Idbatterim wrote: » dont built it when times are "bad" when it would be far cheaper to build and we could keep skilled people here, because we dont have the money. The good times come, dont build it, because its more expensive and we need a hundred public consulatations, before the **** all comes crashing back down again :rolleyes::mad:
MrAbyss wrote: » I am assuming they are talking about reopening North Wall station? I didn't realise this was being considered seriously. I certainly hope it is.
Shedite27 wrote: » I had it in my head that this was part of the Salesforce plans going in there (ie that Salesforce were footing the bill so that their new HQ would have a dart station), but I can;t find anything about it online. Did I dream that up?https://www.dublinlive.ie/news/property/first-look-dublins-newest-urban-15697223
CatInABox wrote: » No one has made the argument yet that regardless of the cost, this pretty much has to be done anyway.
Tomrota wrote: » I wonder if anyone can answer my questions. Are these projects definitely going ahead? Have they gone into design stage? Could the next government cancel these plans? How likely is that? Also, could the next government actually expand the plans, like include DART underground and extend the network even further for example?
Last Stop wrote: » But that will be under Metrolink’s RO
Zebra3 wrote: » I would've thought it would be covered by the DART expansion.
Sam Russell wrote: » Could the southbound loop at Clongriffin go ahead?
Conchir wrote: » Is there a plan for this available to view?
LXFlyer wrote: » No. But it would involve laying a track along the east side of the southbound platform, which could facilitate Northern line trains or Enterprise services overtaking DART services.
Conchir wrote: » Yeah I imagined that would be it. So in that case, the stairs/lift on the Baldoyle side would have to come down. Is that part of the development plan for the new houses going in on that side anyway, with a ramp similar to the northbound side?
cgcsb wrote: » A pre-application for this and a micro-consultation on the location of an emergency exit. Honestly you'd swear there was a fortune to be made on not building infrastructure.
cgcsb wrote: » A pre-application for this
Last Stop wrote: » A pre-application is a standard part of the Railway Order process. There will be a series of meeting with An BoRd Pleanala with the intention of making the actual application run smoother by addressing their concerns/queries at this stage. If anything this is positive that the project is advanced enough to commence this
cgcsb wrote: » Im aware it's part of the process. The process is a wasteful load of tripe though. Money that could be going to actually building infrastructure rather than writing reports about it. The level of bureaucracy is just pathetic. In Italy they keep getting you to fill in forms for domestic scale planning permission until you bribe them. But they still don't even have this level of ridiculous for large scale projects. They love an oul report and consultation in Sweden also but Ireland really takes the biscuit with the back and forth nonsense.
MJohnston wrote: » When was the last time a new train station opened in Dublin?
TheChrisD wrote: » Hansfield in 2013, methinks?