jd wrote: » Out of interest, I measured Eamon Ryan's suggested route ("keeping the TBM going") of continuing on via UCD and then on to Sandyford. It's about 7.5 k. That would be another 90 weeks or so of tunelling (ie pushing the time out when services could start ruinning by nearly 2 years)
jvan wrote: » Depending on what direction it goes I presume they could route it via open ground which would allow a new opening to remove spoil and not have to send it all back to Northwood.
CatInABox wrote: » Doesn't look like it from that angle, but they've already acknowledged that Charlemont is the station most likely to change, so hopefully the final design isn't as bad there.
jd wrote: » They could, maybe use Donnybrook Bus Garage (which at least has access to a good road for trucks of spoil). I doubt the locals would be happy with that either!
Pete_Cavan wrote: » It would also be great if the OCS station was also accessible from Parnell Street which would make it easier to get to the Rotunda, DIT Bolton Street, future city library, etc. This can easily be facilitated by having a pedestrian route through the new development to Moore Lane.
L1011 wrote: » Bolton Street hasn't got a moving date yet - the only current campus without one - and based on being "relatively" nearby Grangegorman I could easily see it not moving at all; or otherwise being reused.
blanch152 wrote: » I understand that current plans see Bolton St being retained indefinitely.
Deleted User wrote: » Yeah, rumour was that it was a protected structure so any redevelopment plans for potential buyers were limited by what they can/can't do....meaning interest in the site was a lot smaller than the other city centre locations. Edit: Number 836 on the list of protected structureshttp://www.dublincity.ie/sites/default/files/content/Planning/HeritageConservation/Conservation/Documents/RPS_for_web.pdf
MJohnston wrote: » You can have lots of protected structures and still be pro-development.
blanch152 wrote: » 8,691 protected structures :eek::eek: I knew Dublin City Council was anti-development but that is ridiculous.
gjim wrote: » The more I read of the new emerging preferred route, the more uneasy I'm getting. Any future link-up south of Beechwood is going to be massively disruptive and hugely expensive - getting a TBM into the ground for 2 or 3km of tunnel + cost of mining out a station in Ranelagh. The entire CBA is going to struggle.
This 14-week saving could be achieved because the tunnel boring machine would be left in the ground from the first phase, the entire works phase would be shorter and the commissioning and running of trials would take less time, the report said.
CatInABox wrote: » The Church on Adelaide Road is on the protected structures list, not much chance of that changing either. They're also not going to do any further digging when it comes time to do the tie in. They'll commission a report to look at all the options, and the one that'll come out on top will be to do the tie in right where the tunnel currently ends.
marno21 wrote: » TII have tendered for utility investigation along the planned routehttps://irl.eu-supply.com/app/rfq/publicpurchase_frameset.asp?PID=145913&B=ETENDERS_SIMPLE&PS=1&PP=ctm/Supplier/publictenders
Dats me wrote: » marno21 wrote: » TII have tendered for utility investigation along the planned routehttps://irl.eu-supply.com/app/rfq/publicpurchase_frameset.asp?PID=145913&B=ETENDERS_SIMPLE&PS=1&PP=ctm/Supplier/publictenders They're only investigating to Ranelagh Luas stop. It's very frustrating that they would "postpone" the Green Line upgrade and not have whether it happens or not subject to this public consultation. I'm going to putting in that an "off-line" solution that would reduce disruption to the Green Line should be put forward, not this tunnel portal under the Green Line tracks shenanigans.
LongboardPro wrote: » A guy from TII said to me that it was either just do the northern section or risk sinking the whole project. So I suppose it is still better than still taking here in 20 years time about the northern section.
spacetweek wrote: The term subway is used in the UK, we call them pedestrian underpasses and there used be one in ballymun which was a hotbed of muggings and ASB so probably isn’t a good idea.
TCM wrote: » Ballymun once had a pedestrian underpass crossing under the old roundabout. It became a no go area for anyone who valued their lives.
CreativeSen wrote: » But my question is really about the impact that Glasnevin will have on Drumcondra Station. The two stations will be 1km apart, is it likely that they will keep Drumcondra open?
loyatemu wrote: » I don't see why not, there are Dart stations that are closer together than 1km.
Qrt wrote: » 1km is a fair distance for an area so close to the city centre, I can't imagine them even contemplating the idea of closing them.