Zr105 wrote: » If your not worried about being able to lift individual bales there's an awful lot of lads on dd selling doubles for round the 8-900, they certainly look alright. So long as the box is 100*100 box with 10mm wall and welds are good should be alright,
Greengrass1 wrote: » Seen ones on it in Mayo and Limerick but they don't look that awfully strong. Only a piece of angle iron put down beside the tube. Two brands I seen today and a pin in the middle off them which looked like the could handle more pressure
Zr105 wrote: » This was the one i had in mind, id say its certainly as heavy as the Fleming one anyways,http://www.donedeal.ie/view/6811249 double bale lifters for sale I see the one in Mayo there and i would agree with you on that one alright,
td5man wrote: » Watch that the bales aren't touching each other, saw one being returned to dealer last year for this reason and it was made by a major manufacturer.
Odelay wrote: » Where is the hydrolic tipping they advertised? No sign of ram or hoses. Assume it is either by top link or an extra to be paid for?
maco2000 wrote: » I see a Gleeson’s Double Hydraulic Bale handler with tilt advertised in the Co-op for €1250.
Nekarsulm wrote: » A local engineering firm here in Cavan make these double handlers. The first bale is lifted on the orange lifter, and then it can be slid sideways and upwards until you lift the second one on the green side. Edit, they are located in Co. Leitrim!
Topchar wrote: » I have made up my mind i need one that can lift the first bale off the ground and also tip them on their ends at the stack. Thanks anyway. Has anyone any experience with MDE engineering ones?
oxjkqg wrote: » any interest in this..
oxjkqg wrote: » i used 6mm, plenty strong, 10mm would be a bit 2 heavy. full height is a good job but i went for that size cuz we are getting 1 handler per length of box. Thats for sure, its very well tucked into the tractor and not as severe on the backend..
Limestone Cowboy wrote: » Buy a standard tipping one. It's simple to leave two bales beside each other in the field and pick them then. I'd have it done while you'd blink, no way would I be giving 800-1000 extra for the one that lifts the bale up and to the side.
oxjkqg wrote: » ya welded on 3 bits of wear plate on the bottom. draw bales from a stack during the winter with mine, she gets fair hardship..!! Few pics attached, modified bits a pieces at times, now use curved brackets for the lower links and have the pin-holes moved outwards as some tractor wheels were too close to the handler frame the way i had it... next stop going making a keltec.. also used black end caps for the box on the last couple, welding on caps is grand but not 100% necessary..