Deleted User wrote: » Yep crash reported at Rathcoole. Jesus, is there no end to it, probably some muppet playing with the phone. These days I throw the phone on the back seat and use the bluetooth. I don't want the embarrassment of a crash , probably someone texting their mates to avoid the N7 ! Even before the crash though the Traffic was mental. NRA website says the 3 lane upgrade from Naas to Newbridge is in "planning" so probably a few years before it's finished. tomtom traffic live is great to check before you leave work. the M50 is a car park the whole way north ! Dublin seriously needs an underground and a decent rail network, that Luas is crap and too slow !
Middle Man wrote: » ...and forget this cycling crap too. Rail is what's needed in Dublin! Now, what about DART Underground for a start?
AugustusMinimus wrote: » I presume this will be quite an easy job. Tarmac over the wide central median and introduce a concrete central median and job done with some tie in work at the end. Should be quite cheap all told ?
JeffK88 wrote: » I could be wrong but its alot more than just that. I believe the Newbridge/Naas junction is to be rebuilt and moved further down and a new junction is to be constructed at the new kerry foods plant on the Naas bypass linking the ring road to the sallins bypass ( Not sure if this part is a separate project) but its a pretty significant upgrade overall .
Deleted User wrote: » Is there a map of these proposed works ?
NedNew2 wrote: » That's correct, I read the An Bord Pleanala report only last night. A whole new interchange is to be built 700m further west from the existing Naas/Newbridge junction (Jn 10).
AugustusMinimus wrote: » While I want to see this scheme go ahead, I think more Garda presence on the Naas dual carriageway would be most welcome. The de facto capacity of this road would be raised significantly if Garda would come down hard on people with more lane discipline. MLMs reduce this section of road effectively from 3 lane down to 2 lane with their antics. Very frustrating and for the most part, this behaviour is allowed to continue by the Gardaí who care for nothing less than doing speed checks.
It is proposed to widen 13 km of the existing two-lane dual carriageway to D3M standard between the Maudlin's interchange (J9) and the M7/M9 junction (J11).[19] The upgrade would include widening the existing carriageways to three lanes in each direction and modifying bridges and junctions on the route to accommodate the extra lane.
AugustusMinimus wrote: » Just a thought, but when the road network was being built day 1, the M9 should have been diverted to the N81 and dualled all the way into Dublin. Having 3 national routes to regional cities all starting off on the N7 was madness in retrospect.