L1011 wrote: » The one under planning, as their post makes fairly clear - just as the Ardee Bypass is also at that stage. The N33 is not a bypass!
m17 wrote: » Galway city menlo roundabout is been removed it going to be a 4 way signalled juction
The proposal at the Polestar Roundabout introduces a fully signalised roundabout (including the gyratory section). Localised widening on the eastern and southern arms along with pedestrian crossings added to the southern and western approaches. The western exit is also widened to provide 2 lanes. Ballyraine Roundabout consists of converting the existing junction to a signalised crossroads. The existing pedestrian crossing on the southern arm would be subsumed within the signalised crossroads. The N56/ R245 mini roundabout consists of converting the existing junction to a signalised three arm junction with, localised widening and pedestrian crossings on all arms. The R250 Neil T Blaney/Joe Bonner T junction consists of signalising the existing three arm T junction with pedestrian crossings on all arms. Localised widening on the R250 junction, creating a right turn lane, and forming a new bus bay on the southern approach.
Donegal Storm wrote: » A couple of small schemes in Letterkenny.. Second is an upgrade of the Polestar - Dry Arch section of the N56. They seemed to start work on this (all the trees were cut down) but I see main works are now delayed until Q4https://www.donegaldaily.com/2020/06/09/four-lane-road-scheme-pushed-back-to-late-2020/
spacetweek wrote: » Dry Arch to Polestar looks like it covers a section of N14, not N56.
Donegal Storm wrote: » A couple of small schemes in Letterkenny.. First one involves adding lights to the Polestar roundabout, removing two other roundabouts and adding loads more lovely traffic lightshttps://www.donegalcoco.ie/media/donegalcountyc/roads/pdfs/publicconsultation/Letterkenny%20Traffic%20Management%20Project%20Part%208-%20Consultation%20Report.pdf Second is an upgrade of the Polestar - Dry Arch section of the N56. They seemed to start work on this (all the trees were cut down) but I see main works are now delayed until Q4https://www.donegaldaily.com/2020/06/09/four-lane-road-scheme-pushed-back-to-late-2020/
salonfire wrote: » Roundabouts work fine 90% of the time. Why not make them signal controlled during rush hour only? With lights, there will be a traffic lane stopped 100% of the time. Stupid decision and all because people are too afraid to take small openings in traffic to get on the roundabout.
spacetweek wrote: » I'm unclear what work they will do on Pole Star-Dry Arch exactly. It appears to already be 4 lanes wide?
steeler j wrote: » Thurles to Nenagh road works starting soon at latteragh,the county council have also got the go ahead for a realignment at latteragh bends but the road works starting on Monday are for emergency repairs
sweet_trip wrote: » Horrendous road. Badly needed.
HabibiLibneni wrote: » Undoubtedly a massive improvement though.
Roscommon Herald wrote: This existing section of the N60 had been identified as being among the worst 50 bends on the entire national road network from a road safety perspective.
road_high wrote: » Wouldn’t it be fantastic if our whole National secondary road network was to that nice safe standard.