Oasis_Dublin wrote: » If there was a station at Hawkins House, you could be at Supermacs on O'Connell Street in maybe three minutes if you crossed the Rosie Hackett Bridge.
TheBandicoot wrote: » My own crayon plan for the area is to demolish everything between Townsend St and the quay wall, Hawkins St an Tara St, and completely redevelop into a large bus station for all operators(possible even a multi-level design), with direct Luas interchange and dedicated access to the Rosie bridge.
Schadenfreudia wrote: » Wish you luck with that considering the passion two recently built ugly chimneys in the bay are generating!
Oasis_Dublin wrote: » If there was a station at Hawkins House, you could be at Supermacs on O'Connell Street in maybe three minutes if you crossed the Rosie Hackett Bridge. To be honest, I don't care how they do it, they just need to get rid of Hawkins House. Be it rail related, or not!
Muahahaha wrote: » I hope when Hawkins House gets redeveloped there are many sticks of dynamite placed underneath it and thousands of Dubliners can crack open some bubbly and enjoy the show It's has to rank in the top 5 most depressing buildings in the city centre
Muahahaha wrote: » What a nice building, cultural vandalism to tear that down and replace it with Hawkins House. Was year was that torn down, was it Haughey era ?
murphaph wrote: » I'm sure it will. Fairview is well positioned at the centre of the X.
AngryLips wrote: » There's a new depot already built in Drogheda
Cinephille1888 wrote: » Electrification won't stretch that far. I've asked before what turn around at Balbriggan will be like but no one seems to know. Same goes for Maynooth, how do they avoid conflict with Sligo/Longford DMUs? Fairview will likely stay, but the increased stock needs somewhere to sit overnight...
Zebra3 wrote: » There is some work going on in Maymooth atm, not sure if it's related to any of this though.
thomasj wrote: » Local Dublin 15 cllr Roderic o gorman has posted a reply he got from Leo varadkar in relation to dart underground work and the level crossings on the maynooth line
The underground tunnel (formerly known as the interconnector) connecting the Docklands and Inchicore with underground stations in key locations and the €3 billion Metro North were mothballed when the Government decided on priority capital projects in 2011. Neither was completely abandoned and both are subject to feasibility reviews in light of economic conditions by the end of 2015. However, ministerial briefing papers prepared for Mr Donohoe state while work on the projects was ongoing “no new large project, however strong the business case, could proceed unless a funding package outside the normal departmental allocations, and including private sector involvement, was available”.
CatInABox wrote: » Dublin rail projects to rely on private funding Not sure if this is information that is new or not:
D.L.R. wrote: » Given the govt of the day ignored offers to privately fund a Dublin metro, and then built the Luas on the cheap, this may be whats needed. Tons of private capital pouring into Dublin these days, we built our motorway network with private help so why not this. The state clearly can't deliver it.