roadmaster wrote: » Is it not going to be 2+2 from Jnc 14 N33 to the border?
BelfastVanMan wrote: » Not yet; it will start just north of Ardee, where the N52 bypass will peel away from N2 and presumably, the future N2 Ardee Bypass will start, as well.
lucernarian wrote: » BelfastVanMan wrote: » Not yet; it will start just north of Ardee, where the N52 bypass will peel away from N2 and presumably, the future N2 Ardee Bypass will start, as well. Looking at 2017 values, the N33 is like 20% higher volumes than the N2 north of Ardee. If a road is to be 2+2ed, the road with no online housing or businesses, and with the higher traffic volumes ought to be selected? The N2 north of Ardee is hitting about 10k AADT, didn't think that was a good justification for replacing a 0 year old road. Plus having to provide separate (and likely inconvenient to local use) pedestrian and cycling access. Currently is the Aughnacloy section of the A5 dualling to take place in the 2nd or 3rd phase?
BelfastVanMan wrote: » Phase 3; It will be the last bit, yes. I agree with you...The N33 should be dualled at the same time...and ideally the N2 Ardee bypass as well.
circadian wrote: » I know this road is of high standard, what would the speed limit be?
MJohnston wrote: » circadian wrote: » I know this road is of high standard, what would the speed limit be? It's the north, so NSL = 70.
circadian wrote: » Fantastic stuff, I know that road is 60 most of the way but there are large sections where it's pretty dangerous to be hitting 60. Can't wait for a safer, wider road with no high kerbs to your left!
MJohnston wrote: » Given the absolute state of Northern Irish politics at the minute, that's probably an easy choice to make. A much needed upgrade, but kind of pointless to rush it ahead of the Brexit fallout at this stage.We should just resurrect the Sligo to Letterkenny portion of the Atlantic Corridor as a motorway, at this stage, and upgrade the Dublin to Sligo connection.
cgcsb wrote: Well if the axe is going to fall on any particular project it should be this one, which provides close to 0 social or economic benefit to the state. The way things are going, the UK could end up charging us customs duty to use our road that we bought and paid for. Axe it immediately as far as I'm concerned. The government also needs to start proceedings to recover the money we invested into the A8 Belfast-Larne scheme which was funded under the understanding that Irish business could use said road to export to Scotland/North England through Larne tariff/toll free.
marno21 wrote: » We are doing it the other way around. 15km of N4 to start construction this year (Collooney-Castlebaldwin), 75km now in planning (Mullingar-Rooskey & Carrick-Dromod). Ballybofey/Stranorlar BP also in planning.
cgcsb wrote: » Well if the axe is going to fall on any particular project it should be this one, which provides close to 0 social or economic benefit to the state.
Kevwoody wrote: » So Donegal and the Northwest, the most neglected part of Ireland, doesn't need a proper road to Dublin?
Nidgeweasel wrote: » Unless your from Donegal, obviously.
NIMAN wrote: » Sure its forgotten about. Would be typical that this is delayed ..... again. The people of Derry and Donegal are well used to lack of infrastructure. Those in Belfast and Dublin would rather we didn't exist.
cgcsb wrote: Donegal is basically an island, separated from the rest of the country by the Assaroe lake, with the bridge in Ballyshannon and the new Ballyshannon bypass being the only crossing points. So obviously access is going to be difficult.