beertons wrote: » There'll probably be a 60km speed limit on it!
janedoe75 wrote: » went over at around 7.30; traffic slow enough this morning on N& (coming from portarlington) and I'm still in work 10 minutes early - Im never early! Though M50 southbound moved better this morning as well - not sure it thats a direct result!
beertons wrote: » Sure there's no place to park a van. God I was so stupid.
Hotblack Desiato wrote: » Sticking to the limit through a works area is stupid??
slinky2000 wrote: » Live drive was saying its heavier than normal from m1 junction to j12 southbound this morning.
Bummer1234 wrote: » Also after watching finnharpsboy's vid, Is there street lights on the left hand side near the end not turned on yet?
Hackery wrote: » Great news that's it's finally open and seems to be well finished. We've all been waiting a long time for this one. Looking forward to using it later.
Chris_5339762 wrote: » I remember one at Goffs. If you get really bored, look at http://maps.osi.ie/publicviewer/#V1,588882,739883,0,10 and the historical maps. Should all be on there.
Larbre34 wrote: » A couple of issues this morning, fog and a full road closure of Crumlin Road due to an incident had traffic diverting into an unusual pattern. However something different was causing congestion between J9 Red Cow and J10 Ballymount southbound and from my visual of it, it was conflict of a high volume of traffic hitting the M50 S.B. from the Naas Road, as I expected, and mainline traffic wishing to exit at Ballymount. New bottleneck.
ciarsd wrote: » Yeah, it ain't updated since the start of the month. One of the other posters contacted livedrive on twitter about it. I've also put in a support ticket with SDCC through their website to see what's what, and when it will be back up and running.
paulbok wrote: » I wouldn't be blaming the new flyover for anything until the end of next week. It'll take a few trips for the traffic gets used to the new layout, then whether it's had a negative effect on other roads can be judged. However the positives can be seen already.
Andybobandy wrote: » Perfect time of the year to be opening it, give everyone a few weeks to get used to it, before the Christmas rush, and before the weather gets worse.
ciarsd wrote: » Got a reply today from SDCC. Not much of an update, more of an in progress..:) "Thank you for your query. I have referred same to the Land Use, Planning & Transportation Department for attention and reply to you. Regards,"
Mitch Connor wrote: » Can never understand this. How stupid are people? What is there to get used to - its a straight road. You come off the M50, and drive up the road. You drive down the road, and enter the M50. If you want to go up the belgard road or into clondalkin, go up the side. Its hardly a spaghetti junction!
ciarsd wrote: » Further update just now. "SDCC Customer Contact System Camera image will be available shortly Issue due to device failure on-site has been resolved"