BonnieSituation wrote: » Metrolink is going ahead
IE 222 wrote: » I know but if for some odd reason it doesn't or it gets put on the long finger after this crisis I guess Glasnevin could be pulled. Same with Dart.
Dats me wrote: » Looking at it again it's crazy that they're choosing this Do Min option given it's €130m when Option 6B was only €198. Submissions due today for anyone who wants to mention Connolly and Loop Line Bridge capacity that needs to be prioritised. Also cycle parking at the outer stations I'd say.
Thrashssacre wrote: » Does it not make more sense to alternate services between Spencer dock and Connolly/ grand canal Dock so people can board a service that suits them rather then needlessly changing? Having all kildare survives use docklands makes little sense to me split it 50/50 then with more frequent lines like maynooth maybe have every 3rd train use Spencer Dock.
Ireland trains wrote: » Article is a few weeks old but would anyone with a subscription be kind enough as to post the what it says:https://amp.independent.ie/irish-news/the-man-who-went-from-tinkering-with-tractors-to-ruling-the-railways-39565051.html
IE 222 wrote: » The "do minimum" was option 3 on the report. That's not been done. It's literally track renewal works on the northern throat of the station and there's not even much been renewed. The main addition is a crossover between the up and down Maynooth line before Ossory Rd. This allows a down train to use the up line to exit platform 6. See diagrams below. The faint red lines are new track the faint broken green lines are tracks been removed. The drop lock on Newcome curve is been done as well. That's the biggest investment been made in Connolly.
blanch152 wrote: » Have they ever looked at an interchange at Connolly with a platform on the line passing underneath to Spencer Dock?
Carawaystick wrote: » There should be better access to Connolly, the old dart entrance or an entrance off Seville Place, and access between platforms over the northern end of the platforms.
loyatemu wrote: » I think there's also supposed to be a bridge connecting the platforms so not everyone has to dog-leg through the underpass to make connections.
Victor wrote: » Splitting transfers between Glasnevin and Drumcondra would mean some passengers would need to unnecessarily transfer an extra time.
strassenwo!f wrote: » Victor, I've been meaning to reply to this for some time, but other things have unfortunately got in the way. I'm still not entirely sure what the IE plans for Glasnevin Junction are, but it does seem to me that they are planning to continue to have rail services on both the current Maynooth line through Drumcondra station and on the Midland line (beside the canal).
If so, then a station on the Midland line in Drumcondra should make sense anyway, to serve that area, with the section around Whitworth Parade being an obvious location for station construction. There seems to be ample space either side of the tracks to put in platforms, perhaps with some relocation of the trees there - if that is deemed necessary. (I'd favour relocation of the wall as the major change, as I quite like having trees on station platforms). Even if that's not possible, there would seem to be considerable scope for building another Drumcondra Station - though with more expense, of course - along Whitworth Road. That would probably require narrowing the canal in that area, and considerable earthworks there, but it's hard to see that it would be a major engineering project. In any case, either of those projects could tee up construction of a suitable underground location under Drumcondra Road for a very effective metro station with connections to both 'DART' lines.
Victor wrote: » I think a decision will need to be taken on what platform layout will be done at Glasnevin station - the proposed three platform layout (two lateral and one island platforms) or two island platforms. Two island platforms would mean all eastbound trains could use the GSWR line and all westbound trains could use the MGWR, allowing there to be fast and slow tracks. However, this would mean conflicting train movements at Glasnevin Junction, unless one puts in grade separation. About the only place for a Drumcondra station on the MGWR line is between the locks at Drumconra Road and St. Brigid's Road Lower. Further east is impractical as the adjacent properties are too close and further west interferes too much with the canal locks and is too close to Glasnevin.
Victor wrote: » About the only place for a Drumcondra station on the MGWR line is between the locks at Drumconra Road and St. Brigid's Road Lower. Further east is impractical as the adjacent properties are too close and further west interferes too much with the canal locks and is too close to Glasnevin.
IE 222 wrote: » You couldn't fit a station along Whitworth Rd.
strassenwo!f wrote: » And Whitworth Place
strassenwo!f wrote: » It seems pretty obvious that a station along Whitworth Road would be easy to build, but it would probably require realignment of the tracks, significant earthworks, and temporary closure and eventual narrowing of the canal in that area
MJohnston wrote: » **** that — if you want to widen the tracks there for some mad reason, fight it out for space with the motorists on the road. Leave the canal alone.
Zebra3 wrote: » Why not put a station at Summerhill/Ballybough instead?
People can change at Glasnevin for Drumcondra if needs be.
Victor wrote: » Too narrow.
Victor wrote: » Leave the tracks alone. Put the eastbound platform under the road and the westbound one where the canal bank is now. Perhaps, shift the canal slightly south. I'm not suggesting much encroachment on the canal itself.
Zebra3 wrote: » Why not put a station at Summerhill/Ballybough instead? People can change at Glasnevin for Drumcondra if needs be. Let's serve as many areas as possible.
strassenwo!f wrote: » This should also be very doable, but I would favour Whitworth Parade because of cost.