We have 1970s semi-d that we plan to renovate and extend in the near future. The ground floor is over a foot above ground level. My neighbour is renovating now and says there is no insulation underneath the ground-floor concrete slab. He’s putting insulation on top of the existing floor and then pouring a new layer of concrete screed over. Given that our ceiling is barely 8 foot to begin with, I’m not keen on this solution. What would the cost implications be of removing the existing concrete slab, insulating and repouring vs putting insulation and concrete screed on top of the existing floor? Even better if we could lower the floor further to get more head room downstairs. Is that possible?