kerry4sam wrote: » Hope everyone is doing okay though & the work-load isn't too heavy-going?!
AntiRip wrote: » TBH I find it crazy. Semesterisation has major downsides. In the next 4 weeks we have 3 CAs in databases, SAD, Network Fundamentals, Java project, MM project and SAD project and at the same time keep up with all the theory. Am surprised how cool everyone is in class, maybe they don't realise :-). The 6pm finishes makes it 10 times worse as I have no time in the evening with kids etc. and shattered at night to do anything. The younger ones can stay up till the wee hours of the night. Other than that it's great! :-)
siblers wrote: » Im youngish but im either wrecked by the time I get home or I have footie training etc. Need to have something to keep my mind off the course. I just try get as much done as possible while in college. Hopefully we'll get the DB assigment tomorrow and can try get it done over the weekend. Multimedia shouldn't be too bad though, should be able to get a good bit done while in class.
JFlah wrote: » Slightly more than youngish we seem to be making no headway just getting more and more to do !! the exams will be good craic ---- ZERO time to study!
siblers wrote: » Wonder how many we'll have after christmas, if its more than 2 its gonna be crappy christmas. Studying christmas day i'd say
JFlah wrote: » Good idea that ... waste no day )
AntiRip wrote: » Take an hour off for dinner anyway sure, but no more than that. No drink either
JFlah wrote: » ah no need for an hour I'll knock dinner back in 15 minutes!!!!
AntiRip wrote: » haha In all seriousness though, I'll be taking 2-3 days off for definite. Xmas day for sure & maybe St.Stephens Day. Those couple days downtime as important as study. All work and no play....and all that
JFlah wrote: » ah yeah at least that hopefully more , it'd be great if DB and SAD exams were split up 1 before 1 after
siblers wrote: » Id like to have Java and DB done before christmas, SAD is slightly easier and NF shouldn't be too bad.
siblers wrote: » For SAD do we just need screenshots from Visual Studio? I had a couple taken but I fecked up when saving my file. Don't wanna waste time re-doing them.
siblers wrote: » Yeah, save mine to desktop and then transferred to X Drive but Visual Studio wasn't having any of it. Easy enough to make the sample screens though
siblers wrote: » God I hate Visual Studio, anytime I open an existing project I fully expect it to throw up about a 100 errors. Spent 5 hours on it today doing the buttons etc and closed it and re-opened it and the stupid thing wouldnt open. Eventually got it to work after a pretty horrendous few minutes
siblers wrote: » Have you much code done for it? I can navigate around the various screens and I have a clear function that clears fields, but I couldn't figure out how trying to remove something from the system. The DVDSYS code didn't make much sense.
siblers wrote: » So happy to have the java done with, found it tough aul going. Finishing line getting ever closer.