sea12 wrote: » They are progressing very well with clearing hedge and removing subsoil. They have 3 diggers clearing subsoil and a line of trucks to clear it. Some contrast to the approach last Jan in phase 1. Allot of phase 1 has now being dig out and refilled with hardcore stone. Central concrete drainage is done for about a third of it. Good to see physical progress taking shape.
pad199207 wrote: » Since Naas has Naas North as J9 and Naas South for J10 , will the new junction 9a be for Naas West?
kooga wrote: » Any idea why major infrastructure work such as this can't go 24 hours a day - seems an awful long time to take to widen a road - and out of comparison would such a project be 24 hour elsewhere internationally ? Thank you
rameire wrote: » I was driving the M7 on Friday from the Jn 15 and then into the roadworks section. so put the cruise control on at 62. not to long afterwards nearly got plowed by a TK max truck, and two Dublin Coach Buses. the coaches had no intention on slowing down from their speed which I assume was around 90. I hope Dublin Coach have a stockpile ready for all the speeding fines they are to get from monday. The majority of vehicles didnt slow down, but there were a good few who did. as for the works, its starting to look good. They were pouring the cement drains, and shaving the bushes.
rameire wrote: » I was driving the M7 on Friday from the Jn 15 and then into the roadworks section. so put the cruise control on at 62. not to long afterwards nearly got plowed by a TK max truck, and two Dublin Coach Buses. the coaches had no intention on slowing down from their speed which I assume was around 90.
loyatemu wrote: » I was on it last week and thought 80 would be a reasonable limit given the layout - I tried doing 60 and felt unsafe as most of the other traffic barrelled past me doing 100+.
CeilingFly wrote: » gardai accepting that it was a limit that could not be enforced.
CeilingFly wrote: » they put up an impossible limit of 60kmh MAX and 99% of motorists ignore it because its simply STUPID. Put a 80kmh limit and you'll find most motorist will respect it because its more reasonable.
loyatemu wrote: » physically slow the traffic down using narrower lanes and chicanes.
Deedsie wrote: » Surely it is a health and safety consideration for the staff working on the site?
CeilingFly wrote: » Barriers in place can withstand a collision of 120kmh. They are the same barriers used in the Uk and the limits there are 50mph/60mph (approx. 80kmh/100kmh) during roadworks
_Kaiser_ wrote: » Big thick concrete/metal barriers separating them from the traffic. No reason whatsoever that 80 km/h couldn't be the limit except that someone submitted it as 60 km/h and now someone else can't be arsed re-filing the paperwork to change it. 60 km/h is too slow for the current level of works on the site. If they reduce it to a single lane and it's at night (as I've seen them do), then fair enough. Otherwise people just ignore it completely and instead of a sensible pace, you get idiots barreling through at 100+. Most people will instinctively obey a sensible limit. For those who still act the clown there's AGS.
tails_naf wrote: » Can't get over how slow the widening section is to complete. I understand approx 1 year for this is alotted, but driving past this today, with the terrible traffic, and got plenty of time observe very little work, or indeed workers - clearly this could be done much faster, and bring some relief to the poor folks forced to drive / commute this daily.
Patww79 wrote: » People will mostly do 20-30 over the limit...
Trampas wrote: » The 3 contractors got told to speed up a month or two ago. The widening was suppose to be finished first but other work was heading that way
harr wrote: » So was on M7 this morning driving my young lad to match in Naas obviously no work being done on a Saturday yet traffic was still backed up considerably and was particularly at a standstill at times. Madness for early Saturday morning traffic. No sign of speed vans