Cantona's Collars wrote: » Farmers protesting on parts of the scheme. According to SE Radio there's a pond for runoff near Camolin that's leaking into land. Gates aren't right somewhere else.
oceanman wrote: » there may be a built in bonus in the contract for finishing early.
kneemos wrote: » One of them had a flood in June apparently. Where there's a farmer there's a grievance.http://enniscorthyguardian.newspaperdirect.com/epaper/iphone/homepage.aspx#_article53e657ec-c5f1-4424-a883-99eb30107338/waarticle53e657ec-c5f1-4424-a883-99eb30107338/53e657ec-c5f1-4424-a883-99eb30107338/0/true
kneemos wrote: » https://www.agriland.ie/farming-news/third-blockade-in-place-as-wexford-farmers-up-the-ante/ When one blockade doesn't work.
Farmers want the deals that had been agreed initially to be carried out as originally planned.
farmers are frustrated as the road construction company is “making no effort whatsoever to cooperate with farmers”. Murphy said that, to date, requests to meet with BAM Construction have received no response.
Reuben1210 wrote: » It's ridiculous that some of the subbies and workers on the scheme are getting into the photo-op too!
MichealD wrote: » https://www.agriland.ie/farming-news/agreement-reached-between-wexford-farmers-and-bam-construction/ Agreement reached between Wexford farmers and BAM Construction.
MichealD wrote: » I noticed that those links were broken last week. This one seems to be working now. Detail drawings at the end.https://www.wexfordcoco.ie/largefiles/M11_Gorey_EIS/M11%20G2E%20EIS%20Volume%201%20NTS.pdf
Silent Running wrote: » I asked this recently and the quoted post has the link for a detailed map. The junction can be accessed by a 2 way link road. Edit, just tried that link again and it seems to be dead. I'll try to find the PDF. I'm sure I downloaded it.
thethinker wrote: » Does anyone have a proper map or text detailing the interchange with the R744. Looking at the crudely drawn map on the Wex CoCo website, it looks like you can't join the motorway, and can only exit if travellinging south.
kneemos wrote: » Not a great design if you've got to travel all the way North to the interchange to backtrack south.
thethinker wrote: » So I reckon anyone from east side of town will use the R744 to access/exit the motorway. I wonder if people from the west side will do the same or use scarawalsh roundabout instead - definitely longer but perhaps quicker.
kneemos wrote: » Bit to do there still.
vicwatson wrote: » Huge amount can be done in 6 months https://www.boards.ie/vbulletin/showpost.php?p=107865024&postcount=1358
kneemos wrote: » There's overpases/underpasses to construct presumably if it's a spaghetti junction type deal?
vicwatson wrote: » Thought a poster said earlier that all that work had been done already.