The key elements include six high speed charging hubs on motorways capable of charging eight vehicles simultaneously; 16 high speed charging hubs capable of charging four vehicles simultaneously; additional high power chargers at 34 current 50 kW locations; upgrading over 50 22 kW chargers to 50 kW, and replacing up to 264 locations with 528 charge points at the pre-existing pilot grade of 22 kW to next generation high reliability models.
AndyBoBandy wrote: » It seems they do... So anything from 3-8 cars charging simultaneously is a hub in eCars mind. And we already have over 50 of them apparently. Just wondering what current eCars sites can charge 8 cars at once*? (I'm guessing this is 4 Twin AC22's in a carpark or something (airport maybe?)) *or are they just counting Ionity & Superchargers in their numbers??
ei9go wrote: » I think there is no business model installing these hubs and that only for eCars they just wouldn't exist at all...
Black_Knight wrote: » Great they put in 2 for redundancy, but what's ESBs plan with these? Are these the start of a hub, or are they just installing a 150 + 50 at each charge point now? I mean is 150 + 50 the new norm for them? Does that mean Kilcullen, portlaoise and Galway plaza are not going to be hubs, and thus won't be filled out with more units? Or do ESB count 2 units as a hub and thus can get the headlines they desperately need?
Progress to dateOver 50 x 3-8 vehicle charging hubs A number of charging hubs have already been deployed and can be found - between junction 2 and 3, Kilcullen, Co Kildare (M9), - Galway Plaza, Junction 6, Kiltullagh, Co Galway (M6) and - Portlaoise Plaza, junction 17, Portlaoise (M7/8). The charging configuration at these locations are 1x50kW and 1x150kW and capable of charging up to 3 vehicles simultaneously.
markpb wrote: » It's entirely possible that other people have needs (or cars) that aren't the same as yours. Pre-covid in my old ICE car, I used to drive from Dublin to various places around Ireland for one-day meetings for work.
ei9go wrote: » New cars now have such big batteries that they mostly can avoid public charging altogether. My eCars bill hasn't exceeded 5 euro per month and I have done over 10,000 kms since getting the ZE50 on the 1st May. Recently drove from Bangor Northern Ireland ( 360 km to home). Left fully charged, 40 mins in Decathlon and then home with 20% remaining.
cruisey1987 wrote: » You're correct, but no one will ever enforce that unfortunately Separated parking areas is probably the best way to go, you either use a charge card or an intercom to open a barrier, and the operator can tell the ICE vehicles to park somewhere else
zg3409 wrote: » I won't put this in the new charger threed as the site is not open yet, but in kells there is a new "motorway" service station and 1 x 150kW and 1 x 50kW has been installed. They are still installing paving and restaurant with 100 parking spaces is not yet open but might open during October so nearly there. Add that to the 44kW also already in kells, means kells has 3 44kW+ chargers all really code by each other, plus a few backup AC chargers. Photos and location on plugshare spp. Service station is called "Park Ri". Its very close to main Dublin Donegal south Enniskillen route so looks like good mid point for such trips. At the other end of this route in Donegal south Laghy is planned to have a 150kW so hopefully this will be a great option on this route I regularly travel.
AndyBoBandy wrote: » As soon as reported ICE’d, immediate tow away/lifted, and a fee of €150 to release the car...
Silent Running wrote: » A noise activated barrier. Anything coming in rattling and clattering and a post comes out of the ground blocking the way. Nice quiet EVs will whisper over it.
cruisey1987 wrote: » I think some sort of orbital railgun is the best solution here
slave1 wrote: » Pulled into the Galway Plaza today on the way home from a few days out and about, was going to go for the 150 if that was available or then the 50, 50 occupied and the 150 ICEd, fek it anyhow, as it turns out I had enough to get home. Still, no point having these charge points if ICEd, clearer notice needs to be provided to ICE cars to tell them parking there is illegal...
Gael23 wrote: » Where are the 150kw chargers located?
zoom_cool wrote: » I seen the Kells 150Kw is installed in the new Circle K called Park RI probably new service station will be open in October
AndyBoBandy wrote: » You gotta love whoever proof reads their website!!
AndyBoBandy wrote: » Thread title needs updating...eCars expansion 2019-2023
six high speed charging hubs on motorways capable of charging eight vehicles simultaneously; 16 high speed charging hubs capable of charging four vehicles simultaneously; additional high power chargers at 34 current 50 kW locations;