Bards wrote: » it would be interesting to see if they increased the spped limit on the ORR to 80 or 100 KM/h what impact it would have on traffic flows from the Ardkeen area to the Western Link, and onwards over the new bridge. At the moment due to the ridiculously slow speed limit it take longer to get to the new bridge from the Ardkeen area than it does to go via Rice Bridge.
Bards wrote: » At the moment due to the ridiculously slow speed limit it take longer to get to the new bridge from the Ardkeen area than it does to go via Rice Bridge.
pjq wrote: » Saw this bridge in France during the summer ;http://www.abelard.org/france/viaduct-de-millau.phphttp://www.leviaducdemillau.com/english/divers/gallerie.html France 2460m long, 280m over river, 7 pylons,highest 343m, Cost €400-m, complete 2004 Ireland 465m long, 14m over the river, 1 pylon,highest 118m,Cost €500-m, complete 2009 Millau carried 4,670,449 vehicles in 2008, costs €5.60 for a car in low season and is the highest road bridge in the world. pjq PS our cost is higher because of the 23km of bypass road? otherwise the french would have all the biggest highest etc. records
Guramoogah wrote: » This Waterford city bypass is a sick and dangerous joke. Driving from Fenor to the city and joining the Cork Road (N25) at the Butlerstown cross this morning, the volume of traffic from the Kilmeaden direction is as bad now as it was a year ago. The only way to get onto the road is take a chance - point the car and stomp on the accellerator and pray to Jesus that someone will brake to let you join. The motorists approaching Waterford from the Cork side are simply NOT USING THE BYPASS.
Guramoogah wrote: » Workmates here in the Waterford industrial estate tell me that the main reason they don't use the city bypass is because of the roundabout at the Cork Road/Outer Ring Road junction. If they join the bypass before Kilmeaden and try to get on to the Cork Road be coming up by B&Q, they have to give right-of-way to the traffic that's coming directly from Kilmeaden. Therefore, they gain advantage at rush hour by not using the bypass.
mike65 wrote: » So its not the bypass thats dangerous, its the whatever tha old road is now called (whats its designation?) still being as bad as ever. Can't wait for the first traffic survey, if the anecdotal evidence is to be belived its empty.
The tower crane which serviced the construction of the pylon could also be deemed a star performer. It stood at a hook height of 128m, connected at 80m via triple steel ties to the pylon. Analysis of the complex structural arrangement of the tied crane under an array of loading conditions is unlikely to appear in a standard textbook. The crane operator faced the daunting task of climbing the 437 ladder steps to his cabin, which took about 40 minutes.
brandon_flowers wrote: » Maybe Waterford was crying out for a bypass but it seems to me to be serious over-kill. I was the only car at the toll both at lunch time heading east or west. It might just be sheer luck that it was empty but I very much doubt it.
Sully wrote: » I see they have still not removed the black from the "Welcome to Waterford" sign as you come into Waterford towards the old bridge (for the life of me, I have forgotten that areas name). .
I use the bypass mostly during the night - oddly, they close the baskets so you must give the money to the attendants. Always quiet. But, I have seen heavy traffic on the road towards New Ross so I assume people are just dodging paying
brandon_flowers wrote: » Ok I haven't read all the posts on this thread and only travelled the road today fpr the first time but I have honestly never seen a more deserted road at half 8 in the morning and again at half 1 today. Maybe Waterford was crying out for a bypass but it seems to me to be serious over-kill. I was the only car at the toll both at lunch time heading east or west. It might just be sheer luck that it was empty but I very much doubt it. The bridge is impressive in fairness but again it seems like its an over-designed expensive piece of architecture.
Carawaystick wrote: » Meant to post this a while ago, regarding the rice bridge being closed to traffic for the duration of the tall ships in waterford. was listening to radio1 and the head of the tallships organisation remarked that the rice bridge would be closed to traffic so pedestrians could easily cross it to see the ships on both sides of the quays in Waterford. There was no mention of a waiver on the toll and the alternative route is up to Fiddown and back, which is a looong detour. Has anyone in Waterford/Kilkenny heard about this? seems to be on shakey ground if pushbikes and other traffic not allowed across the N25 bridge are inconvenienced so much.
Bards wrote: » Waterford Bypass will bne Toll Free for the duration of the Tall Ships
Carawaystick wrote: » grand, the lad on the radio didn't mention anything about the toll being waived, and he was supposed to be running the thing...