Furet wrote: » Hi there. That question is for a different forum really (Commuting & Transport). This thread is about Terminal 2, not Ryanair.
myhead wrote: » Cmon forget about the shiney architecture and worry that it will be empty unless we can tempt a major airline to use dublin as a hub. Its madness with a decrease in passengers using dublin airport to build this. The decrease is not helped by the government and airport duties, and yes (Ryanair) boss Michael o Leary is 100% right in this matter. We shall pay for it in the end!
runway16 wrote: » The same mentality that had a 2 lane M50 - And it is Ryanair that is actually responsible for much of the drop by cutting capacity in the 1st place. The current terminal is still at capacity. The airport is still constrained at many times in terms of stand availability. Most of it is old and past it - it badly needed new development, at teh very least to take pressure off much of the old building so it can be torn down (which Pier A and B badly need). The US flights are using terrible immigration facilities that are not fit for purpose. There isnt enough passport control capacity in Pier B and you cant move it anywhere else because that is already full. Only in Ireland would people actually argue against having capacity to grow. And it will grow again... believe it or not. O'leary is a ****wit who only skews everything to favour his companies needs at that specific moment in time. For years he banged on about "calcutta" type facilities... remember?
myhead wrote: » its cart before the horse as usual in this country.
myhead wrote: » Your simply not understanding, lets be realistic unless we have the people to fill your building its pointless. its cart before the horse as usual in this country. building before planning. lets see how it pans out, I wish it to work out but im not holding my breath.:rolleyes:
ilovegermany wrote: » The new terminal offers the capacity for a phased refurbishment of the old terminal and closure of the truly embarrassing bits (Basement check in at Area 14 and better spacing of stands). At the moment Ireland needs a terminal and a half, in ten/fifteen years we'll need 2 fully operating terminals. We have a total peasant mentality in this country when it comes to infrastructure.
darkman2 wrote: » http://www.dublinairportauthority.com/TDA/FAQs/introt2.html A "tour" of the terminal.
runway16 wrote: » With all due respect, I work in a senior position in the airlines at Dublin airport and I can tell you for fact that the current terminal is already over capacity and has been for a very long time. There just is not enough space at Dublin airport for a variety of functions essential to the proper running of the airport. There arent enough aircraft parking stands There arent enough Passport control facilities. The Baggage system is below spec and is stretched. The US immigration facility gets DANGEROUSLY overcrowded. The Boarding gates at Pier A and B were designed for smaller aircraft and lower loads and are not big enough for the throughput being experienced. Pier A is not fulfilling current security regulations and is only being allowed to operate with derogation because there isnt enough room anywhere else. Facilities for staff are awful, there is not enough room for ramp equipment because of squeezing everything into too small a space. I could go on and on.... All of a sudden it has become fashionable to slam everything built for the future in this country on the grounds of being a waste. The same people were usually the ones complaining when we under specified infrastructure in the past. Airports have to be build ahead of demand because of the long lead in times otherwise you get years of the sort of congestion we once had at the airport. If a fire had broken out in that building in the height of summer, a lot of people would have died due to the crushing levels of congestion. Forget O'leary. He has an agenda to frustrate Aer Lingus's Growth plans and make as much trouble for the government because he hasnt got his way. T1 would burst at 30 million pax. It was bursting at 22 million for god sake. Dublin added an extra 4 million pax in one year in 2007. The need is there, but of course the bog mentality that just loves to complain about everything knows better....
JupiterKid wrote: » Well said. I completely agree. T2 is very much needed and it is needed now. The only quibble I have about T2 was the fact that Pier C - itself only built in 1999/2000 - was demolished to make way for T2. That was atrocious planning and a huge waste of money.
myhead wrote: Your simply not understanding, lets be realistic unless we have the people to fill your building its pointless. its cart before the horse as usual in this country. building before planning.
runway16 wrote: » I agree with you about Pier C, but I think it was Pier C that was the mistake and not T2. When Pier C was built, it was built to the wrong design (it should have been sited where Pier E is being built), it was too narrow, and it needed its own check in / arrivals facilities. T2's location really corrects what went wrong when Pier C was built.
eia340600 wrote: » From the off, I've been sceptical about passenger flows in the new terminal.This "tour" only heightens my fears. For starters, departing passengers have to rise 2 floors after check in for security and shopping, only to have to descend 2 floors again to get to the gates.OR (USA bound passengers) descend 3 floors and rise another. This is done so that arriving passengers only have one level change. In the current terminal departing passengers have NO level changes and arriving passengers have one(after getting off the plane). Not only do passengers have to change floors time and time again, but departing and arriving passengers actually intersect on the 1st floor of the terminal!!Never have I seen this happen outside of tiny regional airports.By the looks of things, departing passengers will have to walk through the ever present crowds of waiting plebs to get to security. This layout is there because of the "bridge" over the T1 road.However, the roads were re-arranged to suit the new terminal, not the other way round.Therefore the bridge was unnecessary, and a more traditional and more effective terminal could have been designed. Even if the bridge had to be there, a more flow friendly layout could have been adopted, with arrivals on the ground floor, check-in on the first and security on the 2nd, with the pier layout changed respectively. Or arrivals on the top with check-in and security below. In other words there were a million different possibilities that could have been used to design a more user friendly Terminal.I am dubious about T2 in that respect. I hope I'm wrong, but I think T2 will be an incredibly annoying place to pass through..But I guess I'll have to wait and see...
MYOB wrote: » Ah now, Schiphol is not a model anywhere should aspire to...
irishdub14 wrote: » New Article on T2:http://www.independent.ie/national-news/inside-the-controversial-terminal-2-as-it-gets-ready-for-takeoff-2267945.html?start=2
Plowman wrote: » This post has been deleted.
murpho999 wrote: » Really don't see what the problem is with changing levels, up and down an escalator a couple of times what is the problem? Your point about intersecting Departing and Arriving passengers is wrong. This happens in major international airports quite often, Schiphol being a perfect example. Don't see the problem with it. Departing people are heading for their gates and arrivees are heading for baggage/passport control. Do not see how it will cause a problem.