punisher5112 wrote: » Oh god I don't want the displeasure of driving a streetlite
soundman45 wrote: » I think the BE Waterford city services are using Streetlites identical to the GA ones
Joegriffin2019 wrote: » Go Ahead to get at least 5 more SG type next month. Some street lites may be moving....
ax586 wrote: » It's 8
Joegriffin2019 wrote: » Even better if true, heard it was 5 next month until streetlite situation is sorted.
p_haugh wrote: » Will GAI be getting any of the shorter wheelbase Streetlights?
dublinman1990 wrote: » I saw this picture of the 17 on twitter tonight. Wth was that doing trying to turn into Merrion Gates LC?
Yer Da sells Avon wrote: » They probably only went into service this week - give them a break. Unlike most other jobs, bus drivers have to make all their rookie mistakes in public. On my first couple of days, I was constantly stopping either a foot away from the kerb or loudly crunching against it.
Joegriffin2019 wrote: » I was just waiting for the ok to post this, got it a few minutes ago. Also posted by me on facebook. Latest Developments: Go Ahead need at least 10 more double deckers to run full quota of routes.
dfx- wrote: » Does that full quota include just the routes it has now or when it has to run the 18/76 on top? If it's the former, what are they covering the gap with?
SG317 wrote: » So are Dublin Bus getting 5 additional SGs or are they getting 5 less now? Regarding the 59, I don't think it would have been operated by single deckers if they were shorter. As it is interworked with the other DL local routes and the 63 didn't get single deckers even though it is suitable for them. Will the 5 Streetlites affect the allocation of any route also? Also, it seems that the same bus usually does the same route, is this generally the case?
dublinman1990 wrote: » I saw this picture of the 17 on twitter tonight Wth was that doing trying to turn into Merrion Gates LC?
Joegriffin2019 wrote: » Folks I will be out on routes 17A, 104 and 220 on Monday. Ill be wearing a blue hi vis vest if anyone wants to pop up and say hello. Feedback and comments welcome on said above routes.
n!ghtmancometh wrote: » So are DB down 5 new busses because Go Ahead made a balls planning routes and underestimating demand?
devnull wrote: » NTA based the predictions for the size of vehicles required for routes and scheduled departures based on demand when the routes were with Dublin Bus, which I would say was almost certainly based on that of the ticket machine and the number of fares issued, Leap Cards tagged on and DSP passes scanned. Perhaps the data from the ticket machines did not include all the passengers who were actually travelling? There's been talk on this thread previously about a number of passengers just walking on rather than scanning their DSP passes, which would have contributed to these figures and possibly there were people tailgating at busy times too, I've seen this happen and although it's pretty rare, it does happen at busy stops where the driver is distracted by people going up to him or her. At the end of the day DB most likely won't be down any vehicles, they'll just withdraw 5 less vehicles from 2006 and overall the Dublin City Bus service will benefit from this by adding extra capacity. Need to look at these things from a Dublin City Bus network point of view rather than an operators.
RuleNumber6 wrote: » 4 new buses initially due to Go Ahead. 4 more further down the line. These are not yet built let alone painted so no repainting from DB will happen. No Streetlites are moving.
XPS_Zero wrote: » I do have to wonder if Dublin Bus could survive (PR wise) the level of scrutiny now being given to GA
Here we go wrote: » I'm convinced who ever does the buying of busses in the NTA got a brown envelope to buy those street lights