wheres me jumpa wrote: I actually heard the Carlow bypass would be open before Xmas! My sources are clearly very unreliable!
Oilrig wrote: Don1, bad news, it by-passes Carlow but not Castledermot...
racso1975 wrote: » umm i also heard that the section from outside carlow town to that point at tinryland gaa club would be open by x mas!!! @ wheresmejumpa i wonder do we have the same useless source of info
sk8board wrote: » At the south side of the town, the junction where the by-pass will rejoin the road to Kilkenny (junction 6) is not remotely finished. Theres not a hint of an exit being constructed, and the general flow of traffic has never been obstructed. I can't see it being open for christmas, although i've heard the same rumour. That said, as you pass the entrance to the landfill you can see the new road very much exists, so not long now.........
Don1 wrote: » no idea. Just looking forward to not having any reason to go through Castledermot any more tbh!
lucylu wrote: » I read it in the Nationalist yesterday that it will be open end Nov early dec
lucylu wrote: » http://www.carlow-nationalist.ie/community/pdf/Clonegal,%20Kildavin,%20Castledermot.pdf In Castledermot Notes - under bypass
Mordeth wrote: » There's sign posts up and everything.
Mordeth wrote: » green
fricatus wrote: » Thanks Mordeth! So it will be a dual carriageway with 100 km/h speed limits, rather than a motorway with 120 km/h limits. Either way though, it will make the Dublin-Waterford journey a lot easier, especially at peak times. It will be good for Carlow too... make it even nicer than it already is! Still though, I got to like Carlow on the way through when I was living in Dublin... stopping at the Statoil on the Dublin road on the way in, for an ice cream... the odd Abrakebabra stop when hungry... checking out the students between the Hanover bridge and CW IT... Won't miss the queues starting out at Lapple heading south on a Friday evening though!
fricatus wrote: » I read in the Times today (sorry no link), that the bypass is being held up because some developer is not getting a right-of-way? Sorry now, because I'm sure I have that ar$eways... can anyone fill us in on what's actually happening?
fitzyshea wrote: » Wher ein the Time swas that? I didnt see it. Was it about the carlow Bypass or the N9 motorway as a whole. As far as I am aware the road is on schedule for next year and it looks like it too.
fitzyshea wrote: » ...Carlow County Council ... insistence that an unsafe access be provided to a landowner...
patrickc2006 wrote: » i tell ya carlow with bypasses, inner relief roads what will be next?
fitzyshea wrote: » Just an update on my last post. I think this road refers to the inner relief road not the bypass. As Mcloughlans (Dinn Ri) Are building that not the bypass. It was in the Nationalist again this week.