The key elements include six high speed charging hubs on motorways capable of charging eight vehicles simultaneously; 16 high speed charging hubs capable of charging four vehicles simultaneously; additional high power chargers at 34 current 50 kW locations; upgrading over 50 22 kW chargers to 50 kW, and replacing up to 264 locations with 528 charge points at the pre-existing pilot grade of 22 kW to next generation high reliability models.
liamog wrote: » I've noticed a tendency on the FB groups for more experienced members who drive Nissan cars, to poo-poo the idea of installing >50kW chargers as an unnecessary expense. They often claim that the majority of cars to date can't charge >50kW so there is no point installing them at all. I wonder how many of these people now have contacts in eCars are influencing decision making.
MJohnston wrote: » What does it take for 50kW FCP to be upgraded in future? Full replacement?
liamog wrote: » They often claim that the majority of cars to date can't charge >50kW so there is no point installing them at all. I wonder how many of these people now have contacts in eCars are influencing decision making.
Deleted User wrote: » Probably too many. Sure , there are no 100+ capable CCS cars out there yet but they are on the way. But, in reality, can anyone expect anything better in Ireland in fairness ?
BigAl81 wrote: » When I hear this I think quango incompetency rather than conspiracy to be honest!
charlieIRL wrote: » I’m currently having a cup of tea and a muffin charging in the service station in Monastevin (anything bar shopping with herself!!) I noticed 4 EV spots marked on the ground but only one charger, marking are well worn, did they take out a second charger from here? Seems a very busy spot
ELM327 wrote: » from memory that spot used to have a Chademo only DC fast charger and 2 type 2 AC 22kW sockets. Replaced with a triple header and remove the SCP?
charlieIRL wrote: » Wouldn’t call it a fast charger....I’m charging at 26kW! Crikey that’s slow.
ELM327 wrote: » I think there is a big cost delta between 50kW and "HPC" - or >50kW - chargers. If the choice is 2 50kW units or one 150-350kW, I think 2 slower units is better for now. At least you're getting some juice. Ecars seem to agree, as theyve installed 2 new 2*50kW locations recently.
KCross wrote: » +1 The site might have short term supply issues too so 2x50kW makes more sense in the short term. We’ve all complained about the single point of failure issue which is much more important than higher speed. 2020 is when the HPC’s are to start being installed and they require significant civil works, not just two standalone units. The HPCs require a substation to be built.
Silent Running wrote: » That's right, but can't they then run multiple chargers off that?
Irishjg wrote: » Regarding Ecars’ future planned 100kwh rollout they also said that these chargers will be subject to a different fee to the standard DC chargers available at the moment. Basically you will pay more to use them. Personally I have no issue with it, just pointing it out in case someone hadn’t seen it.
ELM327 wrote: » Is thatC5HD3 - Mayfield J14 If so, there's apparently supply issues with the site, similar to the Obama Plaza. Rumors of Ionity and/or an ecars hub going in there in the future too so that will be interesting.
Irishjg wrote: » I think Ecars have already said that when fees are introduced for the 22kwh units the cost will be in line with the 50kwh units @ .29c/.33c per kW.
Black_Knight wrote: » That'd be pretty crap. Why would I use the slower charger when I could use a fast charger for the same price
KCross wrote: » Because you value your personal time? Given a choice of slow charging or fast charging I’d pick slow charging if the car is going to be parked up for a few hours anyway. No one really wants to sit at a rapid for 30-60mins. Having said that, I would have expected the slow chargers to be cheaper too. Let’s wait and see.
Black_Knight wrote: » Likely have to pay parking on top of charging fee, and I'd have to call back after X amount of time to move the car (to avoid more parking fees and overstay fees). At least with a fast charger (in my ioniq) I'd only be there 20-30 minutes. Different story with big kona/Tesla/eNiro batteries
KCross wrote: » They have to get the supply to the site, build the sub-station and then connect the chargers to that. Its not a simple/quick process. Lots of time, planning, money(7 figures).
unkel wrote: » Ionity and Tesla seem to have no trouble at all doing that very thing (and probably paying the ESB handsomely for most of that work) Yet they don't need a cent of our tax payers money for it...