L1011 wrote: » Presuming you mean from the Heuston side with that routing. Would have to leave after Hazelhatch at the latest and even then threading a twin track line over from there would be tricky without demolition or severe CPOs (Weston Airport)
veryangryman wrote: » If we ever get rial to airport, maybe this could be considered, save the poor souls who don't want to go into city. Maybe something that cuts through Lucan, Clonsilla and heads up to airport that way Would cover every Irish city in the Republic so i imagine there's an economic case for it. Thoughts?
GerardKeating wrote: » That's what Metro-West could have given perhaps ?
Grandeeod wrote: » I also remember an unofficial proposal to connect the Cork and Sligo lines.
Stephen15 wrote: » That would serve the same purpose as the PPT surely?
Grandeeod wrote: » It was a circle line idea including the PPT.
veryangryman wrote: » If we ever get rial to airport,
Stephen15 wrote: » Sounds like a bit of a bizarre idea
IE 222 wrote: » Yeah I think this was the platform for change plan around 2000s. There was also the older plan to tunnel from Sandymount to Broadstone and back then it also was planned for a Connolly- Hueston Tunnel with Templebar to have an interconnector station. A Dart spur to Blanc and Tallaght was also apart of the plan.
Sam Russell wrote: » Surely Metrolink would achieve everything that could be achieved by such a spur. I suppose it could follow the M50, but why? It would need frequencies beyond those of mainline services just to feed the airport. Metrolink is your only man.
Grandeeod wrote: » The site is old and a bit all over the place so you'll have to take your time navigating it.