munchkin_utd wrote: » - N55 Kepack to the Pidgeons, 6km approx directly south of Ballymahon, bypassing Tang (which is barely a settlement let alone a village) is in early stages of planning . There was 200 at a public meeting there, so not sure if thats a good or bad sign .http://www.shannonside.ie/?s=n55
The proposed development will consist of the realignment of the N55 National Secondary Route in the townlands of Ballytrust, Ballytrust Lower, Legwee, Drumcor, Killydoon, Drumbannow, Grousehall and Mullaghoran comprising the construction of a single carriageway road for a distance of 3.75 km from a location at Ballytrust (at the tie-in of Section A of the Scheme)<snip> to a location at Mullaghoran<snip>
D Trent wrote: » Shane Ross finally pulling the finger out ?http://www.thejournal.ie/road-safety-upgrades-3382779-May2017/?utm_source=facebook_short
munchkin_utd wrote: » on the N55 - N55 Corduff to South of Killydoon Realignment Scheme is funded and tendered for, just waiting now for news on a start (so south of Ballinagh, further removing bad sections of the road not already tackled) http://www.anglocelt.ie/news/roundup/articles/2017/02/15/4134991-council-defers-adoption-of-roads-budget/ Contracts Signed for this jobhttp://www.cavancoco.ie/Default.aspx?StructureID_str=255&guid=2039
ELCAT2009 wrote: » The design for the N17 from Milltown to Carrownurlar section to link up with previously upgraded Carrownurlar to Ballindine section is currently under way. Rumors have it that some houses will need to be knocked...anyone have any insider information?
<snip> Contracts Signed for this jobhttp://www.cavancoco.ie/Default.aspx?StructureID_str=255&guid=2039
marno21 wrote: » Especially if the N17 Tuam-Claremorris scheme is to progress in the next few years
ELCAT2009 wrote: » The design for the N17 from Milltown to Carrownurlar section to link up with previously upgraded Carrownurlar to Ballindine section is currently under way.
serfboard wrote: » ELCAT2009 wrote: » The design for the N17 from Milltown to Carrownurlar section to link up with previously upgraded Carrownurlar to Ballindine section is currently under way. That's good to hear. This will remove the last of the sh1tty sections on the N17 in Galway and Mayo. There'll be only the Curry->Ballinacarrow section in Sligo left.
Donegal Storm wrote: » Only a short realignment but it'll make a difference along there, it's a narrow windy road that gets very busy morning and evening with commuters. A shame they couldn't put the money towards the much more badly needed Bonagee link road but better than nothing.
marno21 wrote: » Bonagee link road is in planning, and is fully funded for 2017 to get it through Phases 1-4 of the TII process.