Crawled at snails pace on an off peak drogheda- connolly service this week from howth jct to Connolly section.
4 track along with signalling improvements is in a pipeline.
The doubling of track would mean hundreds of houses, apts along with stations, bridges, roads being demolished. Cost would be huge. Just wondering how realistic the project is.
10 min dart frequency from drogheda without passing loops is going to make enterprise trains be in the same snails pace position.