Roger Hassenforder wrote: » Another two fingers from BAM?
ofcork wrote: » I see there are complaints about the mound of rubble left on sullivans quay now.
snotboogie wrote: » December UpdatePlanning/Appealed City Gate Plaza: JCD submitted for planning permission for the construction of an office development at the former Ma/Comm Site.
Cork City Council wrote: Permission for demolition of an existing reservoir and reservoir building and the construction of an office development at the former Ma/Comm Site, Loughmahon Link Road, Mahon, Cork. The proposed development includes two office buildings; Block A will be four floors over ground floor allowing for terraces and Block B will be three floors over ground floor with terraces. The proposed development also includes a ground floor cafadditional car parking, bicycle shelters, security hut, bus shelters, waste management area, landscaping and all associated ancillary site works.
namloc1980 wrote: » I have a feeling the NIMBY objections and uproar if/when BusConnects is being implemented will be multiples of the complaining over the relatively small public transport measure on Patrick Street.
Curb Your Enthusiasm wrote: » Hi all, This BusConnects/Cork Transport Plan cannot come fast enough. Was left standing in the rain tonight in town for over an hour on the South Mall after the 216 failed to show up. Then the 223 came along, at 21.20 and the driver informed us all that the bus was going back to the depot and he had no clue about when or if the 21.20 service would be operating. Something has to be done. And fast. We can't put up with this third-world public transport system in our city any longer. If we all stand up, we'll get somewhere. Hopefully!
cgcsb wrote: » seems to be indicated on the photo montage with new train platforms outside Kent station offering better integration with the proposed luas. Get your train from Blackpool to Kent and get the luas to Mahon/City Gate in under a half hour, regardless of time of day.
Markcheese wrote: » The sooner they upgrade the Midleton - Mallow rail line with extra stops at carrigtohil, Blackpool and near blarney the better...
EnzoScifo wrote: » Having a bridge from the blackpool station to the multistorey car park is a great idea it has to be said. Piggybacking on their facilities is a masterstroke.
questionmark? wrote: » The trams would be too tall for their liking. Would have to be lowered to a height were you could crawl into them. Standing ruins the views!
thejuggler wrote: » Bet An Taisce would prefer if they remained in that state forever more
whisky_galore wrote: » Not that there was an awful lot left, what was a ticket office and some ruins of a building that lost its roof decades ago.
beer enigma wrote: » Overlayed the two images & looks like quite a bit of land being cut back, so I'm presuming the old station buildings will go
hans aus dtschl wrote: » To be even more simplistic about it: how do you remove cars from Douglas Road when houses are directly on it? Seems optimistic at best.
cgcsb wrote: » I'd just point out that metrolink, busconnects and DART expansion projects are now also behind schedule. There is a resourcing problem at the NTA and TII.
whisky_galore wrote: » Our politicians who supposedly represent us would want to make a rattle or it'll be as good as dead.
marno21 wrote: » CMATS delayed until 2019https://www.eveningecho.ie/corknews/Further-delays-to-Cork-LUAS-plan-with-new-2019-publication-date-aca94256-546e-4582-ac65-29dbcf4b3f4c-ds No rush lads.
TheChizler wrote: » I'm seriously sceptical of the scale on the Blackrock Line picture, to my eye it looks like they've visually squeezed two trams and a very wide path into half the space it would actually need. One would have to assume that Jacobs know what they're doing though... Does it look like they're proposing merging the lines as they go under the bridges?
JohnK wrote: » http://3ddesignshop.com/wp-content/uploads/2018/08/12-kent-rail-station-amended-nov-14-2-1024x683-1165x665.jpg
Tomtom364 wrote: » Anyone happen to download these before the company realised their error and disabled the URL?