yascaoimhin wrote: » just reading Iarnród Éireann's 2027 Strategy and I noticed a difference in language used for the proposals for DART+. On the Maynooth Part of DART + they make specific reference to level Crossing REMOVAL, whereas on the Bray/Greystoneas Branch the only mention Level Crossing CLOSURE. I was thinking ti would be fairly impossible to close all 4 level crossings in Sandymount without expensive engineering changes, maybe they're considering just closing them at peak hours?
dublinman1990 wrote: » Oh my god. That is a massive amount of new carriages to order for the Dart network alone
Thelonious Monk wrote: » Does anyone here know what's happening with the Merrion gates? Are they building over/under it to handle traffic?
Thelonious Monk wrote: » Is it essential to have these gates gone for DART+ to operate? I just can't see how they would ever get any kind of planning permission to do anything around there, if the recent cycle lane debacle is anything to go to. Building there would surely impact the affluent residents.
Ireland trains wrote: » Irish rail will probably say that the crossing is closing and that either they put in a bridge/underpass in place and close the crossing or that they will just close the crossing. Either way the crossing is closing. If trains are every 5 min each way at peak times thats 24 trains passing an hour. It needs to be closed.
Pete_Cavan wrote: » Could a mod move the posts relating to rolling stock to this thread please?https://touch.boards.ie/thread/post/115823938 I'd also suggest talk of the Merrion Gates should be moved to herehttps://touch.boards.ie/thread/post/114305435
Thelonious Monk wrote: » Can they not just kick up a fuss with Mannix Flynn etc and have it stopped? Didn't they stop the metro plans elsewhere on the southside? I know I sound terribly cynical, but right now I can't imagine them doing something that would upset the locals.
cgcsb wrote: » Exactly there'll be stations outside the M50 on the same line in semi rural areas only 3-4 km apart while the much more densely populated Dublin 10 & 12 have no stops between Parkwest and Heuston, makes no sense. There should absolutely be a Kylemore Stop and perhaps an Islandbridge/Heuston West stop
AngryLips wrote: » And a Conyngham Road stop
p_haugh wrote: » Would it be possible to connect platform 10 at Heuston to Conyngham road via a pedestrian bridge going across the Liffey beside the tracks into the tunnel? Or is there a lack of space on the Conyngham Road side I wonder.