Probably use a third party app to add to wallet
In 2030.
Yes I did wonder- could not save the ticket to the wallet at all
They have mentioned support for mobile wallets will be coming, but there's been no mention as to when that will happen
Yeah, I tried using them last week, weren’t working and the staff were just waving people through without looking at them.
Also if you are travelling as a family with multiple tickets, the ordering of the tickets in the PDF is terrible. Say you have three persons return tickets, it is ordered as first passengers ticket in both directions, out and return, second passengers tickets out and return, etc.
But that doesn’t really make any sense if you are trying to scan your kids through the gates, you have to scroll all around the pdf looking for the relevant ticket to scan, a big pain.
It is also a pain to show the relevant ticket to the ticket checkers on the train, when he saw I had one of these tickets, he just asked if we were all together and said it was fine without looking.
The tickets should really be grouped together by legs of the journey. As in the first 3 pages should be outbound tickets, followed by 3 pages of the return tickets, etc.
Also I’d much prefer if hey supported tickets in Apple/Google Wallet, much easier to use, they work well at Dublin Airport.
I see the new ticketing system is working swimmingly…not. Both at entry and exit to Heuston the E ticket wouldn’t scan. Show it to staff- slowing everything down in the process. Asked second guy on gates are any of the readers working for E tickets answered wryly “one or two of them work”.
Small dusting of snow and whole operation falls apart.
Some disruption is expected but this is really poor from them.
First new ICR carriages entered service this morning.
Luas has nothing to do with Metrolink, Metro will be fully automated, fully grade separated and large sections of underground. High frequency is very achievable and very much a feature of these type of systems.
It does during the morning peak between Sandyford and Parnell on the Green Line.
None of this has anything to do with Irish Rail infrastructure in any case.
I don't think it achieves that during peak. Fact is, the luas is often packed, it has the ability to add additional capacity yet that capacity is not forthcoming.
And, unlike Luas, Metrolink won't be sharing space with motor traffic and pedestrians.
It was never suggested that it would operate at 3 minute headways outside of peak times.
Let's not forget that the Luas was promised as being operational at 3 minute headways but, despite being at capacity most of the day, it's still operating with gaps of up to 10 minutes for a large chunk of the day/week.
plenty of capacity at first perhapse.
going forward i'm not quite so convinced due to it's definite success and growth going forward.
as i said it's water under the bridge now as it's what we are getting but i can hear complaints along the lines of the luas overcrowding issues.
The Thameslink core is under a completely automated signalling system where drivers just open/close doors and do not drive the trains.
Hardly comparable with the rest of the network which has completely different signalling.
Metrolink is being designed to a 90 second frequency. It is in the design docs.
Now it likely won't open to that frequency, most likely 3 minutes, but it is being specced for that.
DART absolutely can't do that frequency, it can only be done with fully automated systems. Which is why Metrolink is being designed for fully automation, like Copenhagen.
DART could maybe do 5 minutes, perhaps at a stretch even 3 minutes (but not on a branch line obviously). At 5 minutes, Metrolink would still have 1.2 times the capacity, at 3 minutes frequency, yes DART would beat it with 20% more capacity.
However the cost of doing that would be a lot more then using Metro, much bigger stations for 180 meter DART's , etc.
This is why these sort of fully automated Metro systems have become so popular for new builds in mid sized European cities. They give you relatively very high capacity at a lower cost then with a traditional heavy rail system. Yes, heavy rail can potentially beat the capacity, but at much higher cost and arguably mid sized European cities don't need quiet that high capacity. The likes of London, Paris, etc. of course need it, but not the likes of Dublin, Copenhagen, etc.
Maybe, but ThamesLink manages 24 tph in the core sections at peak times, which is every 150 seconds...
90 second frequency is implausible on heavy rail
Its even more implausible on a spur.
But do we think it will be a 90 second frequency.
Given the same frequency, the DART would have more capacity.
65 meter Metro at 90 second frequency is 2.4 times more capacity of a DART every 10 minutes. It will be plenty of capacity.
Yes I agree, at least as far as Roads and Transport Infrastructure Ireland are concerned. However TII has responsibility for just Road and Luas (and there is nothing actually underway i.e. approved and ready for contract, as far as LUAS is concerned. That leaves Haevy Rail and Metrolink. The former seems to be subject to the NTA, and the latter seems to be fairly stand alone, but with general policy approval from the NTA. Of course the Dept of Public Expenditure has to approve of almost every significant project.
If I have this reasonably correct, it as a bit of a dog's dinner. If TII have the skillset for large complex road projects (like Dunkettle) then they could build on this and do project management for Metrolink, and heavy rail. While TII has a lot of civil engineering expertise, for rail projects they would need to acquire skills on the electrification side of things.
What skills do the NTA have?
and for that, i'm going to call it, we will get something that is under capacity quite quickly.
never mind though, at the moment it's happening so it's water under the bridge now.
We have a long history of delivering transport projects on time and on budget. There is no reason to equate any transport project with the NCH shít show.
With due respect, you cannot possibly know that.
There is significant EU funding going into a study to examine the feasibility of capacity expansion on the Northern Line.
Posting throwaway comments such as the last one above is just daft to be honest - you cannot possibly come to any conclusion before we see the options that might be available, and any potential EU contributions that might be available as well.
Are you saying that an extra 2 tracks for about 10km on the Northern line (even with land acquisition and housing replacement costs) will cost more than a much longer partly underground Metrolink, with some very complicated underground stations? Metrolink's estimated costs are in the region of €10billion, and I would take that with the same level of credibility as applies to the cost estimates for the children's hospital.
extra tracking for the northern line is unavoidable, airport spur or no airport spur.
how and where and how much will have to be worked out but done it is going to have to be.
Nobody is arguing about the 2.2km of rail to the airport, its the capacity improvements needed on the mainline to make this at all worth while. Quadtracking it at a minimum, and then already you're looking at a project which is likely to be even more expensive than Metrolink will be.
DART+ and BusConnects also seem to be proceeding alongside Metrolink just fine. And both of them are very much using existing assets.
In fact Dart+ very much hinges on Metrolink also being in place and the interchanges at Glasnevin and Tara St to really work well and to get the maximum benefit from these heavy rail lines.
So what existing assets do you mean? Obviously DART Underground doesn’t exist, nor does a spur to the airport. Quad tracking might as well be a major new project given how disruptive it will be. Though as LX says, perhaps other options like triple tracking etc. will be possible, we will have to wait and see.
Of course non of these will connect Swords to the city, the 5th largest urban area in Ireland, a commuter town of Dublin, with plans for it to grow to 100,000 people.
Metrolink has to be built, nothing else makes sense.
Re the northern line, I’m going to sound like a broken record here, but perhaps would it not be better to wait and see what the results of the ongoing EU funded feasibility study into possible Northern Line expansion actually says before making such pronouncements?
It’s getting a bit tiring reading all of these pronouncements here while there is a professional engineering study being carried out which will give us a definitive answer.