We have a solar PV setup with hybrid inverter.
Wanting to add battery capacity and an off grid switch, we contact our contractor. Upon technical visit, new safeelectric guide lines for an off grid backup system are mentioned: these would only allow to connect '2 circuits' to the inverter. This would be to prevent the inverter, and the connection to it, to be overloaded.
I couldn't find these guidelines online, and have written Safe Electric to ask if they have been published. No response so far.
Our recently deep renovated house has 9 socket circuits and 5 light circuits. Having to choose 2 wouldn't work for us.
This 2 circuit guidance seems based on adding fuse capacity, rather than real life usage. Hard to use the full fuse capacity with current day domestic LED lighting in a single room …
I asked our contractor if it wouldn't be possible to protect the inverter connection with an extra 25 amp fuse, and also raised the possibility of a smart load control panel. The answer is: "due to the regulations set by Safe Electric Ireland there is nothing we can do"
This seems absurd in 2026?