mcgeebers wrote: » Unfortunately not. Keep an eye on the Meath Chronicle website. It should have updates
Dermotsull13 wrote: » Looking forward to this opening... will bring a new lease of life to the county hopefully. Can anyone tell me how this new motorway ties in with the M50 or will there still be massive traffic buildups around Blanch?
Enbee wrote: » Ugh! No matter how often I look at it I still can't get over the ugliness of this thing. It is such a hideous, misshapen and ungainly design! Were the final designs based on a model that melted after being left in the window of an engineering firm during a heatwave? It looks like Peter Crouch going in for a diving header.
etchyed wrote: » Motorway junctions are not supposed to be aesthetically pleasing. When are you ever going to see it from above anyway?
Enbee wrote: » I'd argue that the more elegant the design the more pleasant the driving experience. Possibly safer too.
etchyed wrote: » Whatevs
dcr22B wrote: » If you are entering the motorway on any of the exits between the two tolls, will there be toll booths on the slip roads? For example, I will be travelling from Swords to Cavan on Sunday week and I intend joining the M3 north at junction 4, Dunshaughlin.
Enbee wrote: » As other posters have noted there is a correlation between function and form. Traffic movements between M50 South and N3 West aren't going to be too efficient and I suspect that the required drops in speed could have an effect further back.
GeneHunt wrote: » No toll booths on slip roads, just two toll Plazas. However Dunshaughlin isn't at Junction 4!
etchyed wrote: » That has nothing to do with what you posted originally. Some waffle about the junction being ugly. Yeah, it's a tight curve from M50S to N3 West, if that was your point originally why didn't you say so?
MYOB wrote: » You design an elegant junction WITH A SODDING GYM IN THE MIDDLE and we'll see how it works. Bad planning by the councils going back years caused this. Nothing more. No engineering oversights, its about as advanced as you'll get in that space.
MYOB wrote: » Most of the junctions on the M50 which have been/are being upgraded were going to be freeflow from the off bar lack of money. Its improper protection of the land to allow the original plans that the planners are at fault for.
Enbee wrote: » So, do you think it's a good junction layout or not?