91wx763 wrote: » A Waterford IE fiend tells me it's only going to Sallypark yard but the customer hasn't realised that yet.....
IE 222 wrote: » Why would it only go as far as Sallypark? Whatever some might think of IE their both professional companies doing business here. I'd be fairly certain both companies have had detailed discussions about the service and have agreed and ironed out exactly how and where the service will run too before signing contracts.
Mimon wrote: » 12 YO son is mad into trains and would like to get a video of an Irish freight train. Was thinking just parking up near the Tara mines line near a level crossing and waiting it out. How many are running there per day does anyone know?
tabbey wrote: » Is the railway between Sallypark and Belview closed now? I thought that the track beside the closed main platforms was available for freight movement towards the Rosslare direction.
IE 222 wrote: » Why would the line need to close for 2 years. The line will be separate from the development.
andrewfaulk wrote: » The development includes a new station over the existing line.. You can't build over an active rail line, so it is proposed to take the line under a T3 possession to facilitate the work..https://waterfordnorthquays.ie/construction-of-a-new-transport-hub/
Construction Stage CE Response: While it is proposed to close the line during construction to expedite the works as efficiently, cost effectively and safely as possible, the existing track will remain in place and will be available for limited use should it be necessary. Such use could impact on the delivery of the project and requirements would therefore be reviewed on a case by case basis. The track and signalling alterations, which will be carried out during the latter stages of construction, will result in disruption to the access to Belview but every reasonable effort will be made to minimise disruption.
Jamie2k9 wrote: » Page 14:https://www.waterfordcouncil.ie/media/projects/public-consultations/sdz-transport-hub/190911%20CE%20Report%20Transport%20Hub.pdf No creditable reason for long term closure during construction.
andrewfaulk wrote: » Up to 2 years is what I was told.. Same source as the 8 months to re-instate the pocket wagons.. Both times do seem excessive to me, but maybe there is an element of engineers within IE quoting longer times than people might expect things to take
IE 222 wrote: » How long are the pockets out of use? Where not been used to supplement the Dublin service?
andrewfaulk wrote: » Since the end of the DFDS service, so since the end of June 2018.. Dublin-Ballina uses 3 sets of flat wagons, pocket's have been on IWT's since summer 2017
andrewfaulk wrote: » I'll pass the message back to my sources in IE for you so and they can take it up with the IM
Makes sense. I see the plans and drawings show double track running up to Plunkett. Is there any info if the double track will continue up to Limerick Jct line. Have they announced what will happen with the old station?
tabbey wrote: » I am familiar with the term "possession", but what specifically is a T3 possession?
Jamie2k9 wrote: » You sure can! I don't want to argue with you but the railway line doesn't need to close for the majority of the project. The council response will have been directly fed back from IE who I understand requested it to be operational. If XPO starts and proves to be successful they should be considered a priority by IE and all reasonable avenues explored to ensure full operations. Longer liners could possibly help to reduce the number of movements during any construction. Anything other than the double is unknown (the published reports say design is IE area), it should be double from the new station to where they branch off today. The whole yard will likely be done so they should do it right.
tnegun wrote: » What congestion does the IWT liner cause that its being refused access to the port? Surely it be timed or held in the NW yard to arrive the port at the least congested time or what am I missing?
IE 222 wrote: » Is this the reason Waterford is restarting or is this lost business?
DoctorPan wrote: » Reports coming in that Dublin Port has relented and the liner will start again next week