tomieen jones wrote: » 8ft by 8ft by 9" depth is what in cubic metres of concrete? And could I get a small order like this delivered? A base for a silo !approx what cost if it could be delivered in West limerick north kerry
tanko wrote: » If you know anyone who drives a ready mix lorry, they would sometimes have a small amount like that left over on jobs and might give it to you if you throw them a few quid.
MickeyShtyles wrote: » Have all those lorries not got gps on them like the oil tankers do?
ford 5600 wrote: » Most concrete suppliers have a minimum charge, could be the price of 3 or 4 metres of concrete. You might as well ready a place to put the rest of the load, and get it laid , if you have to pay for it ? Crush floor , floor in a small shed? Rarely that we haven't sum corner for it.
darragh_haven wrote: » Mixed 1 cubic of concrete this morning on my own before going to work. Got up just before six, mixed, placed and was washed up for 8. It's not that bad but I wouldn't be doing it every day. A 2 person crew would be fine doing 1.5 meters in a once of situation. I tried 3 local-ish concrete companies and they had no more interest in supplying anything under 2 meters. All trucks have GPS tracking, so no point slipping the driver a €50. Edited - one crowd said they could send one meter of 30newton next week when a farmer 5 miles away was due to get a few loads. And it'd be €135 +Vat. Balls to that
IH784man wrote: » If you have a tractor and trailer or a car/jeep with a trailer you could go to the yard and get the amount you want.
lakill Farm wrote: » and I was told I was mad to buy a pan mixer :rolleyes: put in concrete posts around my silage bales last week 2 evenings, 10 mins and the first mix was done of 1.0m3 of concrete costing me under €30 then about 40 mins later we needed another mix and BOOM it was ready and mixing as we set up the next few posts
and I was told I was mad to buy a pan mixer
Bullocks wrote: » How many bags of cement do you put into a metre and does you mixer make a metre at a time or less ?
Pacoa wrote: » What type of pan mixer did ya get?
lakill Farm wrote: » 1m3 of concrete weights 2.4 ton I think so 1.5m3 is over 3.5ton weight plus trailer.
td5man wrote: » Bring a metre of concrete behind the jeep occasionally, you'd know you had it behind you.
lakill Farm wrote: » wht price is a meter of readymix ex quarry?
td5man wrote: » About the same as it's delivered. €70 I think it was the last time.
lakill Farm wrote: » 5 bags, 5 scoops of a 4ft bucket of mini digger and 4 gallons of water I poured a 50ft x 22ft floor 3 years ago and 21 meters in it. 2 Saturday afternoons did it . its a 0.8M3 but easy it does 1m3
Bullocks wrote: » I think a mate of mine is using about 12 bags per metre , I wonder is he overdoing it . 4 gallons seems very little , would it be very dry at that