Hi all. hoping someone here can help.
I got solar installed in March. I had my tails upgraded to 25sq and my CU replaced as part of the work. For export, I needed a smart meter. The existing fuse in the meter box was a 60/80A. I asked ESBN for a smart meter and also asked if it was possible to connect the tails and upgrade to a 100A fuse on the same visit to save everyone time and hassle. It was an ordeal getting everything done, but suffice to say the ESB messed up the appointment time and I couldn't be there. My OH had to leave work early to accommodate access, as my meter is inside the hallway.
Anyway, I left a note in the meter box with the 3 jobs to be done. Tails connected, Smart Meter installed, 100A fuse upgrade. The technician said the fuse upgrade wasn't on the job list and that I could only have an 80A fuse. He said a 100A wouldn't fit. I was under the impression that the fuses were physically the same size, or am I wrong?
I have emailed ESBN about this, asking for the work to be completed. The entire reason for getting the tails upgraded and mostly why I upgraded the CU, was to allow for a fuse upgrade. Here is a pic of my meter cabinet below. Is there something I am missing? The only thing I can think of is the cut out fuse on the right, which I think is 80A. Maybe that needs to be changed to 100A before the main fuse can be done? Any help on this appreciated.