1huge1 wrote: » I'm slightly more positive after reading this, better deferred than cancelled, though I don't know how you could build one that is more efficient. Also, where is the €3 billion cost of the tunnel coming from Dart to be extended to Balbriggan by 2022 (via @IrishTimes) http://www.irishtimes.com/news/politics/dart-to-be-extended-to-balbriggan-by-2022-1.2361505
markpb wrote: » Politicians almost never cancel projects, they just defer them or send them back to consultants repeatedly. This is nothing new. DU is dead.
NuMarvel wrote: » The NTA has published the revised business case as well as a presentation. Some of the cost saving alternatives suggested in the presentation include tunnelling to Heuston instead of Inchicore; a shorter tunnel between Heuston and Pearse (i.e. turn back at Pearse with no connection to the northside), and a shorter tunnel with fewer stations (eg none at Christchurch). The first suggestion is the least contentious to me, though we should remember that was the original plan, with an extension to Inchicore proposed later. The shorter tunnel is completely bonkers because it does nothing to take pressure off the loop line. And I don't see how dropping one station, even in conjunction with a shorter tunnel saves much money.
But, at a press event in Dublin today, Mr Donohoe said a business case review of the plan determined that projected number of passengers at the time of its design have not materialised and now a reduced design will be commissioned.
D.L.R. wrote: » Maybe drop the tunnelled section from Heuston to Inchicore? Although that creates new logistical headaches. Can't help but feel that the "savings" from a more efficient design will just be eaten up by the redesign process, more red tape, and the 5 extra years of economic drag resulting from its absence. Moronomics. Disappointing, but not surprising.
I'm an engineer, I know that sometimes it seems that our brains work completely differently to normal people. But the benefits of DART Underground are numerous and self-evident, to quote Joan Burton "a no-brainer". I cannot fathom how the people in power do not see this. Next time around, I recommend that Irish Rail present the exact same plan as previously, add an extra €500 million to the proposed cost and spend that €500 million on PR.
BoatMad wrote: » no doubt the people in power see its advantages , they also have a stack of competing projects, DU lost - simple
Captain Chaos wrote: » Id love to see the project that beat it and why. If you are going to do something do it right and not half arsed. Half arsed is MN and Luas to the airport. It may be cheaper but it's cheap for a reason. Spend more, get more. It's an investment that will pay for itself over the realist of going with an inferior options and then having to re do that option and upgrade it. Measure twice, cut once.
BoatMad wrote: » The Gov has a capital budget, that budget is spread around the country , there are lots if competing projects. a list has to be picked , DU didn't make the cut, end of this story That doesn't mean it cant be re-introduced as a proposal at some later time in some form or other either
Banjoxed wrote: » Well as JM Keynes said, "In the long run we are all dead". Another game of kick the can down the road. Da lads in Nesbitts must have p*ssed themselves laughing at the serfs when this proposal was run by them.
To countenence any other project as an alternative to the Interconnector plan (or DART Underground as it was also known) shows a complete lack of foresight, leadership and common sense.
BoatMad wrote: » actually it shows good engineering sense, engineers are always being asked for alternatives
cgcsb wrote: » This alternative would save only a handful of pennies from an engineering perspective, and add untold sums in planning, and then subsequent retrofitting after it's found to be inappropriate.
BoatMad wrote: » Theres no kicking the can down the road, the project is effectively dead
Grandeeod wrote: » But the only alternatives are weaker ones.
Ren2k7 wrote: » There's an election next year so voice your disapproval for this monumental cock-up by voting for alternatives to FGLAB. It doesn't have to be the Shinners, the SD's or even Renua would be a welcome alternative to this bunch of wasters.