JupiterKid wrote: » Good to hear. The N55 from Athlone to Edgeworthstown in particular is an atrocious section of road. Is the Centre Parcs proposal for Ballymahon actually going ahead? I had heard of its announcement but nothing since.
road_high wrote: » Good, this road is like a rollercoaster coming out of Athlone. The angle dips are incredible for a national road.
elperello wrote: » You are right but I'll miss that car park at the top of the hill. Great view over the Inner Lakes and out to Lough Ree. One of the best inland views in Ireland.
whyulittle wrote: » Allow up to 6 years according to this!http://www.shannonside.ie/news/local/longford/full-upgrade-n55-ballymahon-athlone-take-six-years/
JupiterKid wrote: » Surely a planning prerequisite for the CenterParcs development would be that the local roads that will serve the complex are upgraded? This is putting the cart before the horse. CenterParcs are very large facilities that draw in a lot of people. How will the N55 and other local roads cope?
Med101007 wrote: » Can anyone tell me where exactly the Center Parcs development is taking place? Is the site located on the Athlone side of Ballymahon? I need to visit the site offices tomorrow and I don't really know the area that well.
roadmaster wrote: » N55 Public Consultation Extendedhttp://www.midlands103.com/news-centre/n55-public-consultation-extended/
veryangryman wrote: » N61 (Athlone to Sligo (N34)), N62 (Cork to Athlone (N35)) etc. I think it should go one further and reassign parts of each road. N61 should only be made primary from Athlone to Roscommon (as its a star junction of sorts for other secondary routes) The routes from there on not so much. Those going to Sligo (outside of Athlone to Sligo traffic, not much) would use the N4 or N17, both of which with upgrades planned. Roscommon to Boyle, leave as secondary. Little to no traffic. Straighten out some bits but generally that's getting done already. N62... Ah c'mon. Athlone to Cork can be achieved much safer and faster by going M6->N52->N80->M7->M8. The N80 Tullamore to Portlaoise upgrade when done will copper fasten that (and back up the need for alot of N52 to be primary). In fact when M20 is complete, you can get to Cork doing M6->M18->M20. Nobody should have to go near Birr and/or the bogs without actually wanting to go there in the first place. Lets spend the pennies we get for Infrastructure wisely.
roadmaster wrote: » Does anyone know what option the locals are more in favor off?
medoc wrote: » The preferred route has been announced today.https://www.westmeathindependent.ie/news/roundup/articles/2019/06/26/4176134-preferred-route-for-new-n/