eastwest wrote: » The figure for all of Mayo is somewhere north of 300 freight trains annually, so I don't know where he got 1,000. Maybe he added in the figures for Athenry-Galway? I wouldn't be the first time somebody used them to pad out a weak argument:):)
andrewfaulk wrote: » Apologies, but I don't have the willpower to read every post in this thread. Your comments did not read to me as if they were talking solely in the context of landbridge, particularly this one.. "There could be all the tonnage in the world from industry in the West - it would still be more efficient to bring it by rail to ports on the East and South coasts and ship it from there to Europe than it would be to ship from Limerick"
Isambard wrote: » added in passenger trains perhaps?
Pete_Cavan wrote: » I'd say someone told Calleary there are over 1,000 freight trains in and out of Mayo each year and by the time he stood up in the Dail, he had it in his head to was 1,000 trains out and that's what he said. I'm giving him the benefit of the doubt that his bias towards the project lead to him inadvertently getting his facts wrong, rather than intentionally misleading parliament. .
westtip wrote: » If that is the case all he needs to do is make a statement in the Dail that he inadvertently misled the House, apologizes, and corrects the matter for the Minister and the members. He knows how to say sorry and put the record straight, but as it stands he has mislead the Dail. He needs to make that statement though.
IE 222 wrote: » Better still, you could stop trying to make a mountain out of a molehill.
donvito99 wrote: » An apt turn of phrase for this particular project.
westtip wrote: » He didn't tell the truth in the Dail, it is not a mountain out of a molehill, these things have a habit of gathering pace, if you look at the western media in particular the Mayo media on this; His one comment has led to a riot of misleading information published for public consumption. Rose Conway Walsh, Eamon O'Cuiv and Dara Calleary all supported this nonsense freight argument that day in the Dail; Statements have a habit of becoming self perpetuating fact. The whole premise of the argument made by West on Track and the supporting TDs in the chamber that day, is based on a myth that a thousand trains a year already leave Mayo per annum, the actual figure is nearer to one third of that. All Dara Calleary has to do is state clearly in our Parliamentary Chamber, where he is supposed to tell the truth in regard to factual matters; And this is a matter of fact, a statement along these lines: I just wish to correct the record, on September 24th I stated over a thousand freight trains a year leave Mayo for Dublin and Waterford, this statement was based on misleading information I had been given by West on Track, having been given the correct figures sourced from Irish Rail, I can confirm that on the day I made that statement, in the previous 12 months preceding the day of my statement the correct figure was 378 outbound trains (or whatever the actual figure is)....I am sure these figures are easily obtainable from Irish Rail if someone hasn't got them already. That is all he has to do. No mountain, No molehill no fuss, and a level playing field.
westtip wrote: » He didn't tell the truth in the Dail .... I just wish to correct the record, ... That is all he has to do. No mountain, No molehill no fuss, and a level playing field.
IE 222 wrote: » He could just add the word "arrive" to it as well and be done with it.
seekers wrote: » Could we get back to wondering how this line could open again. Remember the motorway to Galway from gort and the Waterford Dublin motorway don't pay for themselves either
eastwest wrote: » They do, if they're used. Which sums up the problem with phase 1 of the wrc, and explains why it's not going any further. Any investment made with our money should be based on facts, not wishful thinking. So on that note, maybe we could get back to wondering whether Calleary will correct the false information he gave to the Dail?
seekers wrote: » And what about the limerick tunnel Waterford motorway. M18? All built to front load connectivity
IE 222 wrote: » Any campaign focusing on such trivial matters is destined to fail. You probably inflicted more damage upon the campaign than he did by dishing out that level of tripe.
eastwest wrote: » He'd still be wrong, with around 250 imaginary trains still on the record.
westtip wrote: » Lying in the Dail is not a trivial matter, nor should it be, asking him to correct his statement is simple; that is all. It is not pivotal to any campaign and as for damage to the greenway campaign, you are entitled to your views, however citizens are equally entitled to truthful statements, it just depends what kind of democracy you want to live in, its simple really, he was misled, probably by the lobbyists he supports, with misinformation which he may have thought was right, it was wrong, he needs to correct the Dail record. End of really.
IE 222 wrote: » He didn't set out to lie. Its easily explained as to how he came to that figure and realistically it would be you left red faced rather than him.
IE 222 wrote: » Obviously depends on your agenda but if it wasn't for the WRC Athenry - Galway numbers would only be a fraction of what they are.
westtip wrote: » If the money had been spent on double tracking, Athlone to Galway, the Athenry Galway numbers could be just as much. You don't need a train starting in Limerick to increase usage of the Dublin Galway line form Athenry into Galway, you need investment in the Dublin-galway line to allow for stopping commuter services - Athlone to Galway and express services. A benefit accrued from the WRC is indeed the increased numbers using the more frequent service from Athenry to Galway, on the extant Dublin Galway line but that more frequent service could have been delivered with double tracking the main line from Athlone, it would have been of far more benefit to the region and would have helped Irish Rail really compete with the xpress bus services belting up and down the M6 every half an hour.
westtip wrote: » No problem then so, lets just allow him to get away with telling porkies then so to suit the needs of him and his wee clan in the Dail to mislead the Minister. We can agree to disagree on this matter. he needs to retract his statement you think its trivial, ok then so, we disagree. end of, I would be more than happy to be red faced and expose his lies.
The commitment on the western rail corridor in the programme for Government is not to build or complete it but to carry out such an appraisal of such a benefit to cost ratio. The last time it was done it came out negatively at a cost of 100 against six - 100 being the cost and six the benefit. Most rail projects come out around 100 to 80. It did not come out of that well and had a negative net present value over 30 years.
IE 222 wrote: » Fair enough but I think it just shows the strength of your campaign if that's the carry on you've to resort to.
IE 222 wrote: » The WRC allows IE to maximize fleet utilisation and I'd imagine Phase 3 will do the same with Westport and Ballina.
ezstreet5 wrote: » It goes both ways. I've quoted the following Leo Varadkar Dáil statement from 14th Feb 2018 many times: We all know that the "last time" was the 2030 Rail Network Strategy Review (2011) prepared by AECOM/Goodbody. The actual scores reported were 61/100 for Phase 2 and 37/100 for Phase 3 and not 6/100.