cherrypicker55 wrote: For a dual carriageway to allow its 70mph limit, it must meet various criteria, suprised as an adavanced motorist you never knew this.
cherrypicker555 wrote: » No most dual carriageways have a 60mph or 40mph limit, because they have roundabouts, traffic lights, lanes not wide enoough to have a 70 mph limit and many other factors. .
Stark wrote: » 70mph is the default limit on a UK dual carriageway. 60mph is a special speed limit that they impose in areas like you mention. Just like most Irish national routes will have a 100km/hr limit by default and special speed limits where there are roundabouts, built-up areas, traffic signals, roadworks etc. If you read the UK highway code, it will say that dual carriageways are 70mph unless otherwise specified.
Deleted User wrote: » You obviously don't drive on many UK rural dual carriageways then... Even with roundabouts they are still NSL, you're referring to suburban dual carriageways.
cherrypicker555 wrote: » No most dual carriageways have a 60mph or 40mph limit, because they have roundabouts, traffic lights, lanes not wide enoough to have a 70 mph limit and many other factors. For a dual carriageway to allow its 70mph limit, it must meet various criteria inc a hard shoulder, suprised as an adavanced motorist you never knew this.
cherrypicker555 wrote: » I drive in the republic all the time and see the carnage and poor planning.
cherrypicker555 wrote: » Dual carriageways with roundabouts have a restricted limit.
Stupido wrote: » It will be as the rest of the N6 is being redesignated. Would be stupid to have a small stretch of DC in the middle of the route. I think it needs an upgrade though, at least a resurface. There is talk of a second bypass of athlone, possibly south of the town, which would take the local traffic, thus allowing the existing bypass to be motorway.
cherrypicker555 wrote: » 70 is the max NSL on Dual carriageways, 60 is the normal limit. although it varies depending on the strech of dual carriageway, in urban areas it can be 40, its mostly 60. Dual carriageways with roundabouts have a 60mph limit.
cherrypicker555 wrote: » Obviously dual carriageways in urban areas have bus stops, no hard shoulder etc.
Quite frankly, there's little difference between the standard of most motorways in Scotland and Ireland.
cherrypicker555 wrote: » ...apart from less wire barriers, better lighting, service stations, wider lanes, bigger signage,rumble strips, etc, etc, etc.
Steviemak wrote: » I think now is the time to resurface before it has a motorway at either end.
Deleted User wrote: » I believe that upgrading the Athlone bypass is included as part of the N/M6 Athlone Ballinasloe project.
KevR wrote: » What sort of upgrade work will they carry out on it do you know?
clon wrote: » Looks like all the designations will be approved as the nra have tendered for line and stud replacements on all the daul carriageways that are affected by the motorway re-designations.When you add up all the existing dual carriageway distances it exactly adds to what needs to be currently changed on all routes under review.http://www.nra.ie/TendersRecruitment/TenderNotices/
childoforpheus wrote: » Am I seeing this right, is the N17/N18 Gort to Tuam scheme gone to tender?http://www.e-tenders.gov.ie/search/show/search_view.aspx?ID=JAN113131
marmurr1916 wrote: » Nice! It means an extra 112.7 km of motorway (39.9 km on the N2, N4, N6 and N8, 36.8 km on the N7, N18 and N20, 36 km on the N11) added to the network.
mysterious wrote: » So they are bluifying the N18 and N17 yet have a standard DC at ennis with compact GSJs..
mysterious wrote: » So they are bluifying the N18 and N17 yet have a standard DC at ennis with compact GSJs.. Why does there have to be such lunacy all the time in matters such as this, that doesnt need to be created at all. Why couldnt they have just built proper slips at the Ennis bypass. I just don't get it. The Ennis bypass has traffic levels 15,000 a day more than most of the inter urbans. Why didnt the Ennis bypass get a HQDC status
MYOB wrote: » There are (some) compact GSJs remaining on the UK motorway network and they were the original design standard there for parts of the M5 and M6 - once the merge slip on the mainline is long enough they're grand - assuming drivers know how to use them!
Furet wrote: » This is indeed good news, but let's not forget how coy the DoT is being about the whole thing. Still, tenders for the delineation and studding must be in by 5 March...
Also, there was no mention of sign replacement on any of those tender notices. Does the NRA have a long-standing contract with Rennicks already?
D.L.R wrote: But its good that these slightly inferior roads qualify. Smaller junctions shouldn't automatically mean all-purpose road. Bottom line, Ennis BP is still a great road worthy of an M.