aisling86 wrote: » Yes thats the one down the side of graveyard.
yerwanthere123 wrote: » So obviously there's another bridge going up here I take it. I go for runs on that road as well, will be weird having a little secluded country road having a new primary road built over it.
marno21 wrote: » The new N22 will go under this road here, so they will be starting on an overbridge next month (just like Coolynane Road Upper)
aisling86 wrote: » Picture from Michael Creed Facebook page Beam lift yesterday
spacetweek wrote: » Nice picture but not sure why he felt the need to badly photoshop a digger and piles of soil into the bottom right.
marno21 wrote: » Work on the last 2 structures on the Macroom bypass to commence shortly with associated road closures: L7456 Clonfadda Road: May 4th - September 10th L7459 Kilnagurteen: June 8th - December 3rd Should see all structures on the Macroom section complete in 2021. Be nice to see this section open next year.
HillFarmer wrote: » Has anyone confirmed the Macroom section will be open next year and if so is there any ETA?
yerwanthere123 wrote: » Is tomorrow the last day of the Clonfadda road being open until September? Was maybe thinking of going up and taking a few photos, and I could then post the before and after in September. Although the weather is supposed to be terrible tomorrow, today would've been my day to do it.
aisling86 wrote: » Yes closed 4th May until 10th September
yannakis wrote: » Is it this part that's closed for the period you mentioned?
marno21 wrote: » Sure is.
marno21 wrote: » Down to one lane now at Carrigaphooca where work is commencing on the new alignment of the existing N22 (future R608) Work is underway now on the new roundabout beside the bridge which will form one half of a dumbbell junction albeit with no slip roads onto the N22. This is going to be septic at peak times with the travel limits being removed and stuff opening up. (Not that the travel limits are being enforced atm anyway).