Hey Folks
I remember reading a great thread here from one of the lads that had fantastic detail in their conversion. I was a bit inspired by it to share my own progress.
I moved to Portugal recently, following a break up, and I'm building myself a campervan as a bit of a passion project and to help me focus on myself more. I started my conversion last month. I work on it during the weekend, and maybe one night each week. Im not in a rush so i expect it will take about 1 - 1.5 years.
I purchased a 2019 High top extended Ford transit. L4H3. Then got to work on it. Im just following vids on youtube, learning from the reddit community, and lots of trial and error. I have basic skills that i learned in secondary school wood working, but a light hobbyist interesting in electronics.
Tearing out walls/floor, Treating rust, and painting
This is what it looked like when i bought it. It was in good shape but just dirty and not suitable for my needs. All the walls and flooring needed to come out so i could check for rust or problems everywhere.
This was the biggest patch of rust, just on the wheel encasings. It looks like the owner before hand (a delivery company) cut the wheel casings to have these flat stackable areas rather than the rounded wheel encasings that come with the van. The did a poor job welding and there were several small holes letting moisture in. The metal also was poorly protected.
I started pulling the wooden walls off the van. It was very very tough work. After all the screws were removed, there was an inustrial strength glue used everywhere. It wouldn't come off without alot of force.
I then had to buy a heat gun, and melt the glue and use a hot chisel to remove it and the wood. It took days. After the glue was mostly removed. I used a wire brush on my drill to grind away the residue that remained. Another few days but it was a bit of fun overall.
It was about 25C inside the van because of the sun, so i frequently had to stop because of the heat guns extra heat :D here is a general shot of the worksite
Next after removing the floor which only took 20 minutes. I began working on the hole filling in the bad welding job, the rust treatment and painting. I first wire brushed all the rust off the encasing. I then applied a rust solvent which finished the last remaining specs of rust. After it dried. I used an epoxy metal resin mix to fill the holes i could see. only 3 holes but one was about 2 inches long (5 mm thick).
Here is the epoxy resin filled hole. This stuff about 1 day to dry. Only about 20 minutes to apply. It is rock solid after a day.
I put some silicone around the edges and then painted it all with Hammerite white paint. I think its now much much better and i'm very glad i did this prep work. I have zero experience with rust or metal so it was all new to me.
I then washed it three separate times. It was quite dirty and sticky dust. After washing I painted every single place I could see anything but white paint.
That's it so far. Feel free to make any comments or criticisms. I'm happy for feedback anytime if it saves me making a mistake!
Next I will be putting in an insulated flooring made of 60mm wood beams and 60mm XPS insulation. I think i choose too big of insulation for the floor. It will work of course, but 60mm is probably a bit silly. 40mm would be perfectly sufficient for the floor i think. As the van is a high top, im not stuck for head room. I'm only 5' 9. The wood is also heavier than i thought it would be.