sorrywhat wrote: » Hi Sorry if this has been asked before but I searched a few tramore road threads and couldnt find the answer I was looking for. Is there a suitable footpath from the superquinn roundabout, out the Tramore road to the Ballindud roundabout, for running on?
sorrywhat wrote: » Ive never walked up along there. Is it okay? Its not dodgey or anything?@Kensutz - Can ya get back out onto the road or does it just break out onto the road anyway? Was going to go running out that way tonight.
dayshah wrote: » Its grand during the day. It is a bit isolated though. The bushes totally block the view from the road, so I wouldn't want to go there at night (unless you are a fast runner and can out-run any potential trouble).
Sully wrote: » So its only open a few months and it seems to be breaking up already. I thought I counted around 30 potholes of various sizes and they don't seem to be repaired yet. Will we be seeing another diversion soon?
looksee wrote: » The council men were out this morning filling in the potholes. These are very recent, the last time I was on that road, a few days ago, there were no noticeable potholes. Presumably these are the result of the constant rain recently, it is a temporary surface.
Sully wrote: » Besides, any surface temporary or not should be able to withstand the rain and usage. There is little or no point putting down a surface thats going to break up a few months down the line - is it not supposed to be there at least 6months?
Benimar wrote: » I seem to remember hearing it would be left for 3 months to see how it was going before the final surface was put down. That should be around now, but can't see a final surface being put down anytime soon given how the temporary one is breaking up.
Adyx wrote: » I think they were giving it 6 months to settle so that would indicate towards the end on November before they'll even start on finishing it.
michellie wrote: » Did anyone see the car at the roundabout yesterday morning? It had plowed through the fence and was lying on its side in a dip in the side of the road. Looked bad!
Sully wrote: » He survived as did the passenger without a scratch. He crashed in very bad rain and wind, with the roundabout in complete darkness as the lights were out for the few days.
michellie wrote: » oh thank god, it looked bad!
Cabaal wrote: » By which time we could have snow and the road will go to bits :pac:
michellie wrote: » Ah stop. Were waiting on a footpath for the old tramore road well over a year & we keep getting letters in the door saying its supposed to start "next month...bla bla bla". Still no sign of it. Its so dangerous and there are always people walking on it! Someone is going to be seriously injured or killed before they will start it.
Sully wrote: » There where issues outside of the councils control which cropped up when the main Tramore Road was finished and that road was supposed to begin development. The issues were really no fault of the councils. So while the letter you got did say it would be starting soon, thats what was believed until things changed unexpectedly. The latest is these issues are sorted and the contractor will begin shortly or whenever there free I guess.