kdevitt wrote: » Because that's whats come up through the various residents committees dealing with it. Feel free to engage with your local TD's like we did if you feel someones voice as a "local" isn't being heard though.
riddlinrussell wrote: » I think a lot of people are countering your comment regarding people not wanting a bus ratting by their window by defending the design allowing for buses or showing that there are no planned bus routes along here. Lets for a moment assume that the issue is not buses, but vehicular traffic along this route in general (Which I imagine was what you originally wanted to express?) They wouldn't be rattling past anyone's bedroom window, as, having looked along the route on both sides on street-view, no houses directly back on to the actual proposed corridor, on one side there being a stepped back street between the houses and the corridor, on the other just a road with no houses on it directly at all. In fact it almost looks as if they were intentionally designed that way to provide a corridor for a potential overbridge between them at some point in the future. These sorts of corridors are quite common, A huge green space exists in my estate because a bypass was planned to go in there a few decades ago, which never ended up happening (at least in that exact location).
kdevitt wrote: » Bus Connects has the Leixlip - Blanch route passing over the Clonsilla level crossing, which is being closed off - so I'm not sure there's been a whole lot of communication between Dublin Bus and Irish Rail here. As a local, who lives in Coolmine, the suggested approach is not acceptable for a variety of reasons. The suggested bridge is 9 metres high on the Stationcourt side, and runs 5 metres from the houses in Kirkpatrick and directly in front of the Stationcourt apartments. Riverwood is already 3m below track level, resulting in an effective 12m high bridge into their cul de sac. Any bridge here runs contrary the the Fingal development plan where it was stated a bridge was not to be built at this point. Regardless of whether you think people should have to put up with a bridge outside their house, the exit point for the road is one of the worst junctions in the areas and is currently set to allow 4 cars exit - which causes considerable traffic as it is. Increasing this will just exacerbate existing traffic problems in the area. I think most locals are happy for the level crossing to be upgraded and to be closed at peak times if needs be. That should be the first step, if there are massive issues as a result, then IR should look into an approach which doesn't involve turning two cul de sacs into a main road.
Zebra3 wrote: » You think? So you don't know? Define local? Where's the cut off distance to be defined as a local on this matter? All of these "locals" are happy for what type of upgrade to the LC?
donvito99 wrote: » Well it's the NTA running Bus Connects and Dart+. And with the new bridge, wouldn't the bus just run over that rather than hitting a dead end former level crossing?
kdevitt wrote: » I think most locals are happy for the level crossing to be upgraded
Sam Russell wrote: » Not at all. The requirement to have 5 m clearance would be required for bin lorries, HGVs etc. Striking OH lines would be anything but funny. All measures used by broadcasters is usually double decker buses or football pitches. They tend to have limited imaginations but maybe it is me. I have no idea how big a football pitch is, or even what type of football it applies to. I have an idea a double decker is able to pass at less than 5 m (4.6 m i believe). If CIE specified an HVG, I would be surprised.
kdevitt wrote: » Bus Connects has the Leixlip - Blanch route passing over the Clonsilla level crossing, which is being closed off - so I'm not sure there's been a whole lot of communication between Dublin Bus and Irish Rail here.
D15er wrote: » It is a fact that it is a design requirement of whatever solution is put in place that it can accommodate a double-decker bus. That is fact. IE dismissed any design that could not do so. It would be odd to be so prescriptive about buses if there was no way a bus would ever be travelling this route. No?
IE 222 wrote: » Bus connects has taken into account the DART upgrade and there is still no bus routes proposed for Coolmine road.
D15er wrote: » That's not very nice now.<snip>.
D15er wrote: » I think it's odd to design the entire system based on peak capacity.
IE 222 wrote: » I think this sums up the problem here. Objecting to things you don't know anything about while not realizing your jeopardizing the very thing you seek from it.
Sam Russell wrote: » Let the locals decide when they get the real facts - no bus route and frequent trains.
D15er wrote: » Honestly, I don't know. I should say that I'm not living close enough to the station to be directly affected either by the new bridge, the closure of the crossing or anything else, and that I've been getting the train from Coolmine for 20 years, so an improved service would be fantastic. I just think the current plan stinks. I know IE are aiming for 15 trains per hour at peak, they'll never achieve that, but off-peak it will be a fraction of that. I think it's odd to design the entire system based on peak capacity.
D15er wrote: » What I mean is, you don't need to have the level crossing closed off permanently, if you close it at peak times. If you build a new bridge, the bridge is there 24 hours a day, 7 days a week - but you only really need it for three or four hours, 5 days a week. So you close the crossing at peak times. Motorists just have to suck it up and go elsewhere. You save millions of euro, you avoid lengthy legal rows with residents, you get your electric line built a lot more quickly.
riddlinrussell wrote: » I don't see why its odd to design the system for peak capacity, if you don't design for peak capacity you cant achieve your peak capacity...
Rulmeq wrote: » Would it be possible to "close" the road from 7am to 10am, and 4pm to 7pm, with warning signs and the like, and just have it as a normal level crossing the other times?
MJohnston wrote: » If the level crossing is to remain, it should be permanently closed during peak times and an hour before peak. Too many catastrophic failures of entire commuting peaks (and some entire days) are caused by vehicles striking level crossing gates on the existing DART lines.
Sam Russell wrote: » If the plan is 15 trains per hour for each direction, that is two minutes between trains crossing the LC. Here in Sydney Parade, the gates close two minutes before a southbound train and three minutes before a northbound one. We currently hav a ten minute service for Darts plus the Wexford trains plus the diesel commuters serving Bray from Maynooth and Drogheda. At peak times, the gates are closed more than 50% of the time - and that is half the frequency quoted for Coolmine. Let the locals decide when they get the real facts - no bus route and frequent trains.
D15er wrote: » I know IE are aiming for 15 trains per hour at peak, they'll never achieve that, but off-peak it will be a fraction of that. I think it's odd to design the entire system based on peak capacity.
D15er wrote: » Honestly, I don't know. I should say that I'm not living close enough to the station to be directly affected either by the new bridge, the closure of the crossing or anything else, and that I've been getting the train from Coolmine for 20 years, so an improved service would be fantastic. I just think the current plan stinks. To me, it seems like adding a pedestrian and cycle bridge at the existing LC to allow constant flow of people is logical, then car traffic just has to take their lumps with the level crossing. Give trains full priority and people will eventually learn to avoid the crossing at peak time, then for the other 21 hours a day cars can use it with relative freedom. It costs less, will generate fewer objections, saves a few hundred trees and gets built quicker. It removes the Coolmine road as a route into town at peak time so maybe encourages a few more people to take the train. I know IE are aiming for 15 trains per hour at peak, they'll never achieve that, but off-peak it will be a fraction of that. I think it's odd to design the entire system based on peak capacity.
riddlinrussell wrote: » I am genuinely interested in a local perspective, if the LC is to close for a successful DART+, what would be your preferred solution?
D15er wrote: » Forget it. I thought some people might want a local's perspective but it's easier to look at Google Maps, decide it's all nimbyism and roll out the stock clichés.
D15er wrote: » I understand that. However, it would be unusual for BusConnects to plan a route across a bridge that doesn't yet exist to connect to a Dart line that hasn't yet been built so the current map doesn't mean anything for the future. If the Dart line does get built, the next step will be to figure out how to get people to and from it as efficiently as possible