Irish and Proud wrote: » #1 - Doesn't look as if the Dunkettle Interchange Project is canned - the M7 Upgrade from J9 (Maudlins) to J11 (M9 Split) doesn't look so either according to this! However, they may still be only advancing to the end of their planning stages. Regards!
Irish and Proud wrote: » 06/07/2011 - Prequal: R402 11km Road Improvement (Enfield to Edenderry - Kildare CC)
MYOB wrote: » From your very opening post here - this has been funded with 26m for 2012, think its not started yet. Its a massive scheme for a council to be doing these days.
charlemont wrote: » Hope these can go here, Not a link to a tender as such.. N52..North Tipp. MINISTER KELLY ANNOUNCES FUNDING FOR ROAD SCHEME Posted by paddy On January - 13 - 2012 Local Minister Alan Kelly has announced that the long awaited Congar/Ballyluskey re-alignment is to take place in 2012. The 2.2 kilometre stretch of road is listed in the 2012 Minor Works Scheme plan. <snip>http://img33.imageshack.us/img33/9285/r662b.jpg
Irish and Proud wrote: » Tuesday 24th January 2012 - 1 Notice: 1) Tender: N13/N15 McClays Corner Traffic Signal System Works 2011 (Donegal CC). Regards!P.S. I didn't see any notices for Monday.
spacetweek wrote: » That can't be right - it says 2.2 km scheme length (for the N52 scheme in Tipperary), but in the image it's only a tiny deviation?
Irish and Proud wrote: » #2 - More info on this here - will eventually from part of the Limerick Northern Distributer Road (LNDR). There's also a PDF Document (774KB) showing the Preferred Route for the LNDR Phase 2.
spacetweek wrote: » Is there a start date for Phase I, granted p.p. back in September?
Irish and Proud wrote: » 3) Award (30/01/2012): Bothar na dTreabh (N6) MMCI Scheme Phase 3 (Font & Morris) (Galway City Council).
Sponge Bob wrote: » CHRIST
Sponge Bob wrote: » 2 of them ( Corrib Park and Sandyvale) haven't even been tendered out yet.