claytonie wrote: » Was in Fisherstown, Co. Kildare yesterday and all the phone poles had blue PVC subduct run to them. Fisherstown on the map is completely made of blue lines and is due for Winter 2016. Was feeling a bit envious as I'm based in Kildangan (due H2 2017) but this morning a KN networks van arrived and they have just pulled the subduct through to my phone pole. Was speaking with the guys as they were just using a shovel to dig down to access the existing duct and they are currently going around the country (were in Kiltegan last week) trying to pull subduct on any poles where they can which don't require machinery to be used. If for any reason machinery is needed its sent back to the planners to allocate a different team but this can delay things a couple of months depending on the additional work required.Interesting thing is the blue line on http://fibrerollout.ie/where-and-when/ for our road extends about 1km down the road but on the plans the guys doing the ducting have they only go 500m.
ItHurtsWhenIP wrote: » It's possible that the remaining 500m is strung along the poles rather than in ducting.
TechSupport wrote: » I posted this in another thread too: Ref: Allenwood South, Co. Kildare: They started digging in Allenwood South about 3-4 weeks ago and put in new manholes. One of the ducts along the canal was blocked so they said they would need permission to open the road from Kildare County Council and that might take a while. They were back out within a few days and dug it up, so everything is full steam head.
ED E wrote: » Its telling you there's FTTC somewhere in the exchange boundary. Thats all.
Falcon L wrote: » On a blue line, FTTH listed for H2 2017. A couple of months ago all the poles on the OH route feeding our house were barcoded and those that were leaning or showing rot were also given the red D. Today, KN arrived and installed a pipe between two poles where the cable went UG to pass under ESB lines. The pipe has a draw string in it, but looks quite small. I presume this is to facilitate the installation of the fiber cable.
Allison Puny Appetite wrote: » Falcon L wrote: » On a blue line, FTTH listed for H2 2017. A couple of months ago all the poles on the OH route feeding our house were barcoded and those that were leaning or showing rot were also given the red D. Today, KN arrived and installed a pipe between two poles where the cable went UG to pass under ESB lines. The pipe has a draw string in it, but looks quite small. I presume this is to facilitate the installation of the fiber cable. Yeah it is ducting. If it is similar to the ducting I have seen elsewhere it will have "Eircom Fibre Optic 20/16" on it. The 20/16 is the outside/inside diameter in mm.
Jakes26 wrote: » Hi All , I just noticed on the Fibre Rollout Map that Youghal , Co. Cork has a Go-Live date of 28-SEP for what looks like Rural FTTH. This might be a indication that things are starting to move....
Falcon L wrote: » OK off I go to read the duct. Edit: Yup, that's what it says alright.
ED E wrote: » @Navi who's got legal ownership of the lane, you or the coco or you + next door? If I were you Id be fixing to make things easy for them.
long_b wrote: » @navi from what I've been reading sounds like they have been doing the "low hanging fruit" work first and the rest of it may be being scheduled as a different work order, perhaps a more hard core digging crew?
pegasus1 wrote: » YMCA comes to mind lol
Allison Puny Appetite wrote: » Just in relation to the ducting issue. My house is on a blue line with a Winter/spring date. It is actually the last house on the line. We live on basically a lane off a regional road. The line to my house originally was overground all the way but about ten years ago Eircom put a span between two poles underground due to three massive trees. Anyway about a month ago KN I presume came to the area doing their ducting work as above. Unfortunately I missed them but I could see where they had dug at each pole. However when Eircom did the original work they only intalled a plastic pipe that was slightly larger than the copper cable inside it. KN had no way of pushing their ducting through. So they filled in their holes and left. I have not seen them since. My fear now is that my little lane will be abandoned. They would probably have do dig about 30M to install ducting to enable fibre for two houses. I can see it being left for the NBP. It's never easy is it?
rob808 wrote: » Im the same as you my pole inside my property and I have ducting as my line goes underground from the pole.I don't mind if they pull out the copper and put in the Fibre.I have yet to see anybody from open eir I'm down for winter 16/Spring 17 and other people that are H2017 seeing open eir doing pole marking are seem strange.
JohnC. wrote: » Saw an eir van with guys fiddling with a few poles down the road. Some poles have gained the legendary D plate and one got some other kind of marker or something.
Allison Puny Appetite wrote: » Openeir published their weekly update of premises today. There is no mention of any FTTH connections. I wonder is is that the three areas did not go live today or perhaps they are not going to publish premises numbers for rural FTTH.http://www.openeir.ie/Techbytes/open-eir-brings-high-speed-broadband-to-more-than-1001-additional-premises-nationwide/