the IFSC. There is only one public car park that is too expensive for most workers and residents.


  • Registered Users Posts: 14,831 ✭✭✭✭loyatemu


    BrianD wrote: »
    That's a strange logic. How would it be quicker? The stops are designed to be convenient to the travelling public and both Georges Dock (CHQ) and Mayor Square are logical destinations. Bear in mind that Georges Dock is the proposed site of the Abbey Theatre so in time it will become a busy destination. If I'm travelling from Tallaght it hardly makes sense to alight at Busaras and walk the 300m to Mayor Square.

    I suppose it depends on whether the Point-bound trams also divert into connolly. Its been suggested on here that they will eventually run the service as Tallaght-Connolly, and Citywest-Point (with the latter not serving Connolly).

    One stop in between CHQ and Mayor Square would have been sufficient though.


  • Advertisement
  • Registered Users Posts: 7,588 ✭✭✭Bluetonic


    crocro wrote: »
    There is only one public car park that is too expensive for most workers and residents.
    There at least two, Commons Street and Connolly Station. There is tons of free parking around the IFSC which bring 100s of cars into the area daily.


  • Closed Accounts Posts: 301 ✭✭crocro


    Bluetonic wrote: »
    There at least two, Commons Street and Connolly Station. There is tons of free parking around the IFSC which bring 100s of cars into the area daily.
    I never knew about that car park. Where is there free parking? Are the streets not all metered?


  • Registered Users Posts: 7,588 ✭✭✭Bluetonic


    crocro wrote: »
    I never knew about that car park. Where is there free parking? Are the streets not all metered?
    North Wall Quay, Upper Oriel Street, Seville Place, Upper Sherrif St (Guild Street side) are all free and are full daily as used by workers in the IFSC, you'd be lucky to get a spot most mornings after 8.30am

    Upper Buckingham Street and Portland Row are others which are popular and free.


  • Registered Users Posts: 1,472 ✭✭✭Rockshamrover


    crocro wrote: »
    I presume this is a 3rd party fixed price contract so that any inefficiencies are at the contractor's cost rather than our cost.

    The IFSC is a growing work and residential centre for 10s of thousands. There are far fewer parking spaces provided per head than in out-of-town or public sector offices. Most people use public transport to get to work in the IFSC. There is only one public car park that is too expensive for most workers and residents.

    Does anyone know how much this stretch of the Luas is going to cost? Can it still be justified now that the Celtic Tiger has lost it's teeth?


  • Registered Users Posts: 876 ✭✭✭woodseb


    Bluetonic wrote: »
    There at least two, Commons Street and Connolly Station. There is tons of free parking around the IFSC which bring 100s of cars into the area daily.

    if you take the docklands area all the way along the quays to the point there is plenty of free parking, not so much close to the IFSC but there is big car parks for staff under every office building


  • Closed Accounts Posts: 301 ✭✭crocro


    Does anyone know how much this stretch of the Luas is going to cost? Can it still be justified now that the Celtic Tiger has lost it's teeth?
    €54 million accordiong to this:
    http://www.independent.ie/national-news/luas-set-to-pull-up-outside-the-point-in-54m-plan-233555.html

    The line is due to open next year. At this stage most of the work is done and contracts have been signed for the remainder so there would be no point in cancelling a project that we have to pay for anyway. In any case, the less viable public transport projects are those out-of-town. (luas to bray, luas to lucan, metro west etc)


  • Registered Users Posts: 13,983 ✭✭✭✭Cuddlesworth


    Bluetonic wrote: »
    North Wall Quay, Upper Oriel Street, Seville Place, Upper Sherrif St (Guild Street side) are all free and are full daily as used by workers in the IFSC, you'd be lucky to get a spot most mornings after 8.30am

    Upper Buckingham Street and Portland Row are others which are popular and free.

    Honestly, you would be mad to park any cars on those streets for the day and expect them to not have their windows smashed in by the end.


  • Registered Users Posts: 588 ✭✭✭andrewh5


    thebman wrote: »
    It can't take that long to build anything. Any other country, it would have been done long ago, I'm convinced of that.

    Absolutely. Look at the farce that is the M50 for another example. Any other country -especially Germany - would have been working on it 24/7 to get it completed quickly.


  • Registered Users Posts: 5,323 ✭✭✭dowlingm


    The only cost would be the running costs as we already paid for these buses.
    Except the running costs - i.e. personnel - are the costs that always matter!


  • Advertisement
  • Moderators, Category Moderators, Arts Moderators, Entertainment Moderators, Social & Fun Moderators Posts: 16,587 CMod ✭✭✭✭faceman


    Just like the moaning that went on Harcourt Street when the Green Line went in, I bet no one will be moaning about the Luas when its up and running in the IFSC.


Advertisement