Payton wrote: » You could spend time and money trying to fix this and not get to the bottom of it. Probably better off to pull it all down and reslabbing and skim. Where are you based?
Calahonda52 wrote: » Best find out what is happening above to cause this to happen. Ceiling joists might be too weak,/ not enough bridging/ giving rise to deflections PB might not be fixed properly. Any one you know have a portable CCTV type camera that you could shove up the downlighter, assuming they don't have a flowerpot above
CarPark2 wrote: » Thanks for all the replies. I know this is the DIY forum, but I am very limited in my DIY abilities. "size of joists" etc. is like a foreign language to me! Will a general builder be able to look after the whole thing or would I need to get an engineer to assess it and recommend a solution? If I get a builder in to take down the current ceiling, will it be like a blank cheque, because he will only know what to do (and how much it will cost) when the ceiling is down (and I am committed to going with him)?
Mikayla Hallowed Firefly wrote: » I almost hired one guy based on Google reviews, then noticed that almost all the positive reviews were by he himself (under his own name).
Payton wrote: » Ask around if people got any work done by a plasterer or if they had any work done by a builder. Get 3 quotes and a breakdown of what is included and take it from there.
CarPark2 wrote: » Thanks. So no need for an engineer?
twowheelsonly wrote: » Is it only in this room ? Doubtful that there's any need for an engineer. Any competent builder should be able to repair this quite easily and will advise if they think that there is a need for an engineer. As stated by others get a couple of quotes and get the whole ceiling done. Patchwork is ok if there's one crack but not with the extent of damage that's there now. You'll only end up throwing good money after bad. The whole ceiling should only take a day and leave it as long as you can before painting (at least a week)
Tiercel Dave wrote: » What's overhead, is it a bedroom or attic space?.....
BrokenArrows wrote: » So as mentioned the only proper solution here is to replace the whole ceiling. It wont take very long to do at all and shouldn't be that expensive. Very simple job for any plasterer. If money is tight then you can save yourself a bit my removing the existing boards yourself. This is nothing more than pulling down the existing plasterboard. No special knowledge needed. Just slowly and carefully pull down the whole ceiling. The benefit to this is that you can see for yourself if there are any leaks from the bathroom in advance of the plasterer coming to put up the new ceiling. If you wait until the plasterer comes then hes going to need to stop work if he finds any leaks after pulling down the ceiling which will cause you some delays while you find a plumber to fix a leak. You mentioned that you have work planned for the house next year. If any of this work relates to underfloor plumbing in the bathroom then maybe now is the time to do this rather than waiting until next year.
CarPark2 wrote: » Bathroom.
vicwatson wrote: » No leaks from this on to to plasterboard anywhere??
CarPark2 wrote: » Not that I know of. There isn’t any stain from water damage. But it’s possible that there was a leak in the past (we only bought the house two years ago) and maybe that affected the adherence of the plaster to the plaster board. Re-reading the posts above, a lot of people seem to think that the plaster board has cobe away from the joists. When I feel the bulge it feels more like the skim of plaster has come away from the plasterboard.
CarPark2 wrote: » Thanks for that. We have a first communion in early May. At this stage, I guess it is unrealistic to think that we would have quotes, agreed a price and job complete by then. What do you think?
DublinDilbert wrote: » Was the ceiling stippled then plastered over? I've seen plaster come away from the stipple, but there was also a small leak. As others have said you'll need to cut an access hole to see what's happening.
the_pen_turner wrote: » Personally I wouldn't do it before the communion. It's a dirty messy job . It's only a month away. You are unlikely to get anyone good in the next week or 2 and you will not want the place a building site the week before. That only leaves one week. Its very duable but no room for anything to go wrong