Sponge Bob wrote: » since dedeisgnated
Hogzy wrote: » redesignated?
Carawaystick wrote: » nope. the N80 from Tullamore to Clara is downgraded from national secondary to RsomeThingOrOther
Mc Love wrote: » Access to the M20 road could be restored...but in all honesty I cant see it happening:http://www.limerickleader.ie/news/Access-to-N20-road-could.6400548.jp
KerranJast wrote: » Buttevant is barely above a village. Talk of them expanding is crazy.
Hogzy wrote: » WHat are they giving out about. Id say all in all about 10 cars a day from Buttevant would use the slip road. The statment some people make with no facts... sad! All they have to do is travel 10km in either direction for Cork or Limerick. Jesus some people in this country and their sense of entitlement :rolleyes: and LOL @ Lisa Fitzgerald who thinks that because there is no slip road people wont stop for food in The Welcome Inn. Surely if the journey time is cut to 1hr-45mins people wont be stopping for food anywhere.
CerebralCortex wrote: » Yes if people want a large town or city they should move to one.
corktina wrote: » not so many years ago the residents of Buttevant got up a petition AGAINST a bypass.... they will have link roads to the M20...its called the N20 at the moment.
Edthehead wrote: » the NRA has stated that the stretch of road north and south of Buttevant is not fit for what it is used for, too dangerous for most road users but grand for the people of Buttevant, is this the high quality connection they are proposing?
The existing N20 will be downgraded once the M20 opens, that means the council won’t be salting it on frosty mornings, if anyone remembers during the 80’s what Ballybeg was like to drive through on frosty mornings, you can imagine what the accident rate is going to be then. Oh I forgot it won’t matter because it will only be Buttevant people dying.
Now that all that money has been invested the NRA want waste all that investment by not providing the town with a connection. What are the chances of getting any company to set up in newly zoned areas if the have to drive 10km of (in the NRA’s words) dangerous roads.
KerranJast wrote: » There are already 3 large towns within spitting distance of Buttevant which would take any increase in population in that side of the county.
Edthehead wrote: » Again wrong! it was a few traders that objected the residents were all for it.
So your saying some towns should be allowed to develop at the expense of others.
if Buttevant wants to develop and expand it should be allowed to
corktina wrote: » didnt see a petition in favour of it from anyone..... and the traders were no doubt residents too were they not?
"They should toll the shaggin yoke on the 20km central section" "And it would be good for Buttevant as truckers would avoid the toll and provide trade for their shops etc."
"Local and regional planning and zoning decisions are taken by the local authority and by national Govt. Not by a few shopowners in every town in the country."
Edthehead wrote: » In response to some of your replies regarding Buttevant. If one looks at a map of all the junctions on the Cork to Limerick stretch of the proposed M20 (average 7 to 10km) there is one large 18km gap between Mallow and Charleville, now even if there was no town half way between these two junctions that’s a long stretch between junctions (in the UK the longest distance they have between two junctions is 18 miles, they have placed a services half way between these junctions and put up signs warning motorists of the large distance before the next junction) if someone takes the wrong slip road in Mallow and heads north instead of south they will have to travel 38km before they get back to Mallow.
Edthehead wrote: » Common sense tells you a junction should have been planned for Buttevant bearing in mind this junction would also serve Donerail, Churchtown and Liscarroll, the population of these areas including their parishes would be somewhere in the region of 6 to 8 thousand people. The NRA in their wisdom done a traffic count when the streets of Buttevant were dug up for the new sewerage system they apparently came back when the roads were filled back in and done another, how accurate could that have been?
Edthehead wrote: » Buttevant have been promised by the NRA a high quality connection to the M20, the road north of Buttevant has a higher than the national average rate of accidents and fatalities, the road south of Buttevant has twice the national average of accidents, the NRA has stated that the stretch of road north and south of Buttevant is not fit for what it is used for, too dangerous for most road users but grand for the people of Buttevant, is this the high quality connection they are proposing?
Edthehead wrote: » The existing N20 will be downgraded once the M20 opens, that means the council won’t be salting it on frosty mornings, if anyone remembers during the 80’s what Ballybeg was like to drive through on frosty mornings, you can imagine what the accident rate is going to be then. Oh I forgot it won’t matter because it will only be Buttevant people dying.
Edthehead wrote: » This is all about money, the NRA can save themselves 5 million by not putting a junction at Buttevant, the road will pass within one mile of the town, and to me that makes no sense.
Edthehead wrote: » Buttevants population has declined between the late 90’s and 2009 when other towns were expanding it was nearly impossible to get planning for any housing on commercial project due to the inadequate water and sewerage systems in the town. In recent years a lot of land has been rezoned commercial, industrial and housing on the strength of the new systems being installed. These systems are now complete, Buttevant missed out on growth during the Celtic tiger years due to the Council dragging their heels and not upgrading the water and sewerage systems. Now that all that money has been invested the NRA want waste all that investment by not providing the town with a connection. What are the chances of getting any company to set up in newly zoned areas if the have to drive 10km of (in the NRA’s words) dangerous roads.
Edthehead wrote: » The Cork County Council recognised Buttevants potential for growth (64% over the next 10 years) and put the services in place for it, and the NRA ignored all of that and decided to save 5 million. To me this is typical Ireland, its the Gas company digging up the road putting down pipes and re-tarring the road, and two months later the ESB come along and dig it up again to put down cables. You could argue they are two different companies, but the NRA and the County Councils work for the state, no wonder the country is the way it is.
Furet wrote: » How do we know that the price of a junction is 5 million out of curiosity? .
invinciblePRSTV wrote: » I don't think it's justification to build a junction on the basis of people taking wrong turns or because of long distances between junctions, especially when the distance isn't really all that great..
invinciblePRSTV wrote: » I think the NRA will have done many traffic counts, amongst other data collection methods, when doing traffic assessments for the area. Your insinuation that somehow the NRA don't have the correct traffic counts for the town are well wide of the mark i'd wager...
invinciblePRSTV wrote: » Accidents happen because of the large volumes on the existing N20, as mentioned this traffic will be removed when the M20 is built...
invinciblePRSTV wrote: » Cork County Council grit R roads around county towns also...
invinciblePRSTV wrote: » It's not all about money, it's about connecting the 3 urban area's of Cork, Galway & Limerick. It makes no sense to be plopping expensive junctions along the M20 for every small town or village...
invinciblePRSTV wrote: » That 64% figure is an aspirational one, probably made in celtic tiger times and has little meaning in these times. Besides your Buttevant exclusive focus misses out on one key point: The M20 is not about Buttevant, the town needs to accept that the project isn't there to deliver an economic boost to the town. You have to realise the M20s raison d'être isn't to provide an economic stimulus to Buttevant, but to decrease journey times between Cork & Limerick/Galway.
Edthehead wrote: » How does this multi quote thing work??
Furet wrote: » Ed, it is the third button over after the "edit" and "quote" buttons. It looks like a square blue button with a white page and two black quotation marks and a little plus sign on it. You simply click that button on all of the posts you'd like to quote from, and then hit the reply button when you're done.
Bards wrote: » A few qutoes from today's Irish Examinerhttp://www.examiner.ie/ireland/nra-hopes-to-build-m20-over-two-phases-124467.html "THE National Roads Authority hopes to build the 80km motorway linking Limerick with Cork over two phases at an estimated cost of €800 million." "So the best case scenario for the NRA is that the full Cork-Limerick motorway – which will form part of the 200km Atlantic Corridor – will be open by 2018."