Quackster wrote: » Not really. Bypass or not, both towns need relief roads and it makes sense that the relief roads are built first and they'll cost a lot less and be built faster than a bypass would. And I've no doubt that a proper bypass will be built eventually.
road_high wrote: » Abbeyfeale is tiny! Does it really need a relief road in addition to a bypass?
annfield1978 wrote: » N4 Mullingar to Roosky will be out in the next couple of days for Phases 1 to 4. Consultants have been appointed for the N21 Abbeyfeale and Newcastle West Bypasses
Limerick74 wrote: » The two projects are being appraised together by the same consultant, so let's see the results of the appraisal process before giving out as usual. :rolleyes:
Pete_Cavan wrote: » Is it possible that they build single carriageway roads now but include for the possibility of upgrading them to some form of DC in the future?
marno21 wrote: » Scheme website launched @ www.n21newcastlewest.ie To me, the best solution here would be a 2+2 extension from the M21 end at Rathkeale to west of Newcastlewest. A similar 2+2 between the Limerick border and east of Abbeyfeale would leave a 12-14km gap between the two towns which could be infilled at a later date. It would address the traffic issues in both towns and complete more than half of the N21 Abbeyfeale-Rathkeale dual carriageway.
Mc Love wrote: » Never even knew about this, cant say I'm surprised, I usually bypass the N21 from Limerick to NCW myself taking cross country roads and manage to just come out near the pertrol station before the church
ongarboy wrote: » But you're not actually bypassing NCW then if you end up back in the town near the church? Being honest, of the three towns, Adare, Abbeyfeale and NCW that are not bypassed, I find NCW the least problematic and virtually always free flow. I think it's only if I'm unlucky to coincide my drives to Kerry during Mass times or school runs do I ever find NCW congested. Regardless, a bypass will still be most welcome for those long distance journeys!
steeler j wrote: » Looking forward to seeing the options for this scheme and see how much of a gap between this the the adare /foynes scheme
Limerick74 wrote: » The gap is the distance between Rathkeale and some point outside of Newcastle West if they stick within the published study area.
marno21 wrote: » Blue or yellow would be ideal here. Away from the town, direct, and can be integrated into the future N21 upgrade that will be required between Rathkeale and the end of this scheme. The approach to the N21 in the NDP is bizarre to say the least. Routes such as the N17 (55km), N20 (80km), N24 (80km) are getting lengthy seamless dual carriageways. They are filling in gaps in the dual carriageway on the N4 and N25. When these 2 schemes are done it will be: M21 Patrickswell-Rathkeale (17km) Single carriageway (~8-9km) N21 Newcastlewest Relief Road (5-9km) Single carriageway (12-15km) N21 Abbeyfeale Relief Road (6-9km) Single carriageway (14km) N21 Castleisland bypass (4km) There is no other road being developed in this manner. On the plus side, these smaller relief roads will get through planning quicker and be with ABP in 2023, and would be ready for construction in 2026 or so. They'll be ahead of the bigger schemes in the queue so might hit the ground running.