spacetweek wrote: » It's also hard to see how Newbuildings-Strabane makes no sense on its own when it's a part of the Dublin-Derry corridor. Granted that Dublin-Donegal journeys won't use it.
spacetweek wrote: » It's also hard to see how Newbuildings-Strabane makes no sense on its own when it's a part of the Dublin-Derry corridor. Granted that Dublin-Donegal journeys won't use it. B'gawley-Augh is admittedly low on the priority list as it's so low-traffic.
Pete_Cavan wrote: » They should push ahead with Omagh-Strabane on its own if it has a stronger case. Hopefully on our side of the border Lifford-Letterkenny and the N2 schemes get delivered without major issues. If all that were happening, something would have to be done between the border and Omagh.
Deleted User wrote: » They actually make things down here look efficient.
serfboard wrote: » The omnishambles that is the M20 here would beg to differ ... And now we have a Minister openly hostile to it.
Deleted User wrote: » They actually make things down here look efficient. If they followed that report they won't be building anything resembling a road for the next 10 years.
Cookiemunster wrote: » I wouldn't call the M20 an onmishambles. It originally got cancelled due to the recession. When it got reactivated it had to start from scratch due to changes in European law meaning that the original project couldn't be reused. Since reactivation it's been slow, but has moved along smoothly through the different stages. Ryan won't stop it getting to ABP and won't be in government when time comes for it to be built. It's got nothing on what's going on with the A5.
MJohnston wrote: » Fairly scathing rejection of the A5 plan:https://twitter.com/niroads/status/1371806968667602951?s=21 This could be dead in the water in its current form
MJohnston wrote: » Great blog post by Wesley Johnston on the A5:https://wesleyjohnston.wordpress.com/2021/03/18/lessons-from-history-for-the-a5-wtc/amp/?__twitter_impression=true I too, would like to see this broken up into separate schemes, and for the Omagh to Strabane stretch to proceed.
KrisW1001 wrote: » N2 Clontibret to Border will be constructed as a Type 2 DC. I think Aughnacloy-Ballygalway could end up as a bottleneck on what would end up as the main Dublin-Letterkenny/Derry route once completed.
KrisW1001 wrote: » I tend to agree with Wesley - the problem is that making the A5 upgrade an "all-or-nothing" bundle, rather than a roadmap of improvements is what's killing things. I think most people would put up with a short bottleneck if it was the price of upgrading the much longer Ballygalway-Omagh-Strabane stretch. I think this bundling may have been done by the NI Roads Service in an attempt to maximise the chance of getting part-funding from the Republic, as the Ballygalway to border section is really of no use to anyone except Southerners.
lucernarian wrote: » If that conclusion is true for the A5 at aughnacloy, I struggle to understand how we could simultaneously justify a dual carriageway immediately below that location, at least north of Monaghan. I thought some local bypass of aughnacloy could be considered though...
MJohnston wrote: » See, I still maintain that positioning the A5 as a "Dublin to Derry" main route gives the whole project a really flawed business case. The A6 upgrade will be finished in under a year, and once that is done, it will offer a 213km journey from junction 14 of the RoI M1 to the Altnagelvin Roundabout in Derry. Nearly 200km of that journey will be on high quality dual carriageway or motorways. The other 13km over the Glenshane Pass is alternating 2+1. The current N2/A5 route from the same junction 14 to the same Derry roundabout is about 169km. However the vast majority of this existing route is either single carriageway or, at best, alternating 2+1. So we're talking about an extra 44km on the A6, but likely at full motorway speeds for the majority of the journey, compared to a shorter journey with slower average speeds with unpredictable interruptions. Even if the N2 and A5 upgrades could shave another 10 to 15km off of that route, I'm still not sure I'd call that a compelling business case*. Where the A5 upgrade makes most sense is a "Dublin to Letterkenny" artery, which is why it's become such a political football in The North. Here you currently have 165km on the A5 from J14 to the N13/14 roundabout, compared to 240km via the A6. IMO, most critical to making the A5 into a viable route for this journey is bypassing the big bottlenecks in Monaghan, Omagh, and Strabane.
circadian wrote: » Depending on what day/time I'm leaving at I'll take either route to/from Derry/Dublin. Personally, I think the A5 is required because taking the route via the A6 means using some roads in the north that I'd consider poorer quality than they should be. Sections of the A1 are outright dangerous with level crossings and national speed limits. The quality of the M1 and even moreso, M2 is degrading and of a standard much lower than that of motorways in the Republic. The sliproads are astoundingly short in some areas and this leaves people merging onto these motorways entering at lower speeds than what I'd be comfortable with. The A6 dualling is of great quality though and I've enjoyed that stretch any time I've driven it. However, for connectivity with Derry/Letterkenny it really does make sense to upgrade the N2/A5 corridor as it completely rules out the risk of congestion in Belfast.
BelfastVanMan wrote: » And from Loughbrickland to Beech Hill, of course.
MJohnston wrote: » Like I said, I just don't think the business case of N2/A5 as a Dublin-Derry route makes sense, I think it's a good choice for Dublin-Letterkenny/Donegal. Though, I do wonder if this was an all-island situation whether the A29 would be a better upgrade target than the A5.
KrisW1001 wrote: » "All-island" doesn't mean the same thing as "United Ireland". A29 would really only offer a better Dublin to Derry route, but as Derry is not a destination within the Republic of Ireland, it is not the job of the Republic's transport budget to facilitate improvements to the road network to and from Derry, especially when such a plan would still leave Donegal poorly connected to the rest of the Republic. A5 allows connection to the Republic's network at Strabane, which is much more useful for the people of Donegal trying to get to different parts of their own country. It may have been dressed up in "Cross-border friendship" blather, but the Republic's primary reason for offering even a cent towards an upgrade of the A5 is so that the NI Roads Service will prioritise improvents to a road that connects Dublin with northern Donegal (particularly Lifford and Letterkenny). A better route between Dublin and Derry is a side-effect of the Republic's involvement with A5 but it is not, and never was, the main reason for the funding contribution.
KrisW1001 wrote: » A better route between Dublin and Derry is a side-effect of the Republic's involvement with A5 but it is not, and never was, the main reason for the funding contribution.
bennyineire wrote: » Can it not be both at the same time, you are very "black and white" on the justification
MJohnston wrote: » Exactly! Which is why it is fairly egregious that the NI authorities choose to prioritise the section of the A5 between Strabane and Derry, which offers close to zero value to the people of the Republic of Ireland. It's also a bit ridiculous that nobody in the ROI government challenged this approach.