marno21 wrote: » https://twitter.com/BAMIrl_/status/1052189214865940480 Some snaps from Twitter.
m17 wrote: » The barrow crossing 21/10/18 pic form fb page
allthedoyles wrote: »
jvan wrote: » How far out from the piers can the deck be built before it has to be supported by cables from the main tower?
Carawaystick wrote: » The photos show a serious cantilever alright
jvan wrote: » That was my thoughts too, the latest photos even more so. I'm not an engineer but didn't realise it could support itself so far out.
Muahahaha wrote: » Amazing pics & vids thanks for sharing. Anyone know the engineering reason why the bridge seems so high over the water? Is it something to do with the topography either side of the river or another reason?
Harry Palmr wrote: » When it is due to open? the N25 wiki page really needs updating if someone is up for it.
Azatadine wrote: » Seems to be delayed until late 2019.
blindsider wrote: » Is that official? Real shame if there is an 18 month delay! Was that announced publicly?
m17 wrote: » The barrow crossing 12/11/18
serfboard wrote: » Wow - how high is that crane and how long does it take the crane operator to get up there?
m17 wrote: » It takes 25 mins to get to the cab and he has to bring he's own bucket