NRA have this morning advertised for engineering consultancy to design medium to long term solution to the junction!
:):)
vince wrote: » I cant see how you get from m8 coming from dublin into the city centre.
vince wrote: » Thats a long way round but no other solution I suppose. Looks great I wonder when this gets moving.
AugustusMinimus wrote: » I was initially very much against the M8 to Lower Glanmire Road movement. However, in the grand scheme of things, this movement will probably take up less than 10% of the total movements at this junction. The dumbbell which this movement will entail will be perfectly capable of taking the traffic load for this movement even at rush hour I suspect. Considering this is the only mainline movements which will be required to go through the dumbbell, that's not bad at all. In the grand scheme of things though, the Kinsale Roundabout should have had this treatment done also. There was plenty of room out there to do a slip road style setup which would have sorted a lot of problems. As it is, the queue down airport hill can be terrible at rush hour
xabi wrote: » Looks a bit messy coming from the tunnel going to M8.
Chris_5339762 wrote: » They also, I would imagine, want to leave the Lower Glanmire Road for traffic coming from the east, and encourage traffic going down the M8 continue along the South Ring and access via the N27. Edit: My design was still far, far better though.
xabi wrote: » Alan Healy @alanhealy 54m The NRA has begun acquiring the necessary lands from 20 property owners to upgrade the Dunkettle Interchange. Looks a bit messy coming from the tunnel going to M8.
cargo wrote: » Is the fact that you need to go through 2 RA's to get from M8 to City not going to be a huge drawback to those designs? I'm not from the area but I do travel through this junction from time to time and its normally this movement I take. Or am I just overly worrying. Will this detour be fine once all the other traffic is taken off this movement?Will these RA's have slip for left turns at least?
AugustusMinimus wrote: » Anyone like to guess btw when we'll see construction start on this. Would late 2014 be too soon ?
Chris_5339762 wrote: » The more I look at their design, the more that the M8S - N25W (Dublin to Cork) movement is irritating me. A simple third level on the design and they could plop this movement in. Whether they are trying to keep the whole thing to two levels I'm not sure but looking at it, there is plenty of room. It really is beginning to seem to me to be a very stupid idea.
csd wrote: » I'm guessing that they want to send city-bound traffic via the South Link rather than the existing route via the Glanmire Road. It's the only plausible explanation I can think of. /csd
AugustusMinimus wrote: » IMO, they clearly do not want traffic entering into the city via the South Link. Would cause excessive traffic at both the Kinsale Roundabout and the end of the South Link Road at Eglington Street. As others have said, an extra grade separation may have increased costs dramatically. The way I view the junction is that there are 12 main movements and a number of other movements in regards to Little Island and Glounthaune. Of the 12 main movements, 11 will freeflow. So 1/12 main movements will have to go through both roundabouts. In addition, another 1/12 may use the roundabouts to access Little Island and Glounthaune. All in all, I would think about 10% of the traffic will be using those roundabouts. Even at peak traffic, I doubt there will be more than 3 or 4 cars queueing at each one.
niloc1951 wrote: » If a the commuter populations develop further in the Watergrasshill/Rathcormac/Fermoy area and the two roundabouts do cause issues during morning peak time then the residents of Sallybrook and Glanmire better get ready deal with their villages becoming part of a 'rat-run'
phatmanwc wrote: » the M8-Lower Glanmire Road movement will have priority over these movements on both roundabouts, and shouldn't be affected by them.
mydiscworld wrote: » I'm guess the NRA have been, or soon will be, allocated the money to finalise these CPOs they began last month. Upon completition of that stage, has the money been allocated to commence construction, or is that a whole other issue?
spacetweek wrote: » There's no money allocated to this yet, and no announcement of how this will happen. Due to cost, this might need to be a PPP.